Peters Design-Build Inc.
- Based in
- San Francisco
- On San Francisco permits
- Oct 2015 to Nov 2022
- Last 24 months
- 0 permits filed
27 permits since 2000: 18 completed, 3 never finaled, 6 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 4 completed. Typically 128 days from filing to permit and 474 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 3, 2020 | Completed final sign-off Apr 2023 | 2201 16th Av | convert portion of (e) 1/f garage to living space. reconfigure (e) stair, remodel (e) bathroom & kitchen on 2/f infill light wel. landscaping in rear yard.Details
convert portion of (e) 1/f garage to living space. reconfigure (e) stair, remodel (e) bathroom & kitchen on 2/f infill light wel. landscaping in rear yard. | $125,000 |
| Jul 7, 2020 | Completed final sign-off Mar 2021 | 1979 30th Av | repair (e) decks structure and add (n) spiral stair from deck to rear yard, replace (e) timber retaining wall with concrete and reconfigure site stairDetails
repair (e) decks structure and add (n) spiral stair from deck to rear yard, replace (e) timber retaining wall with concrete and reconfigure site stair | $5,000 |
| Nov 21, 2019 | Completed final sign-off May 2021 | 710 43rd Av | new stair to lower level, new master suite at rear ground level, associated struct work. relocate (e) bathroom upstairs and install on g/f.Details
new stair to lower level, new master suite at rear ground level, associated struct work. relocate (e) bathroom upstairs and install on g/f. | $75,000 |
| Dec 22, 2017 | Completed final sign-off Jan 2020 | 2409 Green St | new exterior spiral stair connecting 2nd floor den to new 360 sq ft. roof deck and firewall @ property line. ** maher: n/a **Details
new exterior spiral stair connecting 2nd floor den to new 360 sq ft. roof deck and firewall @ property line. ** maher: n/a ** | $15,000 |