Nielsen Aire Construction
- Based in
- Sebastopol
- On San Francisco permits
- Jan 2000 to Nov 2015
- Last 24 months
- 0 permits filed
62 permits since 2000: 39 completed, 4 never finaled, 19 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
6 stairs permits: 6 completed. Typically 28 days from filing to permit and 414 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 22, 2015 | Completed final sign-off Oct 2016 | 74 Museum Wy | revision to pa 2007 0529 2443: tie backs at (e) retaining wall, shotcrete wall to hold (e) foundation retaining wall, move staircase (interior), move 1 bath from floor 0 to floor 1.Details
revision to pa 2007 0529 2443: tie backs at (e) retaining wall, shotcrete wall to hold (e) foundation retaining wall, move staircase (interior), move 1 bath from floor 0 to floor 1. | $15,000 |
| Oct 30, 2009 | Completed final sign-off May 2011 | 707 15th Av | unit #707: basement remodel to add new conditioned media room, full bath room, closet with new connecting stair from 1st fl kitchen/dining area. new on demand hw heater, (e) fau to be relocated in new mech roomDetails
unit #707: basement remodel to add new conditioned media room, full bath room, closet with new connecting stair from 1st fl kitchen/dining area. new on demand hw heater, (e) fau to be relocated in new mech room | $35,000 |
| Aug 28, 2008 | Completed final sign-off Sep 2009 | 754 03rd Av | add gypsum board to walls & ceiling, remodel kitchen & bath at main level, remodel bath & add full bthroom, fill in light well @ upper level. add skylights @ (e) roof. remove & replace deck & exterior deck stairs.Details
add gypsum board to walls & ceiling, remodel kitchen & bath at main level, remodel bath & add full bthroom, fill in light well @ upper level. add skylights @ (e) roof. remove & replace deck & exterior deck stairs. | $200,000 |
| May 29, 2007 | Completed final sign-off Oct 2016 | 74 Museum Wy | 1st-4th floor; rear addition to be added to 4 story residential unit, creating additional living space on ea flr. new 1/2 bath added on 2nd flr, bedroom on 1st flr, 3 new decks. extend garage at front to match 3rd & 4th floors. new stairs leading to 1st floor and new exterior stairs leading to yard.Details
1st-4th floor; rear addition to be added to 4 story residential unit, creating additional living space on ea flr. new 1/2 bath added on 2nd flr, bedroom on 1st flr, 3 new decks. extend garage at front to match 3rd & 4th floors. new stairs leading to 1st floor and new exterior stairs leading to yard. | $180,000 |
| May 4, 2006 | Completed final sign-off Sep 2006 | 501 Folsom St | renew permits for final inspection 2002/08/09/3641 remove (e) non conforming exit 2002/09/18/6828 non structural demo 2002/12/12/3403 revise to 200210179290 stair structural 200402267266 renew permits for finalDetails
renew permits for final inspection 2002/08/09/3641 remove (e) non conforming exit 2002/09/18/6828 non structural demo 2002/12/12/3403 revise to 200210179290 stair structural 200402267266 renew permits for final | |
| Aug 11, 2005 | Completed final sign-off Apr 2007 | 433 Turk St | outpatient clinic for drug treatment & counseling.interior demolition,stairs,elevator,partitions,Details
outpatient clinic for drug treatment & counseling.interior demolition,stairs,elevator,partitions, | $500,000 |