Olive Remodeling
- Based in
- Emeryville
- On San Francisco permits
- Aug 2017 to Jul 2026
- Last 24 months
- 8 permits filed
39 permits since 2000: 29 completed, 3 in progress, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 4 are 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
1 roof deck permit: 1 in progress. Typically 91 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 2, 2026 | In progress issued May 2026 | 150 Liberty St | vertical addition of 4th story and stair to upper unit, 152 liberty, addition of (n) roof deck at 4th floor, sprinkler entire building with nfpa 13r system on seperate permit, full seismic upgrade.Details
vertical addition of 4th story and stair to upper unit, 152 liberty, addition of (n) roof deck at 4th floor, sprinkler entire building with nfpa 13r system on seperate permit, full seismic upgrade. | $175,000 |