O'kane Construction Llc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2001 to Aug 2026
- Last 24 months
- 5 permits filed
79 permits since 2000: 64 completed, 6 in progress, 7 never finaled, 2 expired or cancelled.
Of the 7 never-finaled permits, 4 are 3 to 5 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
8 stairs permits: 5 completed, 2 never finaled, 1 expired or cancelled. Typically 3 days from filing to permit and 43 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 26, 2019 | Completed final sign-off Jun 2020 | 1522 24th Av | fill-in addition. new bedroom, bathroom & sitting room at 1st fl. replace existing interior stair.Details
fill-in addition. new bedroom, bathroom & sitting room at 1st fl. replace existing interior stair. | $89,482 |
| Aug 29, 2016 | Completed final sign-off Sep 2016 | 160 Randall St | repair rear landings & exterior stairs & siding, less than 50% of rear stairs to be repaird. repairs to be in kind.Details
repair rear landings & exterior stairs & siding, less than 50% of rear stairs to be repaird. repairs to be in kind. | $3,500 |
| Jun 15, 2012 | Expired or cancelled expired Nov 2023 | 151 Powell St | replace (e) rear) stairs to basement from winder to conventional stairs.Details
replace (e) rear) stairs to basement from winder to conventional stairs. | $2,000 |
| Aug 22, 2011 | Never finaled issued Dec 2011, no final | 151 Powell St | revise ground floor demising walls. revise ground floor stair enclosure & exit passage way.Details
revise ground floor demising walls. revise ground floor stair enclosure & exit passage way. | $170,000 |
| Jan 15, 2010 | Completed final sign-off Apr 2010 | 1649 Page St | rear staircase construction off existing rear deck.Details
rear staircase construction off existing rear deck. | $1,000 |
| Nov 19, 2009 | Never finaled issued Nov 2009, no final | 965 Alabama St | repair rear wood exterior stairs & landing. repair/replace damaged wood stringers, treads, guardrails. no more than 50% of stairs & landing to be repaired. not visible from streetDetails
repair rear wood exterior stairs & landing. repair/replace damaged wood stringers, treads, guardrails. no more than 50% of stairs & landing to be repaired. not visible from street | $2,800 |
| Nov 14, 2006 | Completed final sign-off Dec 2006 | 1021 Cortland Av | repair dry rot at front brick staircase, repair wood ramp under brick, hot mop ramp, replace brick in kindDetails
repair dry rot at front brick staircase, repair wood ramp under brick, hot mop ramp, replace brick in kind | $4,900 |
| Feb 25, 2003 | Completed final sign-off May 2003 | 161 Broderick St | repair dry rot at center exterior stairs and wood siding per comply #200232724Details
repair dry rot at center exterior stairs and wood siding per comply #200232724 | $2,500 |