Oscar E Maldonado
- Based in
- San Francisco
- On San Francisco permits
- Mar 2013 to Jul 2026
- Last 24 months
- 5 permits filed
29 permits since 2000: 18 completed, 7 in progress, 4 never finaled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 7 completed, 2 in progress, 1 never finaled. Typically 41 days from filing to permit and 322 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 11, 2025 | In progress issued Jul 2025 | 249 Topaz Wy | renovation of (e) 3 story single family residence including new wood flooring. renovate kitchen and bathrooms, new skylight and sliding glass doors to access the exterior. reconfiguration of 1/f rooms, new mini split mechanical system and heat pump water heater. new perimeter fence, roof, andDetails
renovation of (e) 3 story single family residence including new wood flooring. renovate kitchen and bathrooms, new skylight and sliding glass doors to access the exterior. reconfiguration of 1/f rooms, new mini split mechanical system and heat pump water heater. new perimeter fence, roof, and | $250,000 |
| Mar 28, 2025 | Completed final sign-off Jul 2026 | 2731 38th Av | interior renovation of (e) single family dwelling consisting of conversion of ground floor basement/garage into habitable space, replacement floor slab and foundations, renovated bathroom, relocated gas furance, new gas hwh, and assoc. electrical work; and enclosure of (e) undercroft into habitableDetails
interior renovation of (e) single family dwelling consisting of conversion of ground floor basement/garage into habitable space, replacement floor slab and foundations, renovated bathroom, relocated gas furance, new gas hwh, and assoc. electrical work; and enclosure of (e) undercroft into habitable | $251,027 |
| May 22, 2024 | Completed final sign-off Oct 2024 | 85 Cerritos Av | remodel existing hall bathroom, new tub, new toilet, new vanity & sink. install tile on floor and partial wall.Details
remodel existing hall bathroom, new tub, new toilet, new vanity & sink. install tile on floor and partial wall. | $22,700 |
| Apr 7, 2024 | In progress issued Aug 2024 | 22 Valley St | interior remodel of upper lvl renovation of kitchen, relocate bathroom, 2 new bathrooms, rlocated laundry, select new or alter windows & doors. replace rear roof. associated electrical & plumbing. new duct heat pump & heat pump hot water heaterDetails
interior remodel of upper lvl renovation of kitchen, relocate bathroom, 2 new bathrooms, rlocated laundry, select new or alter windows & doors. replace rear roof. associated electrical & plumbing. new duct heat pump & heat pump hot water heater | $430,405 |
| Oct 13, 2023 | Completed final sign-off May 2025 | 111 Day St | alteration to existing dwelling comprised of baseement conversion (addition of cfa) into new bedroom, new bathroom, and relocated laundry, including new underpinning foundations, new floor slab, and voluntary retrofit; subdivision of existing upper level bedroom into two (five bedrooms total);Details
alteration to existing dwelling comprised of baseement conversion (addition of cfa) into new bedroom, new bathroom, and relocated laundry, including new underpinning foundations, new floor slab, and voluntary retrofit; subdivision of existing upper level bedroom into two (five bedrooms total); | $300,434 |
| Apr 7, 2021 | Completed final sign-off Apr 2022 | 111 Day St | selective demo and remodel of 2nd flr to create new kitchen and new bathroom including selective window and door replacement. associated structural and mep work.Details
selective demo and remodel of 2nd flr to create new kitchen and new bathroom including selective window and door replacement. associated structural and mep work. | $76,029 |
| Dec 19, 2019 | Never finaled issued May 2020, no final | 30 Macedonia St | 295 gsf to be added to extg envelope on lvl 1, currently garage & storage. nw rooms will include master bed & bath &laundry room. proposed rear deck and siding replacement at rear, new openings to deck and yard. move column and level 2 interior.minor excavation for nw shear wall footing<50 cu.yardsDetails
295 gsf to be added to extg envelope on lvl 1, currently garage & storage. nw rooms will include master bed & bath &laundry room. proposed rear deck and siding replacement at rear, new openings to deck and yard. move column and level 2 interior.minor excavation for nw shear wall footing<50 cu.yards | $70,000 |
| Jul 22, 2019 | Completed final sign-off Jul 2019 | 86 Midcrest Wy | revision to pa #201806071273. to clarify scope of work to include conversion of garage area to bedroom & bathroom.Details
revision to pa #201806071273. to clarify scope of work to include conversion of garage area to bedroom & bathroom. | |
| Feb 20, 2019 | Completed final sign-off Feb 2020 | 2786 42nd Av | revision to 201812037278, adding 1 more bathroom in ground floor, remodeling the deck and two new doors in 1st fl.Details
revision to 201812037278, adding 1 more bathroom in ground floor, remodeling the deck and two new doors in 1st fl. | $20,000 |
| Dec 3, 2018 | Completed final sign-off Feb 2020 | 2786 42nd Av | kitchen remodel, upper bath remodel, conversion of (e) unfinished ground fl space to add (2) bedrooms & (1) new bath, replace (e) windows on the front facade, enlarging two e(e) windows at rear facade & adding (1) new window to rear facadeDetails
kitchen remodel, upper bath remodel, conversion of (e) unfinished ground fl space to add (2) bedrooms & (1) new bath, replace (e) windows on the front facade, enlarging two e(e) windows at rear facade & adding (1) new window to rear facade | $110,000 |