Back to bathroom remodel contractors
Olive Remodeling
- Based in
- Emeryville
- On San Francisco permits
- Aug 2017 to Jul 2026
- Last 24 months
- 8 permits filed
39 permits since 2000: 29 completed, 3 in progress, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 4 are 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 never finaled. Typically 13 days from filing to permit and 162 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 18, 2025 | Completed final sign-off Sep 2026 | 82 Woodward St | 2/f: kitchen and bath remodel. 3/f: kitchen and bath remodel, switch bed and dining room location. interior only, no exterior work.Details
2/f: kitchen and bath remodel. 3/f: kitchen and bath remodel, switch bed and dining room location. interior only, no exterior work. | $150,000 |
| Mar 17, 2022 | Never finaled issued Mar 2022, no final | 150 Liberty St | conversion of (e) storage into common space(conditioned). renovation of 2nd floor kitchen & bath. renovation of 3rd floor kitchen & bath.Details
conversion of (e) storage into common space(conditioned). renovation of 2nd floor kitchen & bath. renovation of 3rd floor kitchen & bath. | $120,000 |
| Jul 27, 2021 | Completed final sign-off Oct 2021 | 534 06th Av | add a sink i toilet room, toilet in bath, install gfi in bath, reframe bath. midicine cabinet for new toilet locationDetails
add a sink i toilet room, toilet in bath, install gfi in bath, reframe bath. midicine cabinet for new toilet location | $10,000 |
| Jul 27, 2021 | Completed final sign-off Oct 2021 | 372 Shotwell St | upgrade 2 e baths with new finishes, casework, plumbing, elec,mech. comply w/ complaint 202046051-maintain ratio separation between dwelling units. lighting he and control cec 150.0 (k) terminale 3' from .l. and openings into the bldg.Details
upgrade 2 e baths with new finishes, casework, plumbing, elec,mech. comply w/ complaint 202046051-maintain ratio separation between dwelling units. lighting he and control cec 150.0 (k) terminale 3' from .l. and openings into the bldg. | $25,000 |
| Jul 2, 2021 | Completed final sign-off Apr 2022 | 3349 23rd St | remodel bathroom for accessibility comliance. remodel kitchen area, reconfigure lighting, interior flushes. no changes to exterior, no work in basement, abe program under sep. permit.Details
remodel bathroom for accessibility comliance. remodel kitchen area, reconfigure lighting, interior flushes. no changes to exterior, no work in basement, abe program under sep. permit. | $75,000 |