Back to kitchen remodel contractors
Nelson Jameson Construction Inc
- Based in
- San Mateo
- On San Francisco permits
- Mar 2010 to Sep 2026
- Last 24 months
- 5 permits filed
59 permits since 2000: 45 completed, 3 in progress, 7 never finaled, 4 expired or cancelled.
Of the 7 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 5 completed, 2 in progress. Typically 43 days from filing to permit and 90 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 18, 2026 | In progress issued Sep 2026 | 634 12th Av | kitchen, remove (e) and replace w/ (n) in same location new cabinets, new plumbing, new light fixtures. primary bathroom, remove all (e) and replace (n) relocation of plumbing. guest bathroom remove (e) and replace w/ (n).Details
kitchen, remove (e) and replace w/ (n) in same location new cabinets, new plumbing, new light fixtures. primary bathroom, remove all (e) and replace (n) relocation of plumbing. guest bathroom remove (e) and replace w/ (n). | $32,000 |
| Jun 17, 2026 | In progress issued Jul 2026 | 3401 Mission St | build ramp, demolish 1 bathroom, 1 kitchen and a couple of walls.Details
build ramp, demolish 1 bathroom, 1 kitchen and a couple of walls. | $107,240 |
| Apr 13, 2023 | Completed final sign-off Aug 2024 | 933 Treat Av | demo interior non structural partitions. remodel two (e) restrooms, add two new restrooms, remodel (e) kitchenette/breakroom, create interior entry hall.Details
demo interior non structural partitions. remodel two (e) restrooms, add two new restrooms, remodel (e) kitchenette/breakroom, create interior entry hall. | $120,000 |
| Oct 13, 2020 | Completed final sign-off Dec 2020 | 360 Baltimore Wy | kitchen renovation, replace with new cabinet, new counters lighting and plumbing. renovation of 2 bathrooms, new shower,new fixtures. all exterior and interior paintingDetails
kitchen renovation, replace with new cabinet, new counters lighting and plumbing. renovation of 2 bathrooms, new shower,new fixtures. all exterior and interior painting | $20,000 |
| Mar 13, 2020 | Completed final sign-off Apr 2023 | 15 Massasoit St | comply with nov 201907211 legalize ground floor rooms: bedroom, living room, full bath, and kitchenette.Details
comply with nov 201907211 legalize ground floor rooms: bedroom, living room, full bath, and kitchenette. | |
| Aug 13, 2014 | Completed final sign-off Oct 2014 | 69 Douglass St | kitchen remodel, new kitchen lighting, new door opening in load bearing wall, new spiral stair with oepning in floor structure to accomodate stair.Details
kitchen remodel, new kitchen lighting, new door opening in load bearing wall, new spiral stair with oepning in floor structure to accomodate stair. | $20,000 |
| Nov 17, 2010 | Completed final sign-off Jun 2011 | 443 Valencia St | change of use: from office to new specialty food, self service. new kitchen & new restroom.Details
change of use: from office to new specialty food, self service. new kitchen & new restroom. | $30,000 |