Block 0526, lot 017
2510 Van Ness Ave
- City’s use
- Multi-Family Residential
- Built
- 1924
- Stories
- 3
- Units
- 12
- Rooms
- 12 bathrooms
- Building
- 15,163 sq ft
- Lot
- 7,014 sq ft
- Zoning
- RC3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
17 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 15, 2020 | Completed final sign-off Dec 2020 | 2510 Van Ness Av | Canche Construction Inc | units 5 & 6: replace kitchen cabinets, countertop, sink & dishwasher. install new outlets. to comply wit complaint 202057801Details
units 5 & 6: replace kitchen cabinets, countertop, sink & dishwasher. install new outlets. to comply wit complaint 202057801 | $4,000 |
| May 11, 2020 | Completed final sign-off May 2021 | 2510 Van Ness Av | Canche Construction Inc | compliance with mandatory seismic retrofit program per sfebc chapter 4d and 2016 cebc appendix a-4Details
compliance with mandatory seismic retrofit program per sfebc chapter 4d and 2016 cebc appendix a-4 | $40,000 |
| Jun 11, 2018 | Expired or cancelled expired Apr 2020 | 2510 Van Ness Av | voluntary install of anchor bolts 5/8" on center galvanized at 32"o.c. with 3"x3"x0.229 galv washer. concrete with set xp epoxyDetails
voluntary install of anchor bolts 5/8" on center galvanized at 32"o.c. with 3"x3"x0.229 galv washer. concrete with set xp epoxy | $4,000 | |
| Sep 15, 2017 | Expired or cancelled cancelled Jan 2026 | 2510 Van Ness Av | soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4. maher naDetails
soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4. maher na | $90,000 | |
| Nov 17, 2016 | Never finaled issued Nov 2016, no final | 2510 Van Ness Av | Oscar E Maldonado | repair wood rot on side stairs, less than 50%Details
repair wood rot on side stairs, less than 50% | $2,200 |
| Nov 14, 2016 | Expired or cancelled cancelled Jan 2026 | 2510 Van Ness Av | replace existing wood retain wall at yard with reinforced concrete. add guardrail at top of wall. add voluntary square footing at rear fdntnDetails
replace existing wood retain wall at yard with reinforced concrete. add guardrail at top of wall. add voluntary square footing at rear fdntn | ||
| Mar 14, 2016 | Completed final sign-off Mar 2016 | 2510 Van Ness Av | Oscar E Maldonado | to renew pa# 201502138397 & 201306250464 for a final inspection, all work is completeDetails
to renew pa# 201502138397 & 201306250464 for a final inspection, all work is complete | |
| Feb 13, 2015 | Completed final sign-off Mar 2016 | 2510 Van Ness Av | Oscar E Maldonado | to comply with nov# 201516591. replace siding & repair stucco. not visible from street. ** maher: compliance with ordinance no# 155-13 not required **Details
to comply with nov# 201516591. replace siding & repair stucco. not visible from street. ** maher: compliance with ordinance no# 155-13 not required ** | $5,000 |
| Sep 16, 2014 | Never finaled issued Sep 2014, no final | 2510 Van Ness Av | street spaceDetails
street space | ||
| May 7, 2014 | Never finaled issued May 2014, no final | 2510 Van Ness Av | street spaceDetails
street space | ||
| Dec 5, 2013 | Never finaled issued Dec 2013, no final | 2510 Van Ness Av | street spaceDetails
street space | ||
| Sep 16, 2013 | Never finaled issued Sep 2013, no final | 2510 Van Ness Av | street spaceDetails
street space | ||
| Aug 13, 2013 | Never finaled issued Aug 2013, no final | 2510 Van Ness Av | street spaceDetails
street space | ||
| Jul 11, 2013 | Never finaled issued Jul 2013, no final | 2510 Van Ness Av | street space permitDetails
street space permit | ||
| Jun 25, 2013 | Completed final sign-off Mar 2016 | 2510 Van Ness Av | Oscar E Maldonado | repair section of damaged stucco approx 10'(2), front of building less than 50%.Details
repair section of damaged stucco approx 10'(2), front of building less than 50%. | $1,500 |
| Aug 22, 2003 | Completed final sign-off Sep 2003 | 2510 Van Ness Av | Chung Kee Construction Co. | repair existing back stair (less than 50% being replaced)Details
repair existing back stair (less than 50% being replaced) | $800 |
| May 31, 2001 | Expired or cancelled expired May 2002 | 2510 Van Ness Av | to conduct structural upgrading work on ground floor per plans on a voluntary basis.Details
to conduct structural upgrading work on ground floor per plans on a voluntary basis. | $50,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Oscar E Maldonado (4), Canche Construction Inc (2), Chung Kee Construction Co.