Nielsen Aire Construction
- Based in
- Sebastopol
- On San Francisco permits
- Jan 2000 to Nov 2015
- Last 24 months
- 0 permits filed
62 permits since 2000: 39 completed, 4 never finaled, 19 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
3 deck permits: 3 completed. Typically 0 days from filing to permit and 370 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 28, 2008 | Completed final sign-off Sep 2009 | 754 03rd Av | add gypsum board to walls & ceiling, remodel kitchen & bath at main level, remodel bath & add full bthroom, fill in light well @ upper level. add skylights @ (e) roof. remove & replace deck & exterior deck stairs.Details
add gypsum board to walls & ceiling, remodel kitchen & bath at main level, remodel bath & add full bthroom, fill in light well @ upper level. add skylights @ (e) roof. remove & replace deck & exterior deck stairs. | $200,000 |
| May 29, 2007 | Completed final sign-off Oct 2016 | 74 Museum Wy | 1st-4th floor; rear addition to be added to 4 story residential unit, creating additional living space on ea flr. new 1/2 bath added on 2nd flr, bedroom on 1st flr, 3 new decks. extend garage at front to match 3rd & 4th floors. new stairs leading to 1st floor and new exterior stairs leading to yard.Details
1st-4th floor; rear addition to be added to 4 story residential unit, creating additional living space on ea flr. new 1/2 bath added on 2nd flr, bedroom on 1st flr, 3 new decks. extend garage at front to match 3rd & 4th floors. new stairs leading to 1st floor and new exterior stairs leading to yard. | $180,000 |
| Jun 16, 2006 | Completed final sign-off Jul 2006 | 74 Museum Wy | remove deck on floor 2,3 insulate and patch siding to match exterior vinyl siding. remove or legalize kitchen built in 1977, inspect outlets upgraded to gfci as indicated in plans. to comply with dbi nov #200451036Details
remove deck on floor 2,3 insulate and patch siding to match exterior vinyl siding. remove or legalize kitchen built in 1977, inspect outlets upgraded to gfci as indicated in plans. to comply with dbi nov #200451036 | $10,000 |