Block 0547, lot 005
1450 Green St
- City’s use
- Multi-Family Residential
- Built
- 1927
- Stories
- 5
- Units
- 8
- Rooms
- 11 bedrooms, 12 bathrooms
- Building
- 13,444 sq ft
- Lot
- 4,375 sq ft
- Zoning
- POLK
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
28 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 9, 2026 | Completed final sign-off Apr 2026 | 1450 Green St | Hubert Penny | unit #1: to remodel shower in bathroomDetails
unit #1: to remodel shower in bathroom | $10,000 |
| Aug 25, 2023 | Never finaled issued Aug 2023, no final | 1450 Green St | Everest Waterproofing & Restoration Inc. | expose areas of spalled concrete at west side and repair as per drawings - exterior only.Details
expose areas of spalled concrete at west side and repair as per drawings - exterior only. | $21,000 |
| Oct 13, 2021 | Completed final sign-off Feb 2022 | 1450 Green St | Norman Charles Construction | unit 2: bathroom remodel. replace fixtures in same location. convert tub shower to shower stall. refinish hardwood floors. replace kitchen floors. paint unit. partial kitchen remodel, replace select cabinets, sink, and faucet. new countertops.Details
unit 2: bathroom remodel. replace fixtures in same location. convert tub shower to shower stall. refinish hardwood floors. replace kitchen floors. paint unit. partial kitchen remodel, replace select cabinets, sink, and faucet. new countertops. | $180,000 |
| Mar 12, 2021 | Completed final sign-off Dec 2021 | 1450 Green St | Northbay Home Construction Solutions Inc | #5: bathroom remodel. replacing like for ike, retile, paint.Details
#5: bathroom remodel. replacing like for ike, retile, paint. | $12,000 |
| Nov 22, 2019 | Completed final sign-off Mar 2020 | 1450 Green St | Bay Area Window Pros | relace (7) windows not visible from street to marvin wood alum clad casements. u factor 0.32 maxDetails
relace (7) windows not visible from street to marvin wood alum clad casements. u factor 0.32 max | $29,000 |
| Mar 6, 2014 | Completed final sign-off Mar 2014 | 1450 Green St | Matarozzi/Pelsinger Builders Inc. | #7-change unit # from #5 to #7 on pa#201403039657Details
#7-change unit # from #5 to #7 on pa#201403039657 | |
| Mar 3, 2014 | Completed final sign-off Mar 2014 | 1450 Green St | Matarozzi/Pelsinger Builders Inc. | unit # 5:to comply with his violatioons #201303531 & 201394311 - fix dry rot windows, r/r stove, paint walls, repair flooring;; electrical work under separate permit.Details
unit # 5:to comply with his violatioons #201303531 & 201394311 - fix dry rot windows, r/r stove, paint walls, repair flooring;; electrical work under separate permit. | $7,000 |
| Feb 26, 2014 | Never finaled issued Feb 2014, no final | 1450 Green St | street spaceDetails
street space | ||
| Dec 4, 2013 | Never finaled issued Dec 2013, no final | 1450 Green St | street space permitDetails
street space permit | ||
| Nov 18, 2013 | Completed final sign-off Oct 2014 | 1450 Green St | Brennan Strong Hold Construction Inc | beam repair between grid line 7-19 on 4th floor & roof.Details
beam repair between grid line 7-19 on 4th floor & roof. | $8,000 |
| Jul 9, 2013 | Completed final sign-off Apr 2014 | 1450 Green St | Smith-Hyder Inc. | #7- refinish & repair hardwood floors, paint to comply with nov dated 5/13/2013 #201303531Details
#7- refinish & repair hardwood floors, paint to comply with nov dated 5/13/2013 #201303531 | $8,000 |
| May 13, 2013 | Never finaled issued May 2013, no final | 1450 Green St | street spaceDetails
street space | ||
| Apr 2, 2013 | Never finaled issued Apr 2013, no final | 1450 Green St | street spaceDetails
street space | ||
| Mar 25, 2013 | Never finaled issued Mar 2013, no final | 1450 Green St | Axis Construction | repair exterior stucco cracks above 4th & 5th flrrs windows, 20 lf of west facing wall & 20 lf of north facing wall. chip away 2" strip on both sides of cracks, patch stucco to match existing, prime paint to match existingDetails
repair exterior stucco cracks above 4th & 5th flrrs windows, 20 lf of west facing wall & 20 lf of north facing wall. chip away 2" strip on both sides of cracks, patch stucco to match existing, prime paint to match existing | $6,000 |
| Mar 5, 2010 | Never finaled issued Mar 2010, no final | 1450 Green St | street space permitDetails
street space permit | ||
| Feb 2, 2010 | Never finaled issued Feb 2010, no final | 1450 Green St | street space permit only.Details
street space permit only. | ||
| Nov 13, 2009 | Never finaled issued Nov 2009, no final | 1450 Green St | street space permit.Details
street space permit. | ||
| Apr 20, 2009 | Never finaled issued Apr 2009, no final | 1450 Green St | street space permit only.Details
street space permit only. | ||
| Mar 9, 2009 | Never finaled issued Mar 2009, no final | 1450 Green St | street space only.Details
street space only. | ||
| Feb 26, 2009 | Completed final sign-off Apr 2009 | 1450 Green St | Atchison Construction | unit #1:closing door to breezeway. open wall into main unit #1 and install door. new light fixtures and one additional outlet.Details
unit #1:closing door to breezeway. open wall into main unit #1 and install door. new light fixtures and one additional outlet. | $17,000 |
| Jul 26, 2006 | Never finaled issued Jul 2006, no final | 1450 Green St | kitchen upgrade indluding electrical, some plumbing, some new cabinets no recongifuration of lkitchen layout.Details
kitchen upgrade indluding electrical, some plumbing, some new cabinets no recongifuration of lkitchen layout. | $11,500 | |
| Apr 7, 2006 | Completed final sign-off Aug 2006 | 1450 Green St | Vision Construction | residential bathroom remodel residential electrical remodel work on 2/f lighting to comply with title 24 energy codesDetails
residential bathroom remodel residential electrical remodel work on 2/f lighting to comply with title 24 energy codes | $47,000 |
| Aug 30, 2002 | Completed final sign-off Dec 2002 | 1450 Green St | interior remodel of apt,mainly cosmetic: repl bathrm fixtures,hardware & cabinetryDetails
interior remodel of apt,mainly cosmetic: repl bathrm fixtures,hardware & cabinetry | $50,000 | |
| May 14, 2001 | Expired or cancelled expired Nov 2001 | 1450 Green St | Philip Going Inc. | parapet bracingDetails
parapet bracing | $20,000 |
| Aug 15, 2000 | Completed final sign-off Dec 2000 | 1450 Green St | Philip Going Inc. | as built drawings in association w/ permit 911763Details
as built drawings in association w/ permit 911763 | |
| Jun 9, 2000 | Completed final sign-off Dec 2000 | 1450 Green St | Philip Going Inc. | remodel kitchenDetails
remodel kitchen | $45,000 |
| Jun 9, 2000 | Completed final sign-off Dec 2000 | 1450 Green St | Philip Going Inc. | remodel kitchenDetails
remodel kitchen | $65,000 |
| Mar 6, 2000 | Completed final sign-off Jun 2000 | 1450 Green St | Philip Going Inc. | remodel kitchen, new bath fixtures, no structural workDetails
remodel kitchen, new bath fixtures, no structural work |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.