Narrowback Construction Co.
- Based in
- San Francisco
- On San Francisco permits
- May 2000 to Nov 2020
- Last 24 months
- 0 permits filed
351 permits since 2000: 255 completed, 50 never finaled, 46 expired or cancelled.
Of the 50 never-finaled permits, 16 are 5 to 10 years old, 34 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
28 kitchen remodel permits: 23 completed, 5 expired or cancelled. Typically 14 days from filing to permit and 229 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 26, 2019 | Completed final sign-off May 2021 | 1326 Dolores St | renovation of (e) unit within a 2-story family house, no change to bldg envelope, to include: remodeled kitchen, bathrooms and bedrooms- replace (e) windows w/new to match, plm/ele and structural as neededDetails
renovation of (e) unit within a 2-story family house, no change to bldg envelope, to include: remodeled kitchen, bathrooms and bedrooms- replace (e) windows w/new to match, plm/ele and structural as needed | $129,000 |
| Nov 14, 2018 | Completed final sign-off Jan 2021 | 1328 Dolores St | renovation of upper unit to include master bedroom & bath, den bath/laundry, kitchen dinning (e) windows to match, plumbing, electrical, structural as requiredDetails
renovation of upper unit to include master bedroom & bath, den bath/laundry, kitchen dinning (e) windows to match, plumbing, electrical, structural as required | $95,000 |
| Jun 15, 2018 | Completed final sign-off Dec 2020 | 89 Forest Side Av | horizontal side addition (63.21 sq ft), kitchen remodel, front porch in kind replacement, garage door& driveway widening, stucco & window in kind replacement at front elevation, (e) pop out (@ kitchen) side, wall will be moved to be 3' clear of side setback. interior remodel.Details
horizontal side addition (63.21 sq ft), kitchen remodel, front porch in kind replacement, garage door& driveway widening, stucco & window in kind replacement at front elevation, (e) pop out (@ kitchen) side, wall will be moved to be 3' clear of side setback. interior remodel. | $95,000 |
| Apr 5, 2018 | Completed final sign-off Sep 2020 | 4307 20th St | interior remodel from ground flr to 3rd flr. replacement of existing windows throughout front facade. replacing railing at front porch and stair leading from sidewalk to match wood bannister. interior remodel including new interior stair, 3 bath remodels, expand kitchen and livingspaceDetails
interior remodel from ground flr to 3rd flr. replacement of existing windows throughout front facade. replacing railing at front porch and stair leading from sidewalk to match wood bannister. interior remodel including new interior stair, 3 bath remodels, expand kitchen and livingspace | $305,000 |
| Mar 23, 2018 | Completed final sign-off Jul 2019 | 2646 San Bruno Av | g/f -tenant improvement to existing restaurant space with new mep work and minor changes for kitchen layout. ref to 201411012847 on 1st ffr per plan. no exterior work.Details
g/f -tenant improvement to existing restaurant space with new mep work and minor changes for kitchen layout. ref to 201411012847 on 1st ffr per plan. no exterior work. | $150,000 |
| Mar 15, 2018 | Completed final sign-off May 2018 | 222 Eureka St | remove (e) kitchen cabinets, open walls as needed for new electric plugs & switches, re plumbing kitchen sink patch drywal las needed, instal new cabinets, refinish (e) wood floors, replace counter, new kitchen appliances no structural work, walls to remain, lighting comply w/cec 1500k, roughlyDetails
remove (e) kitchen cabinets, open walls as needed for new electric plugs & switches, re plumbing kitchen sink patch drywal las needed, instal new cabinets, refinish (e) wood floors, replace counter, new kitchen appliances no structural work, walls to remain, lighting comply w/cec 1500k, roughly | $25,000 |
| Mar 13, 2018 | Completed final sign-off Nov 2018 | 611 Washington St | unit 2205: remodel kitchen, new surface mount led lights to replace incandescents, new wood flooring, no new plumbing except new kitchen faucet to replace old kitchen faucet; n/a maherDetails
unit 2205: remodel kitchen, new surface mount led lights to replace incandescents, new wood flooring, no new plumbing except new kitchen faucet to replace old kitchen faucet; n/a maher | $45,000 |
| Feb 20, 2018 | Completed final sign-off Aug 2018 | 617 Arguello Bl | unit #5: remodel (e) kitchen cabs. replace with new cabs in same location. remodel (e) bath fixtures. install new bath fixtures and tile. plumbling locations same . remove (e) rotted t111 wood plywood siding. install new sheathing membrane and new wood plywood siding. repair/replace interiorDetails
unit #5: remodel (e) kitchen cabs. replace with new cabs in same location. remodel (e) bath fixtures. install new bath fixtures and tile. plumbling locations same . remove (e) rotted t111 wood plywood siding. install new sheathing membrane and new wood plywood siding. repair/replace interior | $35,000 |
| Sep 26, 2017 | Completed final sign-off Sep 2018 | 75 14th St | rev. to bpa# 201609066864. relocate egress corridor reconfigure bathroom and kitchenette and replace 1 existing solid core door with glazed door, new glazed egress door, new glazed roll up door mep deferred; n/a maherDetails
rev. to bpa# 201609066864. relocate egress corridor reconfigure bathroom and kitchenette and replace 1 existing solid core door with glazed door, new glazed egress door, new glazed roll up door mep deferred; n/a maher | $10,000 |
| Jul 12, 2017 | Completed final sign-off Apr 2018 | 176 Nevada St | int. renovation of (e) kitchen. replacement of (e) skylight and windows in kitchen.Details
int. renovation of (e) kitchen. replacement of (e) skylight and windows in kitchen. | $10,000 |
| Jan 13, 2017 | Completed final sign-off Jan 2018 | 101 Townsend St | t.i for change to cafe use. hvac works inclued tied into (e) building system. new commercial cafe t.i. to include new air handler, new restroom, electrical & plumbing. cabinets & kitchen equipment. ** maher: n/a **Details
t.i for change to cafe use. hvac works inclued tied into (e) building system. new commercial cafe t.i. to include new air handler, new restroom, electrical & plumbing. cabinets & kitchen equipment. ** maher: n/a ** | $175,000 |
| Dec 29, 2016 | Completed final sign-off Oct 2017 | 300 Connecticut St | renovate restaurant kitchen and dining area, disabled access upgrades, no exterior changes, mech & elec under separate permit.Details
renovate restaurant kitchen and dining area, disabled access upgrades, no exterior changes, mech & elec under separate permit. | $130,000 |
| Aug 22, 2016 | Completed final sign-off Nov 2016 | 123 Corwin St | demo e kitchen cabinets provide & install new, replace counter top fixture at same location, demo (e) master bathm install new fixtures same location, install (n) tile at floor & shower, demo 3 (e) windows at rear, install new marvin integrity windows, max u facor .032Details
demo e kitchen cabinets provide & install new, replace counter top fixture at same location, demo (e) master bathm install new fixtures same location, install (n) tile at floor & shower, demo 3 (e) windows at rear, install new marvin integrity windows, max u facor .032 | $35,000 |
| Jul 5, 2016 | Completed final sign-off May 2017 | 112 Commonwealth Av | new exterior stucco, new roof, some new windows (front & side of bldg) & two new doors (rear of bldg), a remodeled kitchen, family room & master bedroom.Details
new exterior stucco, new roof, some new windows (front & side of bldg) & two new doors (rear of bldg), a remodeled kitchen, family room & master bedroom. | $68,000 |
| Jun 28, 2016 | Completed final sign-off Oct 2016 | 565 Pennsylvania Av | remove (e) cabinets, open as needed non bearing wall between kitchen and living room, add plugs, install new sheetrock as needed, install new cabinets and counter, new kitchen sink.Details
remove (e) cabinets, open as needed non bearing wall between kitchen and living room, add plugs, install new sheetrock as needed, install new cabinets and counter, new kitchen sink. | $15,000 |
| May 17, 2016 | Completed final sign-off Apr 2018 | 48 Gold St | tenant improvement of (e) 1st, 2nd & 3rd level office space addition. inclding a new bathroom & 2 kitchenettes serving the office spaces.Details
tenant improvement of (e) 1st, 2nd & 3rd level office space addition. inclding a new bathroom & 2 kitchenettes serving the office spaces. | $1,300,000 |
| May 6, 2015 | Completed final sign-off Dec 2015 | 933 20th St | commercial space alterations, new interior partition walls, interior windows, doors, ada shower and kitchenette, new window in e rough opening to restore to originalDetails
commercial space alterations, new interior partition walls, interior windows, doors, ada shower and kitchenette, new window in e rough opening to restore to original | $85,000 |
| Mar 23, 2015 | Completed final sign-off Sep 2016 | 76 06th Av | 1st flr: add new interior stair from (garage lvl)to 2nd flr,excavate for 7'-6"head ht at new heated spaces at 1st flr;2nd flr:remodel kitchen,replace 2 broken brick fireplaces w/decorative gas appliance,infill 2 windows @(e)lightwell.3rd flr: add new egress window,remodel bath 2 and 3 to laundry rmDetails
1st flr: add new interior stair from (garage lvl)to 2nd flr,excavate for 7'-6"head ht at new heated spaces at 1st flr;2nd flr:remodel kitchen,replace 2 broken brick fireplaces w/decorative gas appliance,infill 2 windows @(e)lightwell.3rd flr: add new egress window,remodel bath 2 and 3 to laundry rm | $150,000 |
| Jul 1, 2014 | Completed final sign-off Jul 2017 | 5322 California St | horizontal addition at rear of property. new roof deck at level 2. interior remodel at kitchen/bath at level 2. interior remodel and new stair at level 1. repair of dry rot at entry stair.Details
horizontal addition at rear of property. new roof deck at level 2. interior remodel at kitchen/bath at level 2. interior remodel and new stair at level 1. repair of dry rot at entry stair. | $200,000 |
| Jun 11, 2012 | Expired or cancelled expired Jun 2014 | 434 Greenwich St | remove one old kitchen cabinets, install new cabs and counter top. 6 linear ft. no structural work.Details
remove one old kitchen cabinets, install new cabs and counter top. 6 linear ft. no structural work. | $10,000 |
| Feb 10, 2012 | Completed final sign-off Nov 2012 | 316 Maple St | demo (6) existing bathrooms - replace drywall, and all electrical, plumbing fixtures. replace tile. no structural work. demo (5) existing kitchens - replace dry wall and all electric and plumbing fixtures. replace new cabinets. - no structural work.Details
demo (6) existing bathrooms - replace drywall, and all electrical, plumbing fixtures. replace tile. no structural work. demo (5) existing kitchens - replace dry wall and all electric and plumbing fixtures. replace new cabinets. - no structural work. | $40,000 |
| May 6, 2011 | Expired or cancelled expired Jun 2014 | 961 Union St | revision to pa# 2010-1206-6145-revison to structural repairs at front bay windows. change in general contractor for project of record. correction to (e) architectural floor plan. bath & kitchen locations correctly located per attached drawingsDetails
revision to pa# 2010-1206-6145-revison to structural repairs at front bay windows. change in general contractor for project of record. correction to (e) architectural floor plan. bath & kitchen locations correctly located per attached drawings | |
| Nov 15, 2010 | Completed final sign-off Nov 2011 | 447 Battery St | new wine bar with prep kitchen. rebuild exterior deck. hvac under sep permit. sidewalk work under separate permit.Details
new wine bar with prep kitchen. rebuild exterior deck. hvac under sep permit. sidewalk work under separate permit. | $150,000 |
| Apr 13, 2010 | Completed final sign-off Dec 2010 | 35 Santa Clara Av | install new kitchen cabinets and appliances. upgrade elec and plumbing. remove and replace fixtures for 3 baths. add 1 bath at master bedroomDetails
install new kitchen cabinets and appliances. upgrade elec and plumbing. remove and replace fixtures for 3 baths. add 1 bath at master bedroom | $60,000 |
| Dec 20, 2004 | Completed final sign-off Sep 2019 | 1459 11th Av | reconfiguring the kitchens, relocating interior door & reconfiguring the interior layouts of thisDetails
reconfiguring the kitchens, relocating interior door & reconfiguring the interior layouts of this | $60,000 |
| Jun 11, 2001 | Expired or cancelled expired Jun 2002 | 3146 Lyon St | remodel of kitchen and bathroom enlarge doorwy from kitchen to dining roomDetails
remodel of kitchen and bathroom enlarge doorwy from kitchen to dining room | $30,000 |
| Aug 9, 2000 | Expired or cancelled expired Dec 2000 | 825 Ashbury St | remove water damaged plaster bathroom and kitchen, new sheetrock unit # 4 , complaint # 200000869Details
remove water damaged plaster bathroom and kitchen, new sheetrock unit # 4 , complaint # 200000869 | $1,000 |
| May 16, 2000 | Expired or cancelled expired Nov 2001 | 4331 18th St | horizontal additioin: new dormer, new kitchen & baths; new windows, restore front facadeDetails
horizontal additioin: new dormer, new kitchen & baths; new windows, restore front facade | $80,000 |