Block 3752, lot 079
893 Folsom St
- City’s use
- Industrial
- Built
- 1925
- Stories
- 2
- Rooms
- 5 bathrooms
- Building
- 9,642 sq ft
- Lot
- 8,563 sq ft
- Zoning
- RSD
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
11 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 17, 2021 | Expired or cancelled cancelled Jan 2026 | 893 Folsom St | change of use for entire building, to seperate 3 suites for entire building.Details
change of use for entire building, to seperate 3 suites for entire building. | $5,000 | |
| Aug 23, 2019 | Expired or cancelled cancelled Jan 2026 | 893 Folsom St | new accessible lift near entry. 2 new private office on 1st floor. accessiblity upgrade of 2 extg restroom. accessibility upgrade of 2 extg restroom. new break room area. 2 new conferance room. n/a for maherDetails
new accessible lift near entry. 2 new private office on 1st floor. accessiblity upgrade of 2 extg restroom. accessibility upgrade of 2 extg restroom. new break room area. 2 new conferance room. n/a for maher | $124,763 | |
| Jun 14, 2019 | Never finaled issued Jun 2019, no final | 893 Folsom St | Bhogal Brothers Construction Inc | soft demolition for tenant improvement.Details
soft demolition for tenant improvement. | $3,000 |
| Aug 1, 2016 | Never finaled issued Aug 2016, no final | 893 Folsom St | street space permit (pp20160801628)Details
street space permit (pp20160801628) | ||
| May 9, 2013 | Never finaled issued May 2013, no final | 893 Folsom St | Nelson Jameson Construction Inc | revision to appl #2013.04.11.4339 & 2013.04.16.4710 - renive 1-hr partition form permit drawings between office & filing area per cbc section 508.3 & table 508.4, required separation of occupancies; no separation required between office & filing area.Details
revision to appl #2013.04.11.4339 & 2013.04.16.4710 - renive 1-hr partition form permit drawings between office & filing area per cbc section 508.3 & table 508.4, required separation of occupancies; no separation required between office & filing area. | |
| Apr 16, 2013 | Never finaled issued Apr 2013, no final | 893 Folsom St | Nelson Jameson Construction Inc | revision to existing pa# 201304114339. add leveling slab over existing sloped floor at stroage area. increase area to remain at mezz floor. minor adjustment to storage and hall width. future 1 hour barrier per table 508.2.5 sfbc 2010, under separate permitDetails
revision to existing pa# 201304114339. add leveling slab over existing sloped floor at stroage area. increase area to remain at mezz floor. minor adjustment to storage and hall width. future 1 hour barrier per table 508.2.5 sfbc 2010, under separate permit | $8,000 |
| Apr 11, 2013 | Never finaled issued Apr 2013, no final | 893 Folsom St | Nelson Jameson Construction Inc | t.i-demolish part of (e) mezzanine fl, new walls at mezzanine & stairs. new handrails at stairs. repair & replace gypsum board. new finish floor at mezzanine, stairs & foyer. upgrade electrical. no exterior workDetails
t.i-demolish part of (e) mezzanine fl, new walls at mezzanine & stairs. new handrails at stairs. repair & replace gypsum board. new finish floor at mezzanine, stairs & foyer. upgrade electrical. no exterior work | $65,000 |
| Nov 2, 2012 | Never finaled issued Jan 2013, no final | 893 Folsom St | unit #a:install 1 36" w x 96" h blad sign to bldg wall using anchor bolts.Details
unit #a:install 1 36" w x 96" h blad sign to bldg wall using anchor bolts. | $200 | |
| Dec 8, 2011 | Completed final sign-off Dec 2011 | 893 Folsom St | correction of occupancy from a2 to b. revision to pa #201112019906 to clarify actual occupancy.Details
correction of occupancy from a2 to b. revision to pa #201112019906 to clarify actual occupancy. | ||
| Dec 1, 2011 | Completed final sign-off Dec 2011 | 893 Folsom St | revision to app#201009281765.garage door to remain operable, not closed as per plan. extg curb-cut to remain.Details
revision to app#201009281765.garage door to remain operable, not closed as per plan. extg curb-cut to remain. | ||
| Sep 28, 2010 | Completed final sign-off Dec 2011 | 893 Folsom St | Harris Bertram | apt a - barrier removal-accessible entrance, accessible restrooms, misc casework & cabinets, plumbing & electrical improvements. window replacement, door replacement.Details
apt a - barrier removal-accessible entrance, accessible restrooms, misc casework & cabinets, plumbing & electrical improvements. window replacement, door replacement. | $30,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Nelson Jameson Construction Inc (3), Bhogal Brothers Construction Inc, Harris Bertram
- Architects
- Gisela Schmoll (3), Maxwell Beamont
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.