Nelson Jameson Construction Inc
- Based in
- San Mateo
- On San Francisco permits
- Mar 2010 to Sep 2026
- Last 24 months
- 5 permits filed
59 permits since 2000: 45 completed, 3 in progress, 7 never finaled, 4 expired or cancelled.
Of the 7 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
5 stairs permits: 4 completed, 1 never finaled. Typically 7 days from filing to permit and 134 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 10, 2017 | Completed final sign-off Oct 2017 | 917 Bush St | 1/f: barrier removal: construction of restroom; single user, construct stair.Details
1/f: barrier removal: construction of restroom; single user, construct stair. | |
| Feb 24, 2016 | Completed final sign-off Sep 2016 | 267 08th St | revision to app#201509116757(convert occupied mezzanine level to unoccupied storage space by removing stair. n/a for maherDetails
revision to app#201509116757(convert occupied mezzanine level to unoccupied storage space by removing stair. n/a for maher | |
| Nov 23, 2015 | Completed final sign-off Jun 2016 | 560 03rd St | barrier removal of demo partitions & finishes, new accessible toilet rooms, new compliant millwork, new stairs & handrails, new walkway connecting two areas of 2nd floor. deferred mep. new finishesDetails
barrier removal of demo partitions & finishes, new accessible toilet rooms, new compliant millwork, new stairs & handrails, new walkway connecting two areas of 2nd floor. deferred mep. new finishes | $44,000 |
| Aug 13, 2014 | Completed final sign-off Oct 2014 | 69 Douglass St | kitchen remodel, new kitchen lighting, new door opening in load bearing wall, new spiral stair with oepning in floor structure to accomodate stair.Details
kitchen remodel, new kitchen lighting, new door opening in load bearing wall, new spiral stair with oepning in floor structure to accomodate stair. | $20,000 |
| Apr 11, 2013 | Never finaled issued Apr 2013, no final | 893 Folsom St | t.i-demolish part of (e) mezzanine fl, new walls at mezzanine & stairs. new handrails at stairs. repair & replace gypsum board. new finish floor at mezzanine, stairs & foyer. upgrade electrical. no exterior workDetails
t.i-demolish part of (e) mezzanine fl, new walls at mezzanine & stairs. new handrails at stairs. repair & replace gypsum board. new finish floor at mezzanine, stairs & foyer. upgrade electrical. no exterior work | $65,000 |