Back to bathroom remodel contractors
Olexo Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Apr 2006 to Jul 2026
- Last 24 months
- 3 permits filed
37 permits since 2000: 32 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 10 completed. Typically 0 days from filing to permit and 146 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 30, 2026 | Completed final sign-off Sep 2026 | 2852 22nd St | revision to 2024.0124.4530 - to address correction notice/ clarify as-builts remodel existing bath on lower level. add new laundry sink + cabinet. ref 2026.0722.5366Details
revision to 2024.0124.4530 - to address correction notice/ clarify as-builts remodel existing bath on lower level. add new laundry sink + cabinet. ref 2026.0722.5366 | |
| Dec 21, 2022 | Completed final sign-off Apr 2023 | 150 Andover St | revision to pa#202211086083. minor structural alterations for kitchen and bath remodeling, including: combine a door and adjacent pass through into one wider opening, and widening the opening to the kitchen.Details
revision to pa#202211086083. minor structural alterations for kitchen and bath remodeling, including: combine a door and adjacent pass through into one wider opening, and widening the opening to the kitchen. | $8,500 |
| Nov 8, 2022 | Completed final sign-off Apr 2023 | 150 Andover St | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 2 bathroom(s) in 2nd fl, 3rd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 2 bathroom(s) in 2nd fl, 3rd fl with 0 shower pan(s). | $35,000 |
| Nov 12, 2019 | Completed final sign-off Jan 2020 | 1683 Hayes St | revision to pa 201908209277 per filed inspectors request. plans to reflect new bathroom at 4th flr - atticDetails
revision to pa 201908209277 per filed inspectors request. plans to reflect new bathroom at 4th flr - attic | $12,500 |
| Sep 13, 2019 | Completed final sign-off Sep 2021 | 1683 Hayes St | install closet cabintry and bathroomwith toilet, shower,sinks and cabinetry. flor and shower walls to be tile.move 1/2 bathroom door from one side to the other.nonbearing sheetrock and framing to fill in and close off 1/2 bathroom.Details
install closet cabintry and bathroomwith toilet, shower,sinks and cabinetry. flor and shower walls to be tile.move 1/2 bathroom door from one side to the other.nonbearing sheetrock and framing to fill in and close off 1/2 bathroom. | $17,000 |
| Aug 27, 2019 | Completed final sign-off Sep 2021 | 1683 Hayes St | replace existing in kind kitchen, full bath located on the third floorDetails
replace existing in kind kitchen, full bath located on the third floor | $36,000 |
| Aug 20, 2019 | Completed final sign-off Jan 2020 | 1683 Hayes St | remodel bathroom new toilet, sink, and shower to be replace no change to walls.Details
remodel bathroom new toilet, sink, and shower to be replace no change to walls. | $12,500 |
| Dec 11, 2015 | Completed final sign-off Mar 2016 | 2662 22nd St | apt a: existing bathroom at 1st floor(ground floor is below), remove existing tile, floor & walls, & replace with new. temporary removal of existing bath tub & toilet to do tile work. replace existing when tile work complete.Details
apt a: existing bathroom at 1st floor(ground floor is below), remove existing tile, floor & walls, & replace with new. temporary removal of existing bath tub & toilet to do tile work. replace existing when tile work complete. | $3,500 |
| Sep 1, 2015 | Completed final sign-off Mar 2016 | 2662 22nd St | replace 2 (e) windows with new. remodel local repair of bath fixtures replacement with new, framing and sheetrock replacement, stair repair, replace garage door.Details
replace 2 (e) windows with new. remodel local repair of bath fixtures replacement with new, framing and sheetrock replacement, stair repair, replace garage door. | $20,000 |
| Apr 24, 2015 | Completed final sign-off Aug 2017 | 1221 York St | renovation of (e) house + addition to rear of 3 story w/new kitchen + bathrooms.Details
renovation of (e) house + addition to rear of 3 story w/new kitchen + bathrooms. | $363,600 |