Olive Construction Corp
- Based in
- San Francisco
- On San Francisco permits
- Aug 2010 to Jul 2026
- Last 24 months
- 15 permits filed
141 permits since 2000: 103 completed, 8 in progress, 21 never finaled, 9 expired or cancelled.
Of the 21 never-finaled permits, 4 are 3 to 5 years old, 6 are 5 to 10 years old, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
9 stairs permits: 7 completed, 2 never finaled. Typically 8 days from filing to permit and 204 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 11, 2023 | Completed final sign-off Mar 2024 | 131 Caselli Av | replace (e) rutted hood/tile/stucco stair @ front entry in like kind. replace misc rotted framing @ bldg wall adjacent to stair. replace (e) landing finish above garage w/ new landing finish in like kind. all work within property line not public rowDetails
replace (e) rutted hood/tile/stucco stair @ front entry in like kind. replace misc rotted framing @ bldg wall adjacent to stair. replace (e) landing finish above garage w/ new landing finish in like kind. all work within property line not public row | $18,000 |
| Sep 17, 2021 | Never finaled issued Oct 2022, no final | 1940 Broadway | exterior improvements to incl new perimeter fencing/gates, install new motorized gate, install new pre-fab metal stairs at extg lightwell, install new motorized gate at extg garage entry. replace in-kind extg handrails at extg entry stairs, new handrails at on-grade steps.Details
exterior improvements to incl new perimeter fencing/gates, install new motorized gate, install new pre-fab metal stairs at extg lightwell, install new motorized gate at extg garage entry. replace in-kind extg handrails at extg entry stairs, new handrails at on-grade steps. | $68,000 |
| Jan 17, 2020 | Completed final sign-off Jul 2020 | 1940 Broadway | interior non structural remodel of sub basement lobby. relocate entry door between e sub basement lobby and garage. eliminate door at e stair landing at basement level. associated elec and int finishesDetails
interior non structural remodel of sub basement lobby. relocate entry door between e sub basement lobby and garage. eliminate door at e stair landing at basement level. associated elec and int finishes | $42,500 |
| Nov 2, 2018 | Completed final sign-off Mar 2019 | 375 07th Av | front window replacement. 12 window replacement from aluminum to clad wood marvin same size. front dy rot siding repair and paint. rear stairs dry rot, repair, porch repair. windows to be double hung.Details
front window replacement. 12 window replacement from aluminum to clad wood marvin same size. front dy rot siding repair and paint. rear stairs dry rot, repair, porch repair. windows to be double hung. | $45,000 |
| May 21, 2014 | Never finaled issued Jun 2014, no final | 3329 Clay St | repair (e) deck & exterior stair (less than 50% ) replace window glazing at 1st floor not visible from the street.n/a maherDetails
repair (e) deck & exterior stair (less than 50% ) replace window glazing at 1st floor not visible from the street.n/a maher | $3,000 |
| Oct 31, 2013 | Completed final sign-off Aug 2014 | 785 Oak St | remodel extg 1st floor bathroom and bedrooms, expand garage toward interior,create new laundry room and sitting area and relocate stair connecting to 2nd floor. 2nd floor: infill 2 doors at extg bath, infill old stair opening. remodel closet at extg bedroom. electrical and plmg at 1st floor.Details
remodel extg 1st floor bathroom and bedrooms, expand garage toward interior,create new laundry room and sitting area and relocate stair connecting to 2nd floor. 2nd floor: infill 2 doors at extg bath, infill old stair opening. remodel closet at extg bedroom. electrical and plmg at 1st floor. | $150,000 |
| Jun 28, 2013 | Completed final sign-off Dec 2013 | 217 02nd St | revision to permit 201305025995. revise stair footing detail per 4/s-2.Details
revision to permit 201305025995. revise stair footing detail per 4/s-2. | $300 |
| May 2, 2013 | Completed final sign-off Dec 2013 | 217 02nd St | remove non-struc partitoin @ 2nd flr atrium & install guardrail,add 2-hr fire sep 2nd fl ceiling,const 3 flr convenience stair in atrium. on 2nd flr demolish & const new meeting room, install add'l cabinets in kitchenette (break),add (n) lighitng. ada compliance under #20010692734 & 200807307973Details
remove non-struc partitoin @ 2nd flr atrium & install guardrail,add 2-hr fire sep 2nd fl ceiling,const 3 flr convenience stair in atrium. on 2nd flr demolish & const new meeting room, install add'l cabinets in kitchenette (break),add (n) lighitng. ada compliance under #20010692734 & 200807307973 | $90,000 |
| Nov 21, 2012 | Completed final sign-off Sep 2013 | 3036 Gough St | ist flr: add bedroom, bath & closets, remodel & expand garage, replace water heaters,relocate furnaces. 2nd flr: remodel bath & bedrms & add (n) stair to 1st flr. remove fireplace. 3rd flr: remodel bedrms & add (n) bath. remodel (e) den & closets, add 2 skylights & one window, (n) conc steps @ rearDetails
ist flr: add bedroom, bath & closets, remodel & expand garage, replace water heaters,relocate furnaces. 2nd flr: remodel bath & bedrms & add (n) stair to 1st flr. remove fireplace. 3rd flr: remodel bedrms & add (n) bath. remodel (e) den & closets, add 2 skylights & one window, (n) conc steps @ rear | $140,500 |