Back to bathroom remodel contractors
Norman Charles Construction
- Based in
- San Rafael
- On San Francisco permits
- Jan 2000 to Jun 2026
- Last 24 months
- 5 permits filed
69 permits since 2000: 56 completed, 2 in progress, 8 never finaled, 3 expired or cancelled.
Of the 8 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
19 bathroom remodel permits: 16 completed, 2 in progress, 1 expired or cancelled. Typically 0 days from filing to permit and 281 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 3, 2026 | In progress issued Jun 2026 | 249 Bocana St | interior alteration including removal of (e) fireplace, new level 2 bath tub/shower replacement, full level 3 bath renovation along with a new half bath.Details
interior alteration including removal of (e) fireplace, new level 2 bath tub/shower replacement, full level 3 bath renovation along with a new half bath. | $250,000 |
| May 20, 2026 | In progress issued May 2026 | 2100 Green St | unit #706: partial replacement of interior fixtures new kitchen cabinets countertops, flooring, appliances misc recessed and led lighting throuought new laundry room, new shower doors in primary bathroom misc cabinetry througout new av systemDetails
unit #706: partial replacement of interior fixtures new kitchen cabinets countertops, flooring, appliances misc recessed and led lighting throuought new laundry room, new shower doors in primary bathroom misc cabinetry througout new av system | $200,000 |
| Nov 29, 2022 | Completed final sign-off Mar 2023 | 507 Valley St | revision to pa# 202110140443 to remove basement bathroom from scope.Details
revision to pa# 202110140443 to remove basement bathroom from scope. | |
| Mar 25, 2022 | Completed final sign-off Nov 2022 | 3535 Washington St | replace 6 rotted sashes at front elevation. replace 1 sash on side of house. master bathroom: replace 2 french doors at rear elevation. all work to be replaced in-kind in (e) opening. wood to wood sashesDetails
replace 6 rotted sashes at front elevation. replace 1 sash on side of house. master bathroom: replace 2 french doors at rear elevation. all work to be replaced in-kind in (e) opening. wood to wood sashes | $8,000 |
| Mar 8, 2022 | Completed final sign-off Nov 2022 | 3535 Washington St | kitchen, master bath, powder room remodel. refinish floors, paint throughout. new interior doors and hardware, new cans, decorative light fixtures,Details
kitchen, master bath, powder room remodel. refinish floors, paint throughout. new interior doors and hardware, new cans, decorative light fixtures, | $730,000 |
| Jan 4, 2022 | Expired or cancelled expired Oct 2025 | 3710 Clay St | convert of (e) attic to habirable space; addition of new staircase connecting (e) 2nd fl and (e) attic; addition of (3) dormoers, skylights and window @ (e) mamsard roof; (2) new bedrooms & (1) new bathroom.Details
convert of (e) attic to habirable space; addition of new staircase connecting (e) 2nd fl and (e) attic; addition of (3) dormoers, skylights and window @ (e) mamsard roof; (2) new bedrooms & (1) new bathroom. | $67,200 |
| Oct 14, 2021 | Completed final sign-off Mar 2023 | 507 Valley St | remodel kitchen and 4 baths. relocation of laundry room. addition of bath at basement. relocateion of non structural inteiror walls at kitchen.new wood flooring throughout. replace treads, risers and railings at all interior stairsDetails
remodel kitchen and 4 baths. relocation of laundry room. addition of bath at basement. relocateion of non structural inteiror walls at kitchen.new wood flooring throughout. replace treads, risers and railings at all interior stairs | $135,000 |
| Oct 13, 2021 | Completed final sign-off Feb 2022 | 1450 Green St | unit 2: bathroom remodel. replace fixtures in same location. convert tub shower to shower stall. refinish hardwood floors. replace kitchen floors. paint unit. partial kitchen remodel, replace select cabinets, sink, and faucet. new countertops.Details
unit 2: bathroom remodel. replace fixtures in same location. convert tub shower to shower stall. refinish hardwood floors. replace kitchen floors. paint unit. partial kitchen remodel, replace select cabinets, sink, and faucet. new countertops. | $180,000 |
| Oct 7, 2020 | Completed final sign-off Aug 2021 | 651 29th St | remodel kitchen and laundry room and replace cabinets, finishes, appliances and lighting.fixtures to remain at extg locations. remodel master bath and closet. replace cabinet, finishes, fixtures and lights. fixtures remain at extg locations.Details
remodel kitchen and laundry room and replace cabinets, finishes, appliances and lighting.fixtures to remain at extg locations. remodel master bath and closet. replace cabinet, finishes, fixtures and lights. fixtures remain at extg locations. | $100,000 |
| Jun 25, 2019 | Completed final sign-off Jan 2021 | 3710 Clay St | renovation (e) kitchen, office and powder room on 1st flr. 2/f: renovation of laundry, dressing room and 2 baths. remove stair between 1st and 2nd floor. remove chimney.Details
renovation (e) kitchen, office and powder room on 1st flr. 2/f: renovation of laundry, dressing room and 2 baths. remove stair between 1st and 2nd floor. remove chimney. | $162,000 |
| Mar 23, 2018 | Completed final sign-off Nov 2018 | 2431 Filbert St | kitchen and bathroom remodelDetails
kitchen and bathroom remodel | $19,555 |
| Sep 14, 2017 | Completed final sign-off Sep 2018 | 2423 Filbert St | interior remodel to include kitchen and bath, lighting and new shingles on front facadeDetails
interior remodel to include kitchen and bath, lighting and new shingles on front facade | $250,000 |
| Mar 6, 2017 | Completed final sign-off Jun 2017 | 2545 Divisadero St | remove and replace bathroom window. same style and open. u < 0.32. not visible from street.Details
remove and replace bathroom window. same style and open. u < 0.32. not visible from street. | $41,000 |
| Mar 22, 2016 | Completed final sign-off Jul 2016 | 2919 Pacific Av | #6 - remodel 2 bathrooms, 1 kitchen, new fixtures, finishes, appliances, light plan throughout.Details
#6 - remodel 2 bathrooms, 1 kitchen, new fixtures, finishes, appliances, light plan throughout. | $75,000 |
| Oct 26, 2015 | Completed final sign-off May 2017 | 315 Laurel St | attic renovation in (e) 3 story home with new roof alteration @ new bathroom, new rear patio & guardrall, new skylights, windows replaced in kind, stair from level 3 to attic replaced in kind.Details
attic renovation in (e) 3 story home with new roof alteration @ new bathroom, new rear patio & guardrall, new skylights, windows replaced in kind, stair from level 3 to attic replaced in kind. | $120,000 |
| Oct 28, 2013 | Completed final sign-off Nov 2017 | 51 Wilmot St | renovate (e) home that shares a lot with 2150 bush street. include 869 sq.ft addition with new master bedroom & bath. project pending a lot split & rear & front yard setback variences.Details
renovate (e) home that shares a lot with 2150 bush street. include 869 sq.ft addition with new master bedroom & bath. project pending a lot split & rear & front yard setback variences. | $125,000 |
| Oct 28, 2013 | Completed final sign-off Jan 2018 | 2150 Bush St | front bldg. renovate (e) single family residence that shares a lot with 51 wilmot street. include 225 sq.ft addition with master bath. project pending a lot split & rear yard setback variences.Details
front bldg. renovate (e) single family residence that shares a lot with 51 wilmot street. include 225 sq.ft addition with master bath. project pending a lot split & rear yard setback variences. | $200,000 |
| Oct 3, 2007 | Completed final sign-off Mar 2008 | 721 Duboce Av | replace door and window at rear yard. cap stove & remove. cap pipe remove kitchen sink. legalize living room, sitting room and full bath on ground floor behind garage.Details
replace door and window at rear yard. cap stove & remove. cap pipe remove kitchen sink. legalize living room, sitting room and full bath on ground floor behind garage. | $40,000 |
| Feb 16, 2007 | Completed final sign-off Feb 2008 | 721 Duboce Av | remodel: existing (1) kitchen, 1 existing power room and (2) existing bathrooms 50% high efficacy lighting. replace door & 2 windows with a larger unit in same location.Details
remodel: existing (1) kitchen, 1 existing power room and (2) existing bathrooms 50% high efficacy lighting. replace door & 2 windows with a larger unit in same location. | $250,000 |