Peters Design-Build Inc.
- Based in
- San Francisco
- On San Francisco permits
- Oct 2015 to Nov 2022
- Last 24 months
- 0 permits filed
27 permits since 2000: 18 completed, 3 never finaled, 6 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 72 days from filing to permit and 140 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 7, 2020 | Completed final sign-off Mar 2021 | 1979 30th Av | repair (e) decks structure and add (n) spiral stair from deck to rear yard, replace (e) timber retaining wall with concrete and reconfigure site stairDetails
repair (e) decks structure and add (n) spiral stair from deck to rear yard, replace (e) timber retaining wall with concrete and reconfigure site stair | $5,000 |
| Jun 27, 2019 | Completed final sign-off Dec 2019 | 1573 34th Av | (n) deck less 30 inches above grade, landscaping and hot tub in rear yardDetails
(n) deck less 30 inches above grade, landscaping and hot tub in rear yard | $25,000 |