Back to kitchen remodel contractors
Olexo Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Apr 2006 to Jul 2026
- Last 24 months
- 3 permits filed
37 permits since 2000: 32 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 8 completed. Typically 0 days from filing to permit and 124 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 10, 2023 | Completed final sign-off Nov 2023 | 2852 22nd St | (3) kitchen remodels minor in kind. remove and replace gas appliances with (n). electric induction cooktops. (n) fixtures and finishes.Details
(3) kitchen remodels minor in kind. remove and replace gas appliances with (n). electric induction cooktops. (n) fixtures and finishes. | $60,000 |
| Dec 21, 2022 | Completed final sign-off Apr 2023 | 150 Andover St | revision to pa#202211086083. minor structural alterations for kitchen and bath remodeling, including: combine a door and adjacent pass through into one wider opening, and widening the opening to the kitchen.Details
revision to pa#202211086083. minor structural alterations for kitchen and bath remodeling, including: combine a door and adjacent pass through into one wider opening, and widening the opening to the kitchen. | $8,500 |
| Nov 8, 2022 | Completed final sign-off Apr 2023 | 150 Andover St | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 2 bathroom(s) in 2nd fl, 3rd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 2 bathroom(s) in 2nd fl, 3rd fl with 0 shower pan(s). | $35,000 |
| Mar 28, 2022 | Completed final sign-off Aug 2022 | 648 Precita Av | to comply with nov 202286036, 202286960, and complaint 202286940. legalize work. apply for encroachment permit for (n) curb cut. replace (e) ext. metal gate. replace (e) single pane windows entire bldg w/ new in kind dual pane windows. relocate (e) kitchen sink, replace (e) water heater with new.Details
to comply with nov 202286036, 202286960, and complaint 202286940. legalize work. apply for encroachment permit for (n) curb cut. replace (e) ext. metal gate. replace (e) single pane windows entire bldg w/ new in kind dual pane windows. relocate (e) kitchen sink, replace (e) water heater with new. | $20,000 |
| Aug 27, 2019 | Completed final sign-off Sep 2021 | 1683 Hayes St | replace existing in kind kitchen, full bath located on the third floorDetails
replace existing in kind kitchen, full bath located on the third floor | $36,000 |
| Nov 15, 2016 | Completed final sign-off Feb 2017 | 2601 19th St | revision to permit #2016-10-14-0281. replace 2nd existing window @ kitchen @ lightwell with new.Details
revision to permit #2016-10-14-0281. replace 2nd existing window @ kitchen @ lightwell with new. | $1,650 |
| Oct 14, 2016 | Completed final sign-off Feb 2017 | 2601 19th St | replace (e)kitchen w/new. repl (1)(e)single pane window. remove (e)unreinforced masonry chimney. all 3 flrs. replace non-compliant (e)chimney as flue w/ all new flue for kitchen hoods & water heater(window not facing the street)Details
replace (e)kitchen w/new. repl (1)(e)single pane window. remove (e)unreinforced masonry chimney. all 3 flrs. replace non-compliant (e)chimney as flue w/ all new flue for kitchen hoods & water heater(window not facing the street) | $65,000 |
| Apr 24, 2015 | Completed final sign-off Aug 2017 | 1221 York St | renovation of (e) house + addition to rear of 3 story w/new kitchen + bathrooms.Details
renovation of (e) house + addition to rear of 3 story w/new kitchen + bathrooms. | $363,600 |