Block 1658, lot 001
707 15th Ave
- City’s use
- Multi-Family Residential
- Built
- 1919
- Stories
- 2
- Units
- 4
- Rooms
- 7 bedrooms, 5 bathrooms
- Building
- 4,232 sq ft
- Lot
- 2,748 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 3, 2022 | Completed final sign-off Dec 2022 | 707 15th Av | Ward-Tek Inc. | water damage in-kind repairs.repairs located in bedroom, small office & bathroom. new drywall, insulation & finishes in bathroom. reinstall shower tile, toilet & vanity.water proof and seal (e) area. bed & small office: patch drywall, new insulation at flood cuts.Details
water damage in-kind repairs.repairs located in bedroom, small office & bathroom. new drywall, insulation & finishes in bathroom. reinstall shower tile, toilet & vanity.water proof and seal (e) area. bed & small office: patch drywall, new insulation at flood cuts. | $25,000 |
| Apr 10, 2017 | Never finaled issued Apr 2017, no final | 707 15th Av | street spaceDetails
street space | ||
| Sep 4, 2013 | Completed final sign-off Sep 2013 | 703 15th Av | Westech Roofing Co | re-roofingDetails
re-roofing | $10,200 |
| Jan 5, 2010 | Expired or cancelled expired Mar 2017 | 707 15th Av | Nielsen Aire Construction | basement: 5 fire sprinklers, control valveDetails
basement: 5 fire sprinklers, control valve | $3,000 |
| Oct 30, 2009 | Completed final sign-off May 2011 | 707 15th Av | Nielsen Aire Construction | unit #707: basement remodel to add new conditioned media room, full bath room, closet with new connecting stair from 1st fl kitchen/dining area. new on demand hw heater, (e) fau to be relocated in new mech roomDetails
unit #707: basement remodel to add new conditioned media room, full bath room, closet with new connecting stair from 1st fl kitchen/dining area. new on demand hw heater, (e) fau to be relocated in new mech room | $35,000 |
| Dec 15, 2008 | Completed final sign-off Feb 2009 | 703 15th Av | Hubert Penny | updated 2 kitchen, 2 bathrooms @ unit 703 - 707. replace kitchen cabinet,counter,sink. new tile, mixer and faucet in bathroom. no structural work.Details
updated 2 kitchen, 2 bathrooms @ unit 703 - 707. replace kitchen cabinet,counter,sink. new tile, mixer and faucet in bathroom. no structural work. | $22,000 |
| Jun 19, 2008 | Completed final sign-off Aug 2008 | 701 15th Av | Hubert Penny | work @ unit# 701 & # 705 only. updating fiixtures & finishes in 2 kitchens, 2 bathroom of each / both units.Details
work @ unit# 701 & # 705 only. updating fiixtures & finishes in 2 kitchens, 2 bathroom of each / both units. | $22,000 |
| Oct 4, 2005 | Never finaled issued Oct 2005, no final | 701 15th Av | streetspaceDetails
streetspace |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Hubert Penny (2), Nielsen Aire Construction (2), Ward-Tek Inc., Westech Roofing Co
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.