O'kane Construction Llc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2001 to Aug 2026
- Last 24 months
- 5 permits filed
79 permits since 2000: 64 completed, 6 in progress, 7 never finaled, 2 expired or cancelled.
Of the 7 never-finaled permits, 4 are 3 to 5 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
6 deck permits: 6 completed. Typically 0 days from filing to permit and 50 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 28, 2024 | Completed final sign-off Jun 2024 | 2712 Judah St | repair in kind less than 50% of existing deck at rearDetails
repair in kind less than 50% of existing deck at rear | $20,000 |
| Jun 7, 2021 | Completed final sign-off Oct 2021 | 2770 Jackson St | address nov 202177201/202177355/202046441:repair dryrot at 2nd floor deck with in-kind material, repair exterior trim at windows, test & remove all hazadous paint, repait gutters & downspouts collect water into storm water.Details
address nov 202177201/202177355/202046441:repair dryrot at 2nd floor deck with in-kind material, repair exterior trim at windows, test & remove all hazadous paint, repait gutters & downspouts collect water into storm water. | $30,000 |
| Feb 25, 2016 | Completed final sign-off Apr 2016 | 101 Chenery St | repair/replace dryrotted wood members at rear deck, in ding, less than 50%Details
repair/replace dryrotted wood members at rear deck, in ding, less than 50% | $8,000 |
| Jul 9, 2014 | Completed final sign-off Aug 2014 | 496 Pacheco St | repair framing at north rear deck on 9th avenue side of house, less than 50% of deck to be repaired, at east side of house remove stucco & repair repair dry rotted framing then restucco, area measures approx. 250 sq ft of repairDetails
repair framing at north rear deck on 9th avenue side of house, less than 50% of deck to be repaired, at east side of house remove stucco & repair repair dry rotted framing then restucco, area measures approx. 250 sq ft of repair | $8,000 |
| Apr 30, 2014 | Completed final sign-off Aug 2014 | 496 Pacheco St | replace kitchen cabinetry w/new. some demo, no structural work in kitchen. no chnge of wall, window and door. at side deck replace/repair dry rotted wood members. less than 50% of deck.Details
replace kitchen cabinetry w/new. some demo, no structural work in kitchen. no chnge of wall, window and door. at side deck replace/repair dry rotted wood members. less than 50% of deck. | $25,000 |
| Jan 15, 2010 | Completed final sign-off Apr 2010 | 1649 Page St | rear staircase construction off existing rear deck.Details
rear staircase construction off existing rear deck. | $1,000 |