Back to kitchen remodel contractors
Olive Remodeling
- Based in
- Emeryville
- On San Francisco permits
- Aug 2017 to Jul 2026
- Last 24 months
- 8 permits filed
39 permits since 2000: 29 completed, 3 in progress, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 4 are 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
6 kitchen remodel permits: 4 completed, 2 never finaled. Typically 8 days from filing to permit and 209 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 18, 2025 | Completed final sign-off Sep 2026 | 82 Woodward St | 2/f: kitchen and bath remodel. 3/f: kitchen and bath remodel, switch bed and dining room location. interior only, no exterior work.Details
2/f: kitchen and bath remodel. 3/f: kitchen and bath remodel, switch bed and dining room location. interior only, no exterior work. | $150,000 |
| Aug 10, 2022 | Never finaled issued Aug 2022, no final | 2151 Mason St | remove & replace cabinets. install (n) appliances. kitchen remodel in kind.Details
remove & replace cabinets. install (n) appliances. kitchen remodel in kind. | $30,000 |
| Mar 17, 2022 | Never finaled issued Mar 2022, no final | 150 Liberty St | conversion of (e) storage into common space(conditioned). renovation of 2nd floor kitchen & bath. renovation of 3rd floor kitchen & bath.Details
conversion of (e) storage into common space(conditioned). renovation of 2nd floor kitchen & bath. renovation of 3rd floor kitchen & bath. | $120,000 |
| Oct 26, 2021 | Completed final sign-off Apr 2022 | 3349 23rd St | revision to pa# 2021-0702-3710, relocate ada counter at kitchen bar, replace water heater, change new pizza oven type from electric to gas unit, relocate sinks in kitchen, install ice maker. no exterior work.Details
revision to pa# 2021-0702-3710, relocate ada counter at kitchen bar, replace water heater, change new pizza oven type from electric to gas unit, relocate sinks in kitchen, install ice maker. no exterior work. | |
| Jul 2, 2021 | Completed final sign-off Apr 2022 | 3349 23rd St | remodel bathroom for accessibility comliance. remodel kitchen area, reconfigure lighting, interior flushes. no changes to exterior, no work in basement, abe program under sep. permit.Details
remodel bathroom for accessibility comliance. remodel kitchen area, reconfigure lighting, interior flushes. no changes to exterior, no work in basement, abe program under sep. permit. | $75,000 |
| Apr 21, 2021 | Completed final sign-off May 2021 | 30 Montcalm St | new kitchen countertops, new electrical wiring & sub panel, framing suports on stairs, replacing rotted wood @ stairs less then 50%Details
new kitchen countertops, new electrical wiring & sub panel, framing suports on stairs, replacing rotted wood @ stairs less then 50% | $25,000 |