Back to kitchen remodel contractors
Olive Construction Corp
- Based in
- San Francisco
- On San Francisco permits
- Aug 2010 to Jul 2026
- Last 24 months
- 15 permits filed
141 permits since 2000: 103 completed, 8 in progress, 21 never finaled, 9 expired or cancelled.
Of the 21 never-finaled permits, 4 are 3 to 5 years old, 6 are 5 to 10 years old, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
25 kitchen remodel permits: 21 completed, 2 in progress, 2 never finaled. Typically 2 days from filing to permit and 146 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 2, 2026 | In progress issued Jun 2026 | 501 Beale St | unit#14h: kitchen cabinets and countertops replacement in kind, two bathrooms tile replacement, no architectural change.Details
unit#14h: kitchen cabinets and countertops replacement in kind, two bathrooms tile replacement, no architectural change. | $90,000 |
| Mar 5, 2026 | Completed final sign-off Sep 2026 | 117 Collingwood St | interior non structural work: remove and relocate property line window along north wall at bath. remodel kitchen. remodel 2 bathrooms. new interior finishes to replace existing.Details
interior non structural work: remove and relocate property line window along north wall at bath. remodel kitchen. remodel 2 bathrooms. new interior finishes to replace existing. | $98,000 |
| Nov 12, 2024 | In progress issued Dec 2024 | 60 Mountain Spring Av | interior: remove section of wall btwn kitchen & dining room; remodel kithcen w/ new cabinets, counters, appliances & finishes. exterior: non street facing window & door replacement and reconfiguration sky light at front porchDetails
interior: remove section of wall btwn kitchen & dining room; remodel kithcen w/ new cabinets, counters, appliances & finishes. exterior: non street facing window & door replacement and reconfiguration sky light at front porch | $138,850 |
| Feb 8, 2024 | Completed final sign-off May 2024 | 2925 Pine St | kitchen remodel layout staying the same. new kitchen cabinets and coutnertop. 15x8Details
kitchen remodel layout staying the same. new kitchen cabinets and coutnertop. 15x8 | $25,000 |
| Feb 22, 2023 | Completed final sign-off Apr 2024 | 941 Vallejo St | kitchen (10'x5'), bathroom (6'x7') remodeling new electric panel, no walls demo or relocation same layout new kitchen cabinets new shower pan and tileDetails
kitchen (10'x5'), bathroom (6'x7') remodeling new electric panel, no walls demo or relocation same layout new kitchen cabinets new shower pan and tile | $56,000 |
| Mar 8, 2022 | Completed final sign-off Jan 2023 | 1222 Naples St | kitchen remodel; add half bath;add rear yard deck within set back less than 10' above grade. no change to building area.Details
kitchen remodel; add half bath;add rear yard deck within set back less than 10' above grade. no change to building area. | $150,000 |
| Apr 20, 2021 | Never finaled issued Apr 2021, no final | 1940 Broadway | unit 1w: a. remodel (e) kitchen replace (e)cabinets with new unit iw b. replace (e) appliances with new fr kitchen c. replace (e) vanty and toilet with new for second bath. d. no architetural changes and associated electrical and plumbing. no change to lyout of walls and openings.Details
unit 1w: a. remodel (e) kitchen replace (e)cabinets with new unit iw b. replace (e) appliances with new fr kitchen c. replace (e) vanty and toilet with new for second bath. d. no architetural changes and associated electrical and plumbing. no change to lyout of walls and openings. | $20,000 |
| Apr 7, 2021 | Completed final sign-off Feb 2022 | 1940 Broadway | a)enlarge door from kitchen to dining room(at non-bearing interior wall) from 3 ft wide to become 6 feet wide. b)nw kitchen cabinetry to replace extg kitchn cabintry. c) nw vanity & water closet at bathroom. d) nw water closet at main bathrm. e) associated plmg, lighting & elec work in affected areaDetails
a)enlarge door from kitchen to dining room(at non-bearing interior wall) from 3 ft wide to become 6 feet wide. b)nw kitchen cabinetry to replace extg kitchn cabintry. c) nw vanity & water closet at bathroom. d) nw water closet at main bathrm. e) associated plmg, lighting & elec work in affected area | $20,000 |
| Jan 24, 2020 | Completed final sign-off Mar 2020 | 1545 Clement St | revision to pa #201512094574 to include reconfig.of non-structural interor partitions at residential units: unit 1: relocate washer/dryer closet, new closets at family rm. unit 2: relocate washer/dryer closet, revise kitchen layout. unit 3: revised bathroom layout, relocate kitchen, new coat closet.Details
revision to pa #201512094574 to include reconfig.of non-structural interor partitions at residential units: unit 1: relocate washer/dryer closet, new closets at family rm. unit 2: relocate washer/dryer closet, revise kitchen layout. unit 3: revised bathroom layout, relocate kitchen, new coat closet. | |
| Jul 19, 2019 | Completed final sign-off Jan 2020 | 2920 Hawes St | repair water damage to bld facade. ionstall new cement plaster facade and new wood clad windows, and int renovation of (e) kitchen dining rm areaDetails
repair water damage to bld facade. ionstall new cement plaster facade and new wood clad windows, and int renovation of (e) kitchen dining rm area | $48,000 |
| Jan 20, 2017 | Completed final sign-off Mar 2017 | 3731 Folsom St | comply w/ nov 201494281 - remodel kitchen & bathDetails
comply w/ nov 201494281 - remodel kitchen & bath | $22,100 |
| May 13, 2015 | Completed final sign-off Nov 2015 | 442 18th Av | remodel kitchen, remodel laundry room, infill +/- 200 s.f. under (e) bldg. @ 1/f, replace windows @ rear elevation.Details
remodel kitchen, remodel laundry room, infill +/- 200 s.f. under (e) bldg. @ 1/f, replace windows @ rear elevation. | $86,800 |
| Jan 14, 2015 | Never finaled issued Jan 2015, no final | 3448 Divisadero St | unit 3448: complete 2-bathroom remodel, kitchen cabinets and appliance installation, (electric work done previously), new water heater and furnace. unit 3950: kitchen cabinets replace, new water heater & furnace. both units replace aluminum windows to wood/fiberglass.Details
unit 3448: complete 2-bathroom remodel, kitchen cabinets and appliance installation, (electric work done previously), new water heater and furnace. unit 3950: kitchen cabinets replace, new water heater & furnace. both units replace aluminum windows to wood/fiberglass. | $81,000 |
| Jan 14, 2015 | Completed final sign-off Apr 2015 | 40 28th St | complete kitchen & bathroom remodel, new kitchen cabinets, appliance, electric & plumbing upgrade. bathroom: bath tub, shower replace, vanity, lights, heating floor.Details
complete kitchen & bathroom remodel, new kitchen cabinets, appliance, electric & plumbing upgrade. bathroom: bath tub, shower replace, vanity, lights, heating floor. | $32,000 |
| Sep 26, 2014 | Completed final sign-off Feb 2016 | 525 Bright St | new deck spanning width of rear facade with 1 hour rated walls at each end. install new sliding glass door at kitchenDetails
new deck spanning width of rear facade with 1 hour rated walls at each end. install new sliding glass door at kitchen | $20,000 |
| Sep 10, 2014 | Completed final sign-off Nov 2014 | 525 Bright St | kitchen remodel - new cabinet, plumbing, lights; to comply with cec150.0(k)3Details
kitchen remodel - new cabinet, plumbing, lights; to comply with cec150.0(k)3 | $26,000 |
| Aug 12, 2014 | Completed final sign-off Aug 2017 | 432 Moraga St | (e)2-story residence to become 3 story residence: horizontal&vertical addition: basement, provide(n)storage rm. 1/fl:bedroom, storage, bathroom, garage. 2/fl:liv room, family room, kitchen, powder room, deck. 3/fl:3 bedrooms, 3 baths, deck.Details
(e)2-story residence to become 3 story residence: horizontal&vertical addition: basement, provide(n)storage rm. 1/fl:bedroom, storage, bathroom, garage. 2/fl:liv room, family room, kitchen, powder room, deck. 3/fl:3 bedrooms, 3 baths, deck. | $340,000 |
| Jul 2, 2014 | Completed final sign-off May 2017 | 1340 Mcallister St | comply with physical inspection report #cc7478 remove sink and shower @ basement level (1st floor) remove bathroom and kitchen @ top level (4th floor)Details
comply with physical inspection report #cc7478 remove sink and shower @ basement level (1st floor) remove bathroom and kitchen @ top level (4th floor) | $30,000 |
| Apr 4, 2014 | Completed final sign-off Jul 2014 | 785 Oak St | upgrade two bathroom, kitchen electric and plumbing, gas water heater and furnace re-locationDetails
upgrade two bathroom, kitchen electric and plumbing, gas water heater and furnace re-location | $65,000 |
| Jan 21, 2014 | Completed final sign-off May 2014 | 239 Caselli Av | kitchen cabinets replace. new counter tops installation. bathroom - bath tub replace. bathroom shower pan replace tile.Details
kitchen cabinets replace. new counter tops installation. bathroom - bath tub replace. bathroom shower pan replace tile. | $32,000 |
| May 10, 2013 | Completed final sign-off Jun 2014 | 2724 Filbert St | #2726 kitchen remodel, 50% kitchen lighting to be high efficacy, #2728 bathroom remodel, kitchen repair after water damage, no alteration of partition wall. bathroom light need to be control by occupancy sensor, new fan connect to existing ductDetails
#2726 kitchen remodel, 50% kitchen lighting to be high efficacy, #2728 bathroom remodel, kitchen repair after water damage, no alteration of partition wall. bathroom light need to be control by occupancy sensor, new fan connect to existing duct | $60,000 |
| May 2, 2013 | Completed final sign-off Dec 2013 | 217 02nd St | remove non-struc partitoin @ 2nd flr atrium & install guardrail,add 2-hr fire sep 2nd fl ceiling,const 3 flr convenience stair in atrium. on 2nd flr demolish & const new meeting room, install add'l cabinets in kitchenette (break),add (n) lighitng. ada compliance under #20010692734 & 200807307973Details
remove non-struc partitoin @ 2nd flr atrium & install guardrail,add 2-hr fire sep 2nd fl ceiling,const 3 flr convenience stair in atrium. on 2nd flr demolish & const new meeting room, install add'l cabinets in kitchenette (break),add (n) lighitng. ada compliance under #20010692734 & 200807307973 | $90,000 |
| Dec 18, 2012 | Completed final sign-off Apr 2013 | 1301 Clay St | #6: remodel two bathrooms, demolish and rebuild new kitchen in (e) dining room; demo load bearing wall b/w living and dining. enlarge closet in bedroom, demo closet in bedroom, work shall include all related electrical, plumbing, strucrual and finish work as req for complete installation.Details
#6: remodel two bathrooms, demolish and rebuild new kitchen in (e) dining room; demo load bearing wall b/w living and dining. enlarge closet in bedroom, demo closet in bedroom, work shall include all related electrical, plumbing, strucrual and finish work as req for complete installation. | $40,000 |
| Apr 5, 2012 | Completed final sign-off May 2012 | 925 Corbett Av | unit # 101: revision to pa # 201203216553. kitchen non-bearing wall removal. nine (9) windows replace same opening. two windows facing the street. u-factor = 0.40 maxDetails
unit # 101: revision to pa # 201203216553. kitchen non-bearing wall removal. nine (9) windows replace same opening. two windows facing the street. u-factor = 0.40 max | $8,000 |
| Mar 21, 2012 | Completed final sign-off May 2012 | 925 Corbett Av | kitchen remodel, new cabinets & appliance, new electric panel, new lights, bathroom tile & plumbing fixts, new shower membrane. work is in unit #101Details
kitchen remodel, new cabinets & appliance, new electric panel, new lights, bathroom tile & plumbing fixts, new shower membrane. work is in unit #101 | $42,000 |