Peters Design-Build Inc.
- Based in
- San Francisco
- On San Francisco permits
- Oct 2015 to Nov 2022
- Last 24 months
- 0 permits filed
27 permits since 2000: 18 completed, 3 never finaled, 6 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 2 completed, 1 never finaled. Typically 263 days from filing to permit and 532 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 18, 2021 | Never finaled issued Nov 2021, no final | 631 Ofarrell St | #2101: kitchen, bathroom & laundry room remodel.Details
#2101: kitchen, bathroom & laundry room remodel. | $80,000 |
| Dec 3, 2020 | Completed final sign-off Apr 2023 | 2201 16th Av | convert portion of (e) 1/f garage to living space. reconfigure (e) stair, remodel (e) bathroom & kitchen on 2/f infill light wel. landscaping in rear yard.Details
convert portion of (e) 1/f garage to living space. reconfigure (e) stair, remodel (e) bathroom & kitchen on 2/f infill light wel. landscaping in rear yard. | $125,000 |
| Oct 27, 2015 | Completed final sign-off Jul 2018 | 1251 40th Av | remodel (e) 2 story bldg. reconfigure (e) 1st fl over garage to 1 bedroom & two bath. add family room & bathroom to (e) footprint of garage level, replace garage floor slab at (e) elevation, move front entrance from 2nd floor to 1st floor, remodel (e) kitchen & bath.Details
remodel (e) 2 story bldg. reconfigure (e) 1st fl over garage to 1 bedroom & two bath. add family room & bathroom to (e) footprint of garage level, replace garage floor slab at (e) elevation, move front entrance from 2nd floor to 1st floor, remodel (e) kitchen & bath. | $450,000 |