Back to bathroom remodel contractors
Peters Design-Build Inc.
- Based in
- San Francisco
- On San Francisco permits
- Oct 2015 to Nov 2022
- Last 24 months
- 0 permits filed
27 permits since 2000: 18 completed, 3 never finaled, 6 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 5 completed, 1 never finaled. Typically 92 days from filing to permit and 487 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 8, 2021 | Completed final sign-off Mar 2023 | 1534 44th Av | remodel (e) 1 full bath @ 2nd fl in-kind finish & fixture replacementDetails
remodel (e) 1 full bath @ 2nd fl in-kind finish & fixture replacement | $1,200 |
| Feb 18, 2021 | Never finaled issued Nov 2021, no final | 631 Ofarrell St | #2101: kitchen, bathroom & laundry room remodel.Details
#2101: kitchen, bathroom & laundry room remodel. | $80,000 |
| Dec 3, 2020 | Completed final sign-off Apr 2023 | 2201 16th Av | convert portion of (e) 1/f garage to living space. reconfigure (e) stair, remodel (e) bathroom & kitchen on 2/f infill light wel. landscaping in rear yard.Details
convert portion of (e) 1/f garage to living space. reconfigure (e) stair, remodel (e) bathroom & kitchen on 2/f infill light wel. landscaping in rear yard. | $125,000 |
| Feb 28, 2020 | Completed final sign-off May 2021 | 720 05th Av | add home office & full bath @ rear of ground floor.Details
add home office & full bath @ rear of ground floor. | $10,000 |
| Nov 21, 2019 | Completed final sign-off May 2021 | 710 43rd Av | new stair to lower level, new master suite at rear ground level, associated struct work. relocate (e) bathroom upstairs and install on g/f.Details
new stair to lower level, new master suite at rear ground level, associated struct work. relocate (e) bathroom upstairs and install on g/f. | $75,000 |
| Oct 27, 2015 | Completed final sign-off Jul 2018 | 1251 40th Av | remodel (e) 2 story bldg. reconfigure (e) 1st fl over garage to 1 bedroom & two bath. add family room & bathroom to (e) footprint of garage level, replace garage floor slab at (e) elevation, move front entrance from 2nd floor to 1st floor, remodel (e) kitchen & bath.Details
remodel (e) 2 story bldg. reconfigure (e) 1st fl over garage to 1 bedroom & two bath. add family room & bathroom to (e) footprint of garage level, replace garage floor slab at (e) elevation, move front entrance from 2nd floor to 1st floor, remodel (e) kitchen & bath. | $450,000 |