Olexo Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Apr 2006 to Jul 2026
- Last 24 months
- 3 permits filed
37 permits since 2000: 32 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 42 days from filing to permit and 117 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 27, 2022 | Completed final sign-off Oct 2022 | 813 Carolina St | permit for deck in non-complying cottage roof area split into no-deck and deck areas, deck to receive deck tile no other construction, both (e) deck & no-deck areas already have (e) legal guadrails, no-deck, south 9'x 25'-0" deck 7'x 23'-7"Details
permit for deck in non-complying cottage roof area split into no-deck and deck areas, deck to receive deck tile no other construction, both (e) deck & no-deck areas already have (e) legal guadrails, no-deck, south 9'x 25'-0" deck 7'x 23'-7" | $1,000 |
| Apr 7, 2006 | Completed final sign-off Oct 2006 | 2852 22nd St | for public safety replace existing stair and decks with new (different config) stair to roof w. (3) landings. no deck on roof. decks @ 2nd and 3rd floor. new foundations for deck and landing.Details
for public safety replace existing stair and decks with new (different config) stair to roof w. (3) landings. no deck on roof. decks @ 2nd and 3rd floor. new foundations for deck and landing. | $8,000 |