Back to bathroom remodel contractors
Nelson Jameson Construction Inc
- Based in
- San Mateo
- On San Francisco permits
- Mar 2010 to Sep 2026
- Last 24 months
- 5 permits filed
59 permits since 2000: 45 completed, 3 in progress, 7 never finaled, 4 expired or cancelled.
Of the 7 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
7 bathroom remodel permits: 4 completed, 2 in progress, 1 expired or cancelled. Typically 43 days from filing to permit and 84 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 18, 2026 | In progress issued Sep 2026 | 634 12th Av | kitchen, remove (e) and replace w/ (n) in same location new cabinets, new plumbing, new light fixtures. primary bathroom, remove all (e) and replace (n) relocation of plumbing. guest bathroom remove (e) and replace w/ (n).Details
kitchen, remove (e) and replace w/ (n) in same location new cabinets, new plumbing, new light fixtures. primary bathroom, remove all (e) and replace (n) relocation of plumbing. guest bathroom remove (e) and replace w/ (n). | $32,000 |
| Jun 17, 2026 | In progress issued Jul 2026 | 3401 Mission St | build ramp, demolish 1 bathroom, 1 kitchen and a couple of walls.Details
build ramp, demolish 1 bathroom, 1 kitchen and a couple of walls. | $107,240 |
| Oct 13, 2020 | Completed final sign-off Dec 2020 | 360 Baltimore Wy | kitchen renovation, replace with new cabinet, new counters lighting and plumbing. renovation of 2 bathrooms, new shower,new fixtures. all exterior and interior paintingDetails
kitchen renovation, replace with new cabinet, new counters lighting and plumbing. renovation of 2 bathrooms, new shower,new fixtures. all exterior and interior painting | $20,000 |
| Mar 13, 2020 | Completed final sign-off Apr 2023 | 15 Massasoit St | comply with nov 201907211 legalize ground floor rooms: bedroom, living room, full bath, and kitchenette.Details
comply with nov 201907211 legalize ground floor rooms: bedroom, living room, full bath, and kitchenette. | |
| Sep 28, 2018 | Expired or cancelled expired Apr 2022 | 2170 Folsom St | legalize (e) light mfg. & arts use for ground fl & 2nd fl. to comply w/ planning enf 2016-0097. work to include improvement to exit/egress @ ground fl. (n) ada bathroom @ ground fl & the permitting of a pedestrian walkway bridge connecting 2150 to 2170 folsom st.Details
legalize (e) light mfg. & arts use for ground fl & 2nd fl. to comply w/ planning enf 2016-0097. work to include improvement to exit/egress @ ground fl. (n) ada bathroom @ ground fl & the permitting of a pedestrian walkway bridge connecting 2150 to 2170 folsom st. | $30,000 |
| Nov 23, 2010 | Completed final sign-off Oct 2011 | 499 Castro St | converting retail to specialty food, self-service. remodel/upgrade ada bathroom, new service counter, non-bearing partition, misc electrical & plumbing.Details
converting retail to specialty food, self-service. remodel/upgrade ada bathroom, new service counter, non-bearing partition, misc electrical & plumbing. | $45,000 |
| Mar 10, 2010 | Completed final sign-off Apr 2010 | 1960 Harrison St | t.i. to (e) book binding warehouse to split it into two uses, one part will remain as book binding, the new one will be a taekwondo gym. work to include (n) interior non struc. partitions & bathroom remodel. no changes to struc. no changes to facade except addition of 1 door req'd for exiting @rearDetails
t.i. to (e) book binding warehouse to split it into two uses, one part will remain as book binding, the new one will be a taekwondo gym. work to include (n) interior non struc. partitions & bathroom remodel. no changes to struc. no changes to facade except addition of 1 door req'd for exiting @rear | $20,000 |