Back to kitchen remodel contractors
Nielsen Aire Construction
- Based in
- Sebastopol
- On San Francisco permits
- Jan 2000 to Nov 2015
- Last 24 months
- 0 permits filed
62 permits since 2000: 39 completed, 4 never finaled, 19 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 8 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 262 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 14, 2015 | Completed final sign-off Jan 2017 | 1221 14th Av | legalization of dwelling unit of 598 sq. ft. at ground floor level, 2 bedroom, living room, kitchen and bathroom (unit legalization ordinance 43-14)Details
legalization of dwelling unit of 598 sq. ft. at ground floor level, 2 bedroom, living room, kitchen and bathroom (unit legalization ordinance 43-14) | $2,000 |
| Dec 21, 2011 | Completed final sign-off Aug 2012 | 74 Museum Wy | comply with physical inspection report cc-5913 - includes kitchen remodel in 74. reinspect bath on floor 1 to meet report cc-5913 related to 200606164259.Details
comply with physical inspection report cc-5913 - includes kitchen remodel in 74. reinspect bath on floor 1 to meet report cc-5913 related to 200606164259. | $12,000 |
| Oct 30, 2009 | Completed final sign-off May 2011 | 707 15th Av | unit #707: basement remodel to add new conditioned media room, full bath room, closet with new connecting stair from 1st fl kitchen/dining area. new on demand hw heater, (e) fau to be relocated in new mech roomDetails
unit #707: basement remodel to add new conditioned media room, full bath room, closet with new connecting stair from 1st fl kitchen/dining area. new on demand hw heater, (e) fau to be relocated in new mech room | $35,000 |
| Nov 17, 2008 | Completed final sign-off Mar 2009 | 3631 19th St | remodel 1 kitchen & bath of 3631-a including add furnace, ducts, laundry hookup, new closet opening in master, upgrade electrical, new flooring in hallway. add (4) exterior lights. lower ceiling in halls to accomodate ducts.Details
remodel 1 kitchen & bath of 3631-a including add furnace, ducts, laundry hookup, new closet opening in master, upgrade electrical, new flooring in hallway. add (4) exterior lights. lower ceiling in halls to accomodate ducts. | $25,000 |
| Aug 28, 2008 | Completed final sign-off Sep 2009 | 754 03rd Av | add gypsum board to walls & ceiling, remodel kitchen & bath at main level, remodel bath & add full bthroom, fill in light well @ upper level. add skylights @ (e) roof. remove & replace deck & exterior deck stairs.Details
add gypsum board to walls & ceiling, remodel kitchen & bath at main level, remodel bath & add full bthroom, fill in light well @ upper level. add skylights @ (e) roof. remove & replace deck & exterior deck stairs. | $200,000 |
| Jun 16, 2006 | Completed final sign-off Jul 2006 | 74 Museum Wy | remove deck on floor 2,3 insulate and patch siding to match exterior vinyl siding. remove or legalize kitchen built in 1977, inspect outlets upgraded to gfci as indicated in plans. to comply with dbi nov #200451036Details
remove deck on floor 2,3 insulate and patch siding to match exterior vinyl siding. remove or legalize kitchen built in 1977, inspect outlets upgraded to gfci as indicated in plans. to comply with dbi nov #200451036 | $10,000 |
| Dec 21, 2005 | Completed final sign-off Sep 2006 | 52 Pleasant St | no work on exterior of building. complete dry rot repair; replace sheetrock, insulation, & rotted lumber; replace plumbing fixtures; replace kitchen appliances & cabinets; replace furnaces & hot water tanks; replace exposed wiring & electrical; revise door openings.Details
no work on exterior of building. complete dry rot repair; replace sheetrock, insulation, & rotted lumber; replace plumbing fixtures; replace kitchen appliances & cabinets; replace furnaces & hot water tanks; replace exposed wiring & electrical; revise door openings. | $90,000 |
| Nov 20, 2002 | Expired or cancelled expired Nov 2005 | 501 02nd St | add partitions, new carpeting, new vinyl tile, new doors, new opening to kitchenDetails
add partitions, new carpeting, new vinyl tile, new doors, new opening to kitchen | $40,000 |
| Oct 2, 2002 | Completed final sign-off Dec 2003 | 422 Vallejo St | remodel kitchen, replace plaster w/ drywallDetails
remodel kitchen, replace plaster w/ drywall | $80,000 |