Back to kitchen remodel contractors
O'kane Construction Llc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2001 to Aug 2026
- Last 24 months
- 5 permits filed
79 permits since 2000: 64 completed, 6 in progress, 7 never finaled, 2 expired or cancelled.
Of the 7 never-finaled permits, 4 are 3 to 5 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
19 kitchen remodel permits: 14 completed, 5 in progress. Typically 0 days from filing to permit and 140 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 12, 2026 | In progress issued Aug 2026 | 372 Ritch St | interior only base building work for prospection tenants. partiitions- partial hieghts for enclosed block of restrooms. wet bar/kitchenette. electrical lighting and distribution. future tenant under separate ti permitDetails
interior only base building work for prospection tenants. partiitions- partial hieghts for enclosed block of restrooms. wet bar/kitchenette. electrical lighting and distribution. future tenant under separate ti permit | $180,000 |
| Jun 22, 2026 | In progress issued Jun 2026 | 1035 Haight St | revision to bpa#202406285493. remodel (e) kitchen with new plumbing fixtures and provide accessibility for doorways & travel path. accessible restroom remodel under seprate bpa# 202603238091. the kitchen is not open to the public, and the construction & operations are not publicly funded.Details
revision to bpa#202406285493. remodel (e) kitchen with new plumbing fixtures and provide accessibility for doorways & travel path. accessible restroom remodel under seprate bpa# 202603238091. the kitchen is not open to the public, and the construction & operations are not publicly funded. | $10,000 |
| Apr 13, 2026 | Completed final sign-off Sep 2026 | 2180 Folsom St | revision to pa# 202512182161: to remove the kitchenettes from cope of work at the first floor, mezzanine, and 2nd floors.Details
revision to pa# 202512182161: to remove the kitchenettes from cope of work at the first floor, mezzanine, and 2nd floors. | |
| Mar 23, 2026 | In progress issued Apr 2026 | 1035 Haight St | structural work only to include sistering exterior brick wall with new concrete wall, new foundations for bearing wall and real wall, shear (e) rear wall, repair framing as req'd. kitchen and bathroom under permit 202406285493.Details
structural work only to include sistering exterior brick wall with new concrete wall, new foundations for bearing wall and real wall, shear (e) rear wall, repair framing as req'd. kitchen and bathroom under permit 202406285493. | $65,000 |
| Sep 20, 2024 | In progress filed Sep 2024, not yet issued | 160 Ewing Tr | repair water damage at dining rm/kitchen sliding patio door, kitchen replacement in kind (not shown on drawings), relocate ground floor laundry and bathroom, replace in kind rear sliding door, replace in kind 4 windows in (e) jamb w/smaller windows.Details
repair water damage at dining rm/kitchen sliding patio door, kitchen replacement in kind (not shown on drawings), relocate ground floor laundry and bathroom, replace in kind rear sliding door, replace in kind 4 windows in (e) jamb w/smaller windows. | $105,000 |
| Jun 28, 2024 | In progress issued Jun 2024 | 1035 Haight St | remodel in-kind of 4x (1/2), 1 full bathroom with 2 showers and 1 kitchen. no strucutal changes to these (e) rooms.Details
remodel in-kind of 4x (1/2), 1 full bathroom with 2 showers and 1 kitchen. no strucutal changes to these (e) rooms. | $88,000 |
| Oct 5, 2022 | Completed final sign-off Feb 2023 | 1666 33rd Av | remove existing kitchen and bathroom. replace in kind. no structural changesDetails
remove existing kitchen and bathroom. replace in kind. no structural changes | $55,000 |
| Aug 12, 2022 | Completed final sign-off Apr 2023 | 1859 Vallejo St | unit 2:remodel 1 kitchen & 1 bath, (n) closet @ entry foyer. replace 2 (e) doors & 1 window in-kind. new light, plumbing, havc in area of work. (n) header in non load bearing wall. (window and doors are invisible from st) no structural workDetails
unit 2:remodel 1 kitchen & 1 bath, (n) closet @ entry foyer. replace 2 (e) doors & 1 window in-kind. new light, plumbing, havc in area of work. (n) header in non load bearing wall. (window and doors are invisible from st) no structural work | $70,000 |
| Oct 8, 2019 | Completed final sign-off Sep 2020 | 2430 26th Av | revision to 201907236580 add half bath & relocate rear bedroom closet on 1st flr. remove wall separahing living from kitchen/dining on 2nd flrDetails
revision to 201907236580 add half bath & relocate rear bedroom closet on 1st flr. remove wall separahing living from kitchen/dining on 2nd flr | |
| Jul 23, 2019 | Completed final sign-off Sep 2020 | 2430 26th Av | infill 2 side lightwells. add 2 bedrooms, 1 full bath, living/family & storage room at 1st flr. remodel kitchen, add 1 full bath at 2nd flrDetails
infill 2 side lightwells. add 2 bedrooms, 1 full bath, living/family & storage room at 1st flr. remodel kitchen, add 1 full bath at 2nd flr | $180,000 |
| Feb 11, 2019 | Completed final sign-off Oct 2019 | 1522 24th Av | remodel (e) kitchen at 2nd fl. new skylight new window & door at (e) light wellDetails
remodel (e) kitchen at 2nd fl. new skylight new window & door at (e) light well | $30,300 |
| Aug 20, 2018 | Completed final sign-off Nov 2018 | 2331 Francisco St | demo (e) kitchen cabinets & appliances-install n/new, no structural work to be doneDetails
demo (e) kitchen cabinets & appliances-install n/new, no structural work to be done | $25,000 |
| Mar 29, 2018 | Completed final sign-off Oct 2018 | 838 31st Av | remove wall between kitchen and dining room. remodel kitchen and (e) bathroom .remove closet to accomodate full bath, incorporate powder room into full bathDetails
remove wall between kitchen and dining room. remodel kitchen and (e) bathroom .remove closet to accomodate full bath, incorporate powder room into full bath | $30,000 |
| Sep 2, 2016 | Completed final sign-off Feb 2017 | 37 Clement St | remodel existing kitchen, no structural, remove lath & plaster. new insulation/drywall, install new cabinets.Details
remodel existing kitchen, no structural, remove lath & plaster. new insulation/drywall, install new cabinets. | $30,000 |
| Apr 30, 2014 | Completed final sign-off Aug 2014 | 496 Pacheco St | replace kitchen cabinetry w/new. some demo, no structural work in kitchen. no chnge of wall, window and door. at side deck replace/repair dry rotted wood members. less than 50% of deck.Details
replace kitchen cabinetry w/new. some demo, no structural work in kitchen. no chnge of wall, window and door. at side deck replace/repair dry rotted wood members. less than 50% of deck. | $25,000 |
| Aug 22, 2013 | Completed final sign-off Dec 2013 | 2329 Francisco St | remodel (e) kitchen. no structural work to be performed. remove (e) cabinets & drywall. install new cabinetry/drywall/appliances.Details
remodel (e) kitchen. no structural work to be performed. remove (e) cabinets & drywall. install new cabinetry/drywall/appliances. | $20,000 |
| Nov 22, 2010 | Completed final sign-off Feb 2011 | 415 Ellsworth St | remove old & replace with new kitchen cabinets & counter top. no structural work included. min 50% per wattage of kitchen lights shall be of high efficacy fixture per cec150kDetails
remove old & replace with new kitchen cabinets & counter top. no structural work included. min 50% per wattage of kitchen lights shall be of high efficacy fixture per cec150k | $20,000 |
| Oct 25, 2007 | Completed final sign-off Jan 2008 | 1129 Douglass St | remodel existing kitchen. install new cabinets & tile floor/drywall.no structural work.Details
remodel existing kitchen. install new cabinets & tile floor/drywall.no structural work. | $30,000 |
| Jul 23, 2007 | Completed final sign-off Oct 2007 | 4309 19th St | remodel (e) kitchen. replacing (e) kitchen cabinets and appliances. no structural workDetails
remodel (e) kitchen. replacing (e) kitchen cabinets and appliances. no structural work | $20,000 |