Back to bathroom remodel contractors
Narrowback Construction Co.
- Based in
- San Francisco
- On San Francisco permits
- May 2000 to Nov 2020
- Last 24 months
- 0 permits filed
351 permits since 2000: 255 completed, 50 never finaled, 46 expired or cancelled.
Of the 50 never-finaled permits, 16 are 5 to 10 years old, 34 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
40 bathroom remodel permits: 32 completed, 3 never finaled, 5 expired or cancelled. Typically 14 days from filing to permit and 268 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 14, 2019 | Completed final sign-off Nov 2019 | 802 Arguello Bl | revision to 201812178517. remodel bathrooms on 3rd and 4th flDetails
revision to 201812178517. remodel bathrooms on 3rd and 4th fl | $10,000 |
| Apr 26, 2019 | Completed final sign-off May 2021 | 1326 Dolores St | renovation of (e) unit within a 2-story family house, no change to bldg envelope, to include: remodeled kitchen, bathrooms and bedrooms- replace (e) windows w/new to match, plm/ele and structural as neededDetails
renovation of (e) unit within a 2-story family house, no change to bldg envelope, to include: remodeled kitchen, bathrooms and bedrooms- replace (e) windows w/new to match, plm/ele and structural as needed | $129,000 |
| Nov 14, 2018 | Completed final sign-off Jan 2021 | 1328 Dolores St | renovation of upper unit to include master bedroom & bath, den bath/laundry, kitchen dinning (e) windows to match, plumbing, electrical, structural as requiredDetails
renovation of upper unit to include master bedroom & bath, den bath/laundry, kitchen dinning (e) windows to match, plumbing, electrical, structural as required | $95,000 |
| Oct 29, 2018 | Never finaled issued Nov 2018, no final | 933 20th St | construct 2 doors at openings on the ground and mezzanine levels. upgrafe ada signage at accessible bathrooms and restripe stairsDetails
construct 2 doors at openings on the ground and mezzanine levels. upgrafe ada signage at accessible bathrooms and restripe stairs | $3,000 |
| Apr 30, 2018 | Completed final sign-off Oct 2018 | 125 Alpine Tr | renovation of extg master bathroom. no addition to extg house.Details
renovation of extg master bathroom. no addition to extg house. | $18,666 |
| Apr 24, 2018 | Completed final sign-off Mar 2019 | 61 Manchester St | new recessed entry & door. new basement window opening. new structural slab and voluntary seismic upgrades. 1 new bathroom, & 2 new bedrooms at extg finished basement. new windows and dry rot repair at rear. new front windows in kind.siding replacement/dry rot repairDetails
new recessed entry & door. new basement window opening. new structural slab and voluntary seismic upgrades. 1 new bathroom, & 2 new bedrooms at extg finished basement. new windows and dry rot repair at rear. new front windows in kind.siding replacement/dry rot repair | $62,500 |
| Apr 5, 2018 | Completed final sign-off Sep 2020 | 4307 20th St | interior remodel from ground flr to 3rd flr. replacement of existing windows throughout front facade. replacing railing at front porch and stair leading from sidewalk to match wood bannister. interior remodel including new interior stair, 3 bath remodels, expand kitchen and livingspaceDetails
interior remodel from ground flr to 3rd flr. replacement of existing windows throughout front facade. replacing railing at front porch and stair leading from sidewalk to match wood bannister. interior remodel including new interior stair, 3 bath remodels, expand kitchen and livingspace | $305,000 |
| Feb 20, 2018 | Completed final sign-off Aug 2018 | 617 Arguello Bl | unit #5: remodel (e) kitchen cabs. replace with new cabs in same location. remodel (e) bath fixtures. install new bath fixtures and tile. plumbling locations same . remove (e) rotted t111 wood plywood siding. install new sheathing membrane and new wood plywood siding. repair/replace interiorDetails
unit #5: remodel (e) kitchen cabs. replace with new cabs in same location. remodel (e) bath fixtures. install new bath fixtures and tile. plumbling locations same . remove (e) rotted t111 wood plywood siding. install new sheathing membrane and new wood plywood siding. repair/replace interior | $35,000 |
| Feb 9, 2018 | Completed final sign-off Nov 2018 | 101 Townsend St | create (3) communicating opening on a shared wall between 101 & 111 townsend st at 1st, 2nd & 3rd foors. add 1 gender neutral bathroom @ 101 townsendDetails
create (3) communicating opening on a shared wall between 101 & 111 townsend st at 1st, 2nd & 3rd foors. add 1 gender neutral bathroom @ 101 townsend | $60,000 |
| Sep 26, 2017 | Completed final sign-off Sep 2018 | 75 14th St | rev. to bpa# 201609066864. relocate egress corridor reconfigure bathroom and kitchenette and replace 1 existing solid core door with glazed door, new glazed egress door, new glazed roll up door mep deferred; n/a maherDetails
rev. to bpa# 201609066864. relocate egress corridor reconfigure bathroom and kitchenette and replace 1 existing solid core door with glazed door, new glazed egress door, new glazed roll up door mep deferred; n/a maher | $10,000 |
| Nov 28, 2016 | Completed final sign-off Jan 2018 | 969 Page St | remodel bathroom at 2nd floor. add bay window. not visible fromDetails
remodel bathroom at 2nd floor. add bay window. not visible from | $25,000 |
| Aug 19, 2016 | Expired or cancelled cancelled Jan 2026 | 1077 Post St | remodel of commercial space to include interior/removal of non load bearing partitions, new ada bathroom, removal of door to meet code. maher naDetails
remodel of commercial space to include interior/removal of non load bearing partitions, new ada bathroom, removal of door to meet code. maher na | $31,000 |
| Jun 28, 2016 | Completed final sign-off Mar 2017 | 917 Lake St | remodel 2 bathrooms, 1 guest bath, 1 master bath. demo interior shetrock only, no structural work, dry wall as needed, new tile, new electric, new plumbing fixtures.Details
remodel 2 bathrooms, 1 guest bath, 1 master bath. demo interior shetrock only, no structural work, dry wall as needed, new tile, new electric, new plumbing fixtures. | $30,000 |
| May 17, 2016 | Completed final sign-off Apr 2018 | 48 Gold St | tenant improvement of (e) 1st, 2nd & 3rd level office space addition. inclding a new bathroom & 2 kitchenettes serving the office spaces.Details
tenant improvement of (e) 1st, 2nd & 3rd level office space addition. inclding a new bathroom & 2 kitchenettes serving the office spaces. | $1,300,000 |
| Oct 20, 2015 | Completed final sign-off Apr 2016 | 95 Minna St | 3rd flr: ti - ada upgrades @ bathroom and breakroom and add 1 conference room. mech & elec under sep permit. maher naDetails
3rd flr: ti - ada upgrades @ bathroom and breakroom and add 1 conference room. mech & elec under sep permit. maher na | $30,000 |
| Sep 29, 2015 | Completed final sign-off Apr 2018 | 3020 Clay St | horizontal addition. renovation addtion master bedroom, interior deck & master bath to become part of master bedrm. part of master bedrm into closets. 3rd fl to horizontal addition is covered w/ deck and rebuilt to code compliant stair & spiral stair is rebuilt to replace external stair case.Details
horizontal addition. renovation addtion master bedroom, interior deck & master bath to become part of master bedrm. part of master bedrm into closets. 3rd fl to horizontal addition is covered w/ deck and rebuilt to code compliant stair & spiral stair is rebuilt to replace external stair case. | $53,367 |
| Sep 4, 2015 | Completed final sign-off Jan 2016 | 269 Potrero Av | ground flr: ti - (partitions, add breakroom, add bathroom, no change to exterior) mep deferredDetails
ground flr: ti - (partitions, add breakroom, add bathroom, no change to exterior) mep deferred | $150,000 |
| Jul 21, 2015 | Completed final sign-off Aug 2016 | 133 02nd St | 1) t.i. at 2nd floor: ada upgrade at bathroom and break room. 2) mechanical and electrical under seperate permits. n/a for maher.Details
1) t.i. at 2nd floor: ada upgrade at bathroom and break room. 2) mechanical and electrical under seperate permits. n/a for maher. | $10,000 |
| Jul 17, 2015 | Never finaled issued Apr 2016, no final | 76 06th Av | horizontal (rear) addition @ 1st,2nd,3rd flrs. one (n) bathroom @ 3rd flr. some (n) framing, elec, plumbing, as per plan. n/a for maher ordinance.Details
horizontal (rear) addition @ 1st,2nd,3rd flrs. one (n) bathroom @ 3rd flr. some (n) framing, elec, plumbing, as per plan. n/a for maher ordinance. | $93,000 |
| May 27, 2015 | Completed final sign-off Mar 2016 | 3020 Clay St | interior renovation and remodel existing 3 story house. project includess conversion of existing bedroom into bathroom, interior renovation of bedroom 3 and activity room on 3rd fl, remodel bath 2 on 2nd fl. addition of 2 new dormer window&1new skylight in existing roof. renovated house 3 stories w/Details
interior renovation and remodel existing 3 story house. project includess conversion of existing bedroom into bathroom, interior renovation of bedroom 3 and activity room on 3rd fl, remodel bath 2 on 2nd fl. addition of 2 new dormer window&1new skylight in existing roof. renovated house 3 stories w/ | $101,902 |
| Mar 23, 2015 | Completed final sign-off Sep 2016 | 76 06th Av | 1st flr: add new interior stair from (garage lvl)to 2nd flr,excavate for 7'-6"head ht at new heated spaces at 1st flr;2nd flr:remodel kitchen,replace 2 broken brick fireplaces w/decorative gas appliance,infill 2 windows @(e)lightwell.3rd flr: add new egress window,remodel bath 2 and 3 to laundry rmDetails
1st flr: add new interior stair from (garage lvl)to 2nd flr,excavate for 7'-6"head ht at new heated spaces at 1st flr;2nd flr:remodel kitchen,replace 2 broken brick fireplaces w/decorative gas appliance,infill 2 windows @(e)lightwell.3rd flr: add new egress window,remodel bath 2 and 3 to laundry rm | $150,000 |
| Nov 7, 2014 | Completed final sign-off Apr 2015 | 1427 Haight St | soft story upgrade, (per sfbc chapter 34b, fema p-807); one accessible restroom at 1st flr for retail 1429. electrical & mechanical under separate permits for the new unix bathroom.Details
soft story upgrade, (per sfbc chapter 34b, fema p-807); one accessible restroom at 1st flr for retail 1429. electrical & mechanical under separate permits for the new unix bathroom. | $110,050 |
| Jul 1, 2014 | Completed final sign-off Jul 2017 | 5322 California St | horizontal addition at rear of property. new roof deck at level 2. interior remodel at kitchen/bath at level 2. interior remodel and new stair at level 1. repair of dry rot at entry stair.Details
horizontal addition at rear of property. new roof deck at level 2. interior remodel at kitchen/bath at level 2. interior remodel and new stair at level 1. repair of dry rot at entry stair. | $200,000 |
| Jul 11, 2013 | Completed final sign-off Feb 2014 | 370 Townsend St | permit to correct permit applic. #2013-02-07-9682, establishing legal occupancy as retail at groundfloor, with office, warehouse, storage at basement. work includes (n) bathrooms on groundfloor, (n) 2nd exit at street and rated stair enclosure.Details
permit to correct permit applic. #2013-02-07-9682, establishing legal occupancy as retail at groundfloor, with office, warehouse, storage at basement. work includes (n) bathrooms on groundfloor, (n) 2nd exit at street and rated stair enclosure. | |
| Feb 7, 2013 | Completed final sign-off Feb 2014 | 370 Townsend St | establish legal occupancy as retail at ground floor, with warehouse/storage (no furniture) at basement and mezzanine.work includes new bathrooms on ground floor, new 2nd exit at street and rated stair enclosure.Details
establish legal occupancy as retail at ground floor, with warehouse/storage (no furniture) at basement and mezzanine.work includes new bathrooms on ground floor, new 2nd exit at street and rated stair enclosure. | $40,000 |
| Jan 16, 2013 | Completed final sign-off Jan 2015 | 141 Downey St | new code compliant stair, bathroom & vertical addition. new roof deck. new deck at rear of first level. interior remodel.Details
new code compliant stair, bathroom & vertical addition. new roof deck. new deck at rear of first level. interior remodel. | $135,000 |
| Feb 10, 2012 | Completed final sign-off Nov 2012 | 316 Maple St | demo (6) existing bathrooms - replace drywall, and all electrical, plumbing fixtures. replace tile. no structural work. demo (5) existing kitchens - replace dry wall and all electric and plumbing fixtures. replace new cabinets. - no structural work.Details
demo (6) existing bathrooms - replace drywall, and all electrical, plumbing fixtures. replace tile. no structural work. demo (5) existing kitchens - replace dry wall and all electric and plumbing fixtures. replace new cabinets. - no structural work. | $40,000 |
| Aug 16, 2011 | Completed final sign-off Aug 2011 | 4205 24th St | additional work under permit# 201012106484 change fixtures/toilet: lavatory 4 bathrooms.Details
additional work under permit# 201012106484 change fixtures/toilet: lavatory 4 bathrooms. | $2,500 |
| May 6, 2011 | Expired or cancelled expired Jun 2014 | 961 Union St | revision to pa# 2010-1206-6145-revison to structural repairs at front bay windows. change in general contractor for project of record. correction to (e) architectural floor plan. bath & kitchen locations correctly located per attached drawingsDetails
revision to pa# 2010-1206-6145-revison to structural repairs at front bay windows. change in general contractor for project of record. correction to (e) architectural floor plan. bath & kitchen locations correctly located per attached drawings | |
| May 6, 2011 | Never finaled issued Mar 2012, no final | 2526 14th Av | construction phase changes to work presently underway per 2009-08-07-4386: modify layout of bathroom on floor 3, deck on floor 2 and roofline. add mudroom (floor 1), omit 1 skylight, re-size 1 flat skylight, re-size & relocate 1 flatskylight (floor 3), delta 8 is the scope of work under this permit.Details
construction phase changes to work presently underway per 2009-08-07-4386: modify layout of bathroom on floor 3, deck on floor 2 and roofline. add mudroom (floor 1), omit 1 skylight, re-size 1 flat skylight, re-size & relocate 1 flatskylight (floor 3), delta 8 is the scope of work under this permit. | $1,500 |
| Oct 22, 2010 | Completed final sign-off Nov 2012 | 235 Francisco St | exterior addition of bay window at e balcony on the 3rd fl. interior renovation of condominium residence. work to include replacement of fixtures and finishes to e master bath, addition of shower to e powder rm on 3rd fl. move window at 3rd fl powder rmDetails
exterior addition of bay window at e balcony on the 3rd fl. interior renovation of condominium residence. work to include replacement of fixtures and finishes to e master bath, addition of shower to e powder rm on 3rd fl. move window at 3rd fl powder rm | $12,000 |
| Apr 13, 2010 | Completed final sign-off Dec 2010 | 35 Santa Clara Av | install new kitchen cabinets and appliances. upgrade elec and plumbing. remove and replace fixtures for 3 baths. add 1 bath at master bedroomDetails
install new kitchen cabinets and appliances. upgrade elec and plumbing. remove and replace fixtures for 3 baths. add 1 bath at master bedroom | $60,000 |
| Aug 7, 2009 | Completed final sign-off Mar 2012 | 2526 14th Av | residential remodel / expansion. fill in lightwell at 1st & 2nd floor. increase stair width to 3'-0". expand 3rd floor area. site permit application. horizontal addition 3rd floor for bedroom & bath. legalize bath & playroom at 1st floor.Details
residential remodel / expansion. fill in lightwell at 1st & 2nd floor. increase stair width to 3'-0". expand 3rd floor area. site permit application. horizontal addition 3rd floor for bedroom & bath. legalize bath & playroom at 1st floor. | $300,000 |
| Apr 16, 2009 | Completed final sign-off Aug 2009 | 260 Avila St | renovation of (e) bedroom at 1st floor & 2nd floor, addition of new bathroom with new bay window at 1st floor.Details
renovation of (e) bedroom at 1st floor & 2nd floor, addition of new bathroom with new bay window at 1st floor. | $50,000 |
| Feb 2, 2009 | Completed final sign-off Jan 2010 | 717 De Haro St | interior remodel (no change or any work to exterior) to the (e) top floor residence. renovate (e) master bedroom & (e) master bath, convert one (e) bedroom into new master dressing room. renovate (e) study/bedroom. renovate (e) entry hall. install 3 new beams due to the removal of walls.Details
interior remodel (no change or any work to exterior) to the (e) top floor residence. renovate (e) master bedroom & (e) master bath, convert one (e) bedroom into new master dressing room. renovate (e) study/bedroom. renovate (e) entry hall. install 3 new beams due to the removal of walls. | $60,000 |
| Mar 16, 2004 | Completed final sign-off Aug 2004 | 556 14th St | demo (e) damaged tile at shower and floor bathroom, replace tub and toilet at (e) locationDetails
demo (e) damaged tile at shower and floor bathroom, replace tub and toilet at (e) location | $25,000 |
| Dec 23, 2002 | Completed final sign-off Aug 2003 | 562 Sutter St | renovation of (e) tenant space commercial/area 1st floor to meeting room, bathrooms, loungeDetails
renovation of (e) tenant space commercial/area 1st floor to meeting room, bathrooms, lounge | $100,000 |
| Jun 11, 2001 | Expired or cancelled expired Jun 2002 | 3146 Lyon St | remodel of kitchen and bathroom enlarge doorwy from kitchen to dining roomDetails
remodel of kitchen and bathroom enlarge doorwy from kitchen to dining room | $30,000 |
| Aug 9, 2000 | Expired or cancelled expired Dec 2000 | 825 Ashbury St | remove water damaged plaster bathroom and kitchen, new sheetrock unit # 4 , complaint # 200000869Details
remove water damaged plaster bathroom and kitchen, new sheetrock unit # 4 , complaint # 200000869 | $1,000 |
| May 16, 2000 | Expired or cancelled expired Nov 2001 | 4331 18th St | horizontal additioin: new dormer, new kitchen & baths; new windows, restore front facadeDetails
horizontal additioin: new dormer, new kitchen & baths; new windows, restore front facade | $80,000 |