Oscar E Maldonado
- Based in
- San Francisco
- On San Francisco permits
- Mar 2013 to Jul 2026
- Last 24 months
- 5 permits filed
29 permits since 2000: 18 completed, 7 in progress, 4 never finaled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 1 completed, 1 never finaled. Typically 92 days from filing to permit and 322 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 19, 2019 | Never finaled issued May 2020, no final | 30 Macedonia St | 295 gsf to be added to extg envelope on lvl 1, currently garage & storage. nw rooms will include master bed & bath &laundry room. proposed rear deck and siding replacement at rear, new openings to deck and yard. move column and level 2 interior.minor excavation for nw shear wall footing<50 cu.yardsDetails
295 gsf to be added to extg envelope on lvl 1, currently garage & storage. nw rooms will include master bed & bath &laundry room. proposed rear deck and siding replacement at rear, new openings to deck and yard. move column and level 2 interior.minor excavation for nw shear wall footing<50 cu.yards | $70,000 |
| Feb 20, 2019 | Completed final sign-off Feb 2020 | 2786 42nd Av | revision to 201812037278, adding 1 more bathroom in ground floor, remodeling the deck and two new doors in 1st fl.Details
revision to 201812037278, adding 1 more bathroom in ground floor, remodeling the deck and two new doors in 1st fl. | $20,000 |