Norman Charles Construction
- Based in
- San Rafael
- On San Francisco permits
- Jan 2000 to Jun 2026
- Last 24 months
- 5 permits filed
69 permits since 2000: 56 completed, 2 in progress, 8 never finaled, 3 expired or cancelled.
Of the 8 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
6 deck permits: 6 completed. Typically 148 days from filing to permit and 233 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 12, 2024 | Completed final sign-off Jun 2025 | 2741 Union St | replacement and expansion of (e) rear deck with (n) deck and firewallDetails
replacement and expansion of (e) rear deck with (n) deck and firewall | $30,000 |
| Aug 4, 2021 | Completed final sign-off Jan 2022 | 20 Clarendon Av | replace slider in kind; replace tile deck in-kind. no change in material or size. stucco patch slider and waterproof as necessaryDetails
replace slider in kind; replace tile deck in-kind. no change in material or size. stucco patch slider and waterproof as necessary | $22,000 |
| Feb 27, 2020 | Completed final sign-off Dec 2022 | 13 Presidio Tr | (n) wood deck over (e) garage roof. (n) wood connecting bridge and stair between (e) garage and (e) wood deck at south west corner of (e) dwelling. (n) wood stair to rear yard at west property line. all work to (e) dwelling under separate permit. ** maher: n/a **Details
(n) wood deck over (e) garage roof. (n) wood connecting bridge and stair between (e) garage and (e) wood deck at south west corner of (e) dwelling. (n) wood stair to rear yard at west property line. all work to (e) dwelling under separate permit. ** maher: n/a ** | $75,000 |
| May 24, 2018 | Completed final sign-off Oct 2018 | 2431 Filbert St | replace & expand (e) rear deckDetails
replace & expand (e) rear deck | $7,500 |
| Aug 1, 2007 | Completed final sign-off Jul 2008 | 721 Duboce Av | remove & rebuild deck & stairs at rearDetails
remove & rebuild deck & stairs at rear | $20,000 |
| Feb 16, 2007 | Completed final sign-off Nov 2008 | 2972 Pacific Av | kitchen remodel and addition. window replacement and relocation, replace deck. replace of trim at back of house. replace access stairs to existing under floor area.Details
kitchen remodel and addition. window replacement and relocation, replace deck. replace of trim at back of house. replace access stairs to existing under floor area. | $200,000 |