Back to kitchen remodel contractors
Norman Charles Construction
- Based in
- San Rafael
- On San Francisco permits
- Jan 2000 to Jun 2026
- Last 24 months
- 5 permits filed
69 permits since 2000: 56 completed, 2 in progress, 8 never finaled, 3 expired or cancelled.
Of the 8 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
16 kitchen remodel permits: 14 completed, 1 in progress, 1 never finaled. Typically 0 days from filing to permit and 284 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 20, 2026 | In progress issued May 2026 | 2100 Green St | unit #706: partial replacement of interior fixtures new kitchen cabinets countertops, flooring, appliances misc recessed and led lighting throuought new laundry room, new shower doors in primary bathroom misc cabinetry througout new av systemDetails
unit #706: partial replacement of interior fixtures new kitchen cabinets countertops, flooring, appliances misc recessed and led lighting throuought new laundry room, new shower doors in primary bathroom misc cabinetry througout new av system | $200,000 |
| Dec 27, 2022 | Completed final sign-off Dec 2023 | 2323 Bush St | renovation of great room, living room, primary bedroom, kitchen, & laundryDetails
renovation of great room, living room, primary bedroom, kitchen, & laundry | $100,000 |
| Mar 8, 2022 | Completed final sign-off Nov 2022 | 3535 Washington St | kitchen, master bath, powder room remodel. refinish floors, paint throughout. new interior doors and hardware, new cans, decorative light fixtures,Details
kitchen, master bath, powder room remodel. refinish floors, paint throughout. new interior doors and hardware, new cans, decorative light fixtures, | $730,000 |
| Jan 31, 2022 | Completed final sign-off Dec 2022 | 26 Presidio Tr | renovate 2 powder rooms/refinish flooring/paint 2 interior floors. replace kitchen island countertop/install built-in cabinets @ office. replace surface mount exterior fixtures and cans in various locations. wall paper select walls. repaint exterior brick. replace hardware @ various locations (cont)Details
renovate 2 powder rooms/refinish flooring/paint 2 interior floors. replace kitchen island countertop/install built-in cabinets @ office. replace surface mount exterior fixtures and cans in various locations. wall paper select walls. repaint exterior brick. replace hardware @ various locations (cont) | $250,000 |
| Oct 14, 2021 | Completed final sign-off Mar 2023 | 507 Valley St | remodel kitchen and 4 baths. relocation of laundry room. addition of bath at basement. relocateion of non structural inteiror walls at kitchen.new wood flooring throughout. replace treads, risers and railings at all interior stairsDetails
remodel kitchen and 4 baths. relocation of laundry room. addition of bath at basement. relocateion of non structural inteiror walls at kitchen.new wood flooring throughout. replace treads, risers and railings at all interior stairs | $135,000 |
| Oct 13, 2021 | Completed final sign-off Feb 2022 | 1450 Green St | unit 2: bathroom remodel. replace fixtures in same location. convert tub shower to shower stall. refinish hardwood floors. replace kitchen floors. paint unit. partial kitchen remodel, replace select cabinets, sink, and faucet. new countertops.Details
unit 2: bathroom remodel. replace fixtures in same location. convert tub shower to shower stall. refinish hardwood floors. replace kitchen floors. paint unit. partial kitchen remodel, replace select cabinets, sink, and faucet. new countertops. | $180,000 |
| Oct 7, 2020 | Completed final sign-off Aug 2021 | 651 29th St | remodel kitchen and laundry room and replace cabinets, finishes, appliances and lighting.fixtures to remain at extg locations. remodel master bath and closet. replace cabinet, finishes, fixtures and lights. fixtures remain at extg locations.Details
remodel kitchen and laundry room and replace cabinets, finishes, appliances and lighting.fixtures to remain at extg locations. remodel master bath and closet. replace cabinet, finishes, fixtures and lights. fixtures remain at extg locations. | $100,000 |
| Jun 25, 2019 | Completed final sign-off Jan 2021 | 3710 Clay St | renovation (e) kitchen, office and powder room on 1st flr. 2/f: renovation of laundry, dressing room and 2 baths. remove stair between 1st and 2nd floor. remove chimney.Details
renovation (e) kitchen, office and powder room on 1st flr. 2/f: renovation of laundry, dressing room and 2 baths. remove stair between 1st and 2nd floor. remove chimney. | $162,000 |
| Mar 23, 2018 | Completed final sign-off Nov 2018 | 2431 Filbert St | kitchen and bathroom remodelDetails
kitchen and bathroom remodel | $19,555 |
| Sep 14, 2017 | Completed final sign-off Sep 2018 | 2423 Filbert St | interior remodel to include kitchen and bath, lighting and new shingles on front facadeDetails
interior remodel to include kitchen and bath, lighting and new shingles on front facade | $250,000 |
| Mar 22, 2016 | Completed final sign-off Jul 2016 | 2919 Pacific Av | #6 - remodel 2 bathrooms, 1 kitchen, new fixtures, finishes, appliances, light plan throughout.Details
#6 - remodel 2 bathrooms, 1 kitchen, new fixtures, finishes, appliances, light plan throughout. | $75,000 |
| Mar 19, 2015 | Completed final sign-off Jul 2016 | 24 Bennington St | proposed additions include a roof deck over an (e) kitchen. a raised deck off the (e) kitchen with a connecting stair to the (e) garden. replacement of the (e) rear yard stair to bocana street & an awning over the front entry facing bennington street. revision to p/a#201406300092 eliminateDetails
proposed additions include a roof deck over an (e) kitchen. a raised deck off the (e) kitchen with a connecting stair to the (e) garden. replacement of the (e) rear yard stair to bocana street & an awning over the front entry facing bennington street. revision to p/a#201406300092 eliminate | $53,500 |
| Oct 3, 2007 | Completed final sign-off Mar 2008 | 721 Duboce Av | replace door and window at rear yard. cap stove & remove. cap pipe remove kitchen sink. legalize living room, sitting room and full bath on ground floor behind garage.Details
replace door and window at rear yard. cap stove & remove. cap pipe remove kitchen sink. legalize living room, sitting room and full bath on ground floor behind garage. | $40,000 |
| Jul 11, 2007 | Never finaled issued Jul 2007, no final | 721 Duboce Av | add 1'-8" shed roof over new door at rear of building at kitchen door.Details
add 1'-8" shed roof over new door at rear of building at kitchen door. | $10,000 |
| Feb 16, 2007 | Completed final sign-off Feb 2008 | 721 Duboce Av | remodel: existing (1) kitchen, 1 existing power room and (2) existing bathrooms 50% high efficacy lighting. replace door & 2 windows with a larger unit in same location.Details
remodel: existing (1) kitchen, 1 existing power room and (2) existing bathrooms 50% high efficacy lighting. replace door & 2 windows with a larger unit in same location. | $250,000 |
| Feb 16, 2007 | Completed final sign-off Nov 2008 | 2972 Pacific Av | kitchen remodel and addition. window replacement and relocation, replace deck. replace of trim at back of house. replace access stairs to existing under floor area.Details
kitchen remodel and addition. window replacement and relocation, replace deck. replace of trim at back of house. replace access stairs to existing under floor area. | $200,000 |