Olexo Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Apr 2006 to Jul 2026
- Last 24 months
- 3 permits filed
37 permits since 2000: 32 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
1 roof deck permit: 1 completed. Typically 0 days from filing to permit and 30 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 10, 2013 | Completed final sign-off Aug 2013 | 2866 22nd St | 1. repair water damaged (e) sidings & termite repair; 2. repair (e) rear stair landing & add 3rd stringer; repair water damaged balusters & bottom rail; 3. repair or replace (e) joists in common area damaged by water. 4. replace (e) roof membrane. 5. replace (e) balusters at stair(roof deck)Details
1. repair water damaged (e) sidings & termite repair; 2. repair (e) rear stair landing & add 3rd stringer; repair water damaged balusters & bottom rail; 3. repair or replace (e) joists in common area damaged by water. 4. replace (e) roof membrane. 5. replace (e) balusters at stair(roof deck) | $10,500 |