Oscar E Maldonado
- Based in
- San Francisco
- On San Francisco permits
- Mar 2013 to Jul 2026
- Last 24 months
- 5 permits filed
29 permits since 2000: 18 completed, 7 in progress, 4 never finaled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 1 completed, 2 in progress, 1 never finaled. Typically 53 days from filing to permit and 428 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 5, 2024 | In progress issued Dec 2024 | 22 Valley St | revise pa 2024-0319-8162 to document/include additional scope comprised of roof deck and interior stairs as well as minor changes due to field conditions.Details
revise pa 2024-0319-8162 to document/include additional scope comprised of roof deck and interior stairs as well as minor changes due to field conditions. | $49,455 |
| Dec 7, 2023 | In progress issued Oct 2024 | 231 Topaz Wy | increased roof height and addition of roof deck with roof access stair. existing exterior cladding and windows require full replacement. new perimeter fence, and landscape improvements.Details
increased roof height and addition of roof deck with roof access stair. existing exterior cladding and windows require full replacement. new perimeter fence, and landscape improvements. | $450,000 |
| Nov 17, 2016 | Never finaled issued Nov 2016, no final | 2510 Van Ness Av | repair wood rot on side stairs, less than 50%Details
repair wood rot on side stairs, less than 50% | $2,200 |
| Mar 29, 2013 | Completed final sign-off Jun 2014 | 727 Guerrero St | repair rear egress stairs. less than 50%. and to comply with violation #201394161. same for same.Details
repair rear egress stairs. less than 50%. and to comply with violation #201394161. same for same. | $10,000 |