Back to bathroom remodel contractors
O'kane Construction Llc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2001 to Aug 2026
- Last 24 months
- 5 permits filed
79 permits since 2000: 64 completed, 6 in progress, 7 never finaled, 2 expired or cancelled.
Of the 7 never-finaled permits, 4 are 3 to 5 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
29 bathroom remodel permits: 25 completed, 3 in progress, 1 never finaled. Typically 0 days from filing to permit and 156 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 23, 2026 | In progress issued Apr 2026 | 1035 Haight St | structural work only to include sistering exterior brick wall with new concrete wall, new foundations for bearing wall and real wall, shear (e) rear wall, repair framing as req'd. kitchen and bathroom under permit 202406285493.Details
structural work only to include sistering exterior brick wall with new concrete wall, new foundations for bearing wall and real wall, shear (e) rear wall, repair framing as req'd. kitchen and bathroom under permit 202406285493. | $65,000 |
| May 7, 2025 | Completed final sign-off Dec 2025 | 2180 Folsom St | fire repair of existing front 2 stories and mezz and part of real manufacturing roof- ada and bathrooms. no finishes, fixtures or arch scope. framing repair only. arch details in forthcoming submittal. no change of use.Details
fire repair of existing front 2 stories and mezz and part of real manufacturing roof- ada and bathrooms. no finishes, fixtures or arch scope. framing repair only. arch details in forthcoming submittal. no change of use. | $80,000 |
| Sep 20, 2024 | In progress filed Sep 2024, not yet issued | 160 Ewing Tr | repair water damage at dining rm/kitchen sliding patio door, kitchen replacement in kind (not shown on drawings), relocate ground floor laundry and bathroom, replace in kind rear sliding door, replace in kind 4 windows in (e) jamb w/smaller windows.Details
repair water damage at dining rm/kitchen sliding patio door, kitchen replacement in kind (not shown on drawings), relocate ground floor laundry and bathroom, replace in kind rear sliding door, replace in kind 4 windows in (e) jamb w/smaller windows. | $105,000 |
| Jun 28, 2024 | Completed final sign-off Nov 2025 | 1029 Haight St | remodel 2-1/2 (e) bathrooms, in-kind. no structural changes.Details
remodel 2-1/2 (e) bathrooms, in-kind. no structural changes. | $75,000 |
| Jun 28, 2024 | In progress issued Jun 2024 | 1035 Haight St | remodel in-kind of 4x (1/2), 1 full bathroom with 2 showers and 1 kitchen. no strucutal changes to these (e) rooms.Details
remodel in-kind of 4x (1/2), 1 full bathroom with 2 showers and 1 kitchen. no strucutal changes to these (e) rooms. | $88,000 |
| Apr 9, 2024 | Completed final sign-off Nov 2025 | 1029 Haight St | remodel 1 bathroom in-kind. no structural work. replace 31 windows with marvin ultimate wood clad street facing. east facking replace with marvin ultimate wood clad. 15 north face windows to be wood with integral lug. all non-streect facing windows to be "marvin" elevate.Details
remodel 1 bathroom in-kind. no structural work. replace 31 windows with marvin ultimate wood clad street facing. east facking replace with marvin ultimate wood clad. 15 north face windows to be wood with integral lug. all non-streect facing windows to be "marvin" elevate. | $30,000 |
| Apr 9, 2024 | Completed final sign-off Nov 2025 | 1035 Haight St | remodel 3 bathrooms in-kind. no structural work. replace 74 windows - east facing to be replaced with marving ultimate wood clad. 18 street facing windows to be wood with intergral lug. all non-streect facing windows to be marvin "evevate"Details
remodel 3 bathrooms in-kind. no structural work. replace 74 windows - east facing to be replaced with marving ultimate wood clad. 18 street facing windows to be wood with intergral lug. all non-streect facing windows to be marvin "evevate" | $74,000 |
| Nov 15, 2022 | Completed final sign-off Dec 2022 | 511 John Muir Dr | demo of (e) bath house and slab repairDetails
demo of (e) bath house and slab repair | $40,000 |
| Oct 5, 2022 | Completed final sign-off Feb 2023 | 1666 33rd Av | remove existing kitchen and bathroom. replace in kind. no structural changesDetails
remove existing kitchen and bathroom. replace in kind. no structural changes | $55,000 |
| Aug 29, 2022 | Completed final sign-off Jul 2023 | 3983 18th St | replace in kind existing bathroom/ toilet- vanity -tub -and tile. no structural work is included, or demo of interior walls.Details
replace in kind existing bathroom/ toilet- vanity -tub -and tile. no structural work is included, or demo of interior walls. | $25,000 |
| Aug 12, 2022 | Completed final sign-off Apr 2023 | 1859 Vallejo St | unit 2:remodel 1 kitchen & 1 bath, (n) closet @ entry foyer. replace 2 (e) doors & 1 window in-kind. new light, plumbing, havc in area of work. (n) header in non load bearing wall. (window and doors are invisible from st) no structural workDetails
unit 2:remodel 1 kitchen & 1 bath, (n) closet @ entry foyer. replace 2 (e) doors & 1 window in-kind. new light, plumbing, havc in area of work. (n) header in non load bearing wall. (window and doors are invisible from st) no structural work | $70,000 |
| Dec 28, 2020 | Completed final sign-off Apr 2021 | 1388 Gough St | remodel 2 existing baths. remove existing tile and and fixtures and fittings. install new in kind. no demo of interior walls or strucutral supports is includedDetails
remodel 2 existing baths. remove existing tile and and fixtures and fittings. install new in kind. no demo of interior walls or strucutral supports is included | $40,000 |
| Oct 8, 2019 | Completed final sign-off Sep 2020 | 2430 26th Av | revision to 201907236580 add half bath & relocate rear bedroom closet on 1st flr. remove wall separahing living from kitchen/dining on 2nd flrDetails
revision to 201907236580 add half bath & relocate rear bedroom closet on 1st flr. remove wall separahing living from kitchen/dining on 2nd flr | |
| Jul 23, 2019 | Completed final sign-off Sep 2020 | 2430 26th Av | infill 2 side lightwells. add 2 bedrooms, 1 full bath, living/family & storage room at 1st flr. remodel kitchen, add 1 full bath at 2nd flrDetails
infill 2 side lightwells. add 2 bedrooms, 1 full bath, living/family & storage room at 1st flr. remodel kitchen, add 1 full bath at 2nd flr | $180,000 |
| Jun 26, 2019 | Completed final sign-off Jun 2020 | 1522 24th Av | fill-in addition. new bedroom, bathroom & sitting room at 1st fl. replace existing interior stair.Details
fill-in addition. new bedroom, bathroom & sitting room at 1st fl. replace existing interior stair. | $89,482 |
| Mar 29, 2018 | Completed final sign-off Oct 2018 | 838 31st Av | remove wall between kitchen and dining room. remodel kitchen and (e) bathroom .remove closet to accomodate full bath, incorporate powder room into full bathDetails
remove wall between kitchen and dining room. remodel kitchen and (e) bathroom .remove closet to accomodate full bath, incorporate powder room into full bath | $30,000 |
| Feb 25, 2016 | Completed final sign-off Jun 2024 | 68 Ventura Av | vert&horiz addition.expand 1377sq.ft.the ftprint&main level expand by 138 sq.ft. to a total of 1515 sq.ft.while new upper level will total 1152sq.ft.bring total habitable area to 2667sq.ft.the new upper level will have 2 bedrms&a common bath as well as a mstr bedrm suit,laundry,storage&circulation.Details
vert&horiz addition.expand 1377sq.ft.the ftprint&main level expand by 138 sq.ft. to a total of 1515 sq.ft.while new upper level will total 1152sq.ft.bring total habitable area to 2667sq.ft.the new upper level will have 2 bedrms&a common bath as well as a mstr bedrm suit,laundry,storage&circulation. | $395,000 |
| Feb 18, 2016 | Completed final sign-off Apr 2016 | 632 Mississippi St | remodel existing bathroom, install new tile, fixtures & fittings. no structural work included. no wall modification.Details
remodel existing bathroom, install new tile, fixtures & fittings. no structural work included. no wall modification. | $18,000 |
| Jan 28, 2016 | Completed final sign-off Dec 2016 | 415 Ellsworth St | revision to 2014 0520 6897 s: remodel bathroom. addition to 3rd fllor. add 3 skylights and modify roofDetails
revision to 2014 0520 6897 s: remodel bathroom. addition to 3rd fllor. add 3 skylights and modify roof | |
| Jan 22, 2016 | Completed final sign-off Apr 2016 | 962 Sanchez St | remodel 2 (e) bathroom. demo as neede and replace tile/fixtures in-kind. no structural work included. no walls moved, removed, added or infilled. all layouts to remain unchanged.Details
remodel 2 (e) bathroom. demo as neede and replace tile/fixtures in-kind. no structural work included. no walls moved, removed, added or infilled. all layouts to remain unchanged. | $25,000 |
| May 28, 2014 | Never finaled issued May 2015, no final | 415 Ellsworth St | horizontal addition remodel to portion of third floor; add bathroom & modify exterior walls & roof.Details
horizontal addition remodel to portion of third floor; add bathroom & modify exterior walls & roof. | $85,000 |
| Dec 4, 2012 | Completed final sign-off Apr 2014 | 95 Clarendon Av | remodel exisiting master bathroom install new tub walk in shower ,toilet double lav. remodel existing guest bathroom , new tub shower no structural to be performed.Details
remodel exisiting master bathroom install new tub walk in shower ,toilet double lav. remodel existing guest bathroom , new tub shower no structural to be performed. | $20,000 |
| Nov 23, 2009 | Completed final sign-off Jan 2010 | 965 Alabama St | replace in kind siding at south east side of building apprx. 550 sqft not visible frpm the street. remove/repair water damaged drywall, tile from south side of lower unit bathroom. replace in kind , remove/repair water damaged drywall from south wall of lower unit rear bedroomDetails
replace in kind siding at south east side of building apprx. 550 sqft not visible frpm the street. remove/repair water damaged drywall, tile from south side of lower unit bathroom. replace in kind , remove/repair water damaged drywall from south wall of lower unit rear bedroom | $6,000 |
| Feb 6, 2008 | Completed final sign-off Jul 2008 | 1908 16th Av | remodel existing (full bathroom) and half bathroom at main level of house. install new insulation, 1 drywall, tile,fixtures. no structural work.Details
remodel existing (full bathroom) and half bathroom at main level of house. install new insulation, 1 drywall, tile,fixtures. no structural work. | $30,000 |
| Aug 13, 2004 | Completed final sign-off Oct 2004 | 2920 Turk Bl | remodel (e) bathroom,remove drywall,tile,(e)tub to remain.install new drywall/tile.no structural worDetails
remodel (e) bathroom,remove drywall,tile,(e)tub to remain.install new drywall/tile.no structural wor | $7,000 |
| Nov 20, 2002 | Completed final sign-off Feb 2003 | 1908 16th Av | retile exist bath, top floor new plumbing/elec fixtures including double vanity/closet no structuralDetails
retile exist bath, top floor new plumbing/elec fixtures including double vanity/closet no structural | $20,000 |
| Aug 21, 2002 | Completed final sign-off Nov 2002 | 2622 19th Av | remodel bathroom. replace fixture & fittings & retile. no structural work.Details
remodel bathroom. replace fixture & fittings & retile. no structural work. | $9,000 |
| Mar 18, 2002 | Completed final sign-off Jul 2002 | 3857 22nd St | re-tile (e) upper bathroom, install new plumbing fixturesDetails
re-tile (e) upper bathroom, install new plumbing fixtures | $8,000 |
| Feb 20, 2001 | Completed final sign-off Apr 2001 | 750 Vicente St | remodel bath & 1/2. retile and install new fixtures & fittings non-structural work only.Details
remodel bath & 1/2. retile and install new fixtures & fittings non-structural work only. | $6,000 |