Permit GraphShortlistSan Francisco building permits since 2000

Narrowback Construction Co.

Contractor license
579655
State license record
Based in
San Francisco
On San Francisco permits
May 2000 to Nov 2020
Last 24 months
0 permits filed

351 permits since 2000: 255 completed, 50 never finaled, 46 expired or cancelled.

Of the 50 never-finaled permits, 16 are 5 to 10 years old, 34 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Deck permits

AllRoof deck 8Deck 15Stairs 36Kitchen remodel 28Bathroom remodel 40

15 deck permits: 11 completed, 2 never finaled, 2 expired or cancelled. Typically 181 days from filing to permit and 419 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Mar 16, 2018Completed
final sign-off Sep 2020
4309 20th Stconversion of exterior 3rd fl rear site permit. yard (south) deck to interior living space & removal of stair to rear yard. (n) cantilever deck & exterior spiral staircase @ 3rd fl rear facade. no overall increase in bldg depth or height.
Details
Permit
201803163897
Status
complete
Filed
Mar 16, 2018
Permit issued
Apr 1, 2019
Final sign-off
Sep 28, 2020
Declared cost
$56,000
Address
4309 20th St

conversion of exterior 3rd fl rear site permit. yard (south) deck to interior living space & removal of stair to rear yard. (n) cantilever deck & exterior spiral staircase @ 3rd fl rear facade. no overall increase in bldg depth or height.

Open the permit page

$56,000
Sep 9, 2016Completed
final sign-off Nov 2016
121 Chicago Wyrepair/replace post and railing on existing front deck in kind wood replacement; less than 50% of porch; voluntary bolt-down to foundation, anchors thru (n02x6 ptdf pressure blocking with 2 nails to (e) sill.
Details
Permit
201609097273
Status
complete
Filed
Sep 9, 2016
Permit issued
Sep 9, 2016
Final sign-off
Nov 14, 2016
Declared cost
$9,400
Address
121 Chicago Wy

repair/replace post and railing on existing front deck in kind wood replacement; less than 50% of porch; voluntary bolt-down to foundation, anchors thru (n02x6 ptdf pressure blocking with 2 nails to (e) sill.

Open the permit page

$9,400
Jul 8, 2016Completed
final sign-off Dec 2017
101 Townsend Stconstruction of new side deck. project would construct a new side deck and trash storage enclosure. the deck would be approximately 950 sq.ft. & +/-f5 ft above existing finish grade; maher n/a
Details
Permit
201607081849
Status
complete
Filed
Jul 8, 2016
Permit issued
Oct 11, 2016
Final sign-off
Dec 4, 2017
Declared cost
$65,000
Address
101 Townsend St

construction of new side deck. project would construct a new side deck and trash storage enclosure. the deck would be approximately 950 sq.ft. & +/-f5 ft above existing finish grade; maher n/a

Open the permit page

$65,000
Feb 1, 2016Completed
final sign-off Jan 2018
120 El Camino Del Marenclose existing deck at 3rd floor (unconditioned space)
Details
Permit
201602018473
Status
complete
Filed
Feb 1, 2016
Permit issued
Jul 18, 2017
Final sign-off
Jan 19, 2018
Declared cost
$25,000
Address
120 El Camino Del Mar

enclose existing deck at 3rd floor (unconditioned space)

Open the permit page

$25,000
Sep 29, 2015Completed
final sign-off Apr 2018
3020 Clay Sthorizontal addition. renovation addtion master bedroom, interior deck & master bath to become part of master bedrm. part of master bedrm into closets. 3rd fl to horizontal addition is covered w/ deck and rebuilt to code compliant stair & spiral stair is rebuilt to replace external stair case.
Details
Permit
201509298298
Status
complete
Filed
Sep 29, 2015
Permit issued
Oct 5, 2016
Final sign-off
Apr 19, 2018
Declared cost
$53,367
Address
3020 Clay St

horizontal addition. renovation addtion master bedroom, interior deck & master bath to become part of master bedrm. part of master bedrm into closets. 3rd fl to horizontal addition is covered w/ deck and rebuilt to code compliant stair & spiral stair is rebuilt to replace external stair case.

Open the permit page

$53,367
Jan 30, 2014Expired or cancelled
expired Mar 2022
2656 Mcallister Sthorizontal addition, raise bldg approx 3'4", modify street facade and add front exterior stair, to create a garage, remove existing rear exterior stair & deck, and extend bldg into rear yard.
Details
Permit
201401307458
Status
expired
Filed
Jan 30, 2014
Permit issued
Aug 24, 2016
Declared cost
$150,000
Address
2656 Mcallister St

horizontal addition, raise bldg approx 3'4", modify street facade and add front exterior stair, to create a garage, remove existing rear exterior stair & deck, and extend bldg into rear yard.

Open the permit page

$150,000
Jan 16, 2013Completed
final sign-off Jan 2015
141 Downey Stnew code compliant stair, bathroom & vertical addition. new roof deck. new deck at rear of first level. interior remodel.
Details
Permit
201301168090
Status
complete
Filed
Jan 16, 2013
Permit issued
Jul 16, 2013
Final sign-off
Jan 12, 2015
Declared cost
$135,000
Address
141 Downey St

new code compliant stair, bathroom & vertical addition. new roof deck. new deck at rear of first level. interior remodel.

Open the permit page

$135,000
Jun 19, 2012Never finaled
issued Jun 2012, no final
214 32nd Avrepair/replace dry rotted structural joists at rear, landing/deck; deck/landing is approx 25 sq.ft., repair in kind less than 50%
Details
Permit
201206192881
Status
issued
Filed
Jun 19, 2012
Permit issued
Jun 19, 2012
Declared cost
$1,500
Address
214 32nd Av

repair/replace dry rotted structural joists at rear, landing/deck; deck/landing is approx 25 sq.ft., repair in kind less than 50%

Open the permit page

$1,500
May 6, 2011Never finaled
issued Mar 2012, no final
2526 14th Avconstruction phase changes to work presently underway per 2009-08-07-4386: modify layout of bathroom on floor 3, deck on floor 2 and roofline. add mudroom (floor 1), omit 1 skylight, re-size 1 flat skylight, re-size & relocate 1 flatskylight (floor 3), delta 8 is the scope of work under this permit.
Details
Permit
201105065502
Status
issued
Filed
May 6, 2011
Permit issued
Mar 15, 2012
Final sign-off
Mar 15, 2012
Declared cost
$1,500
Address
2526 14th Av

construction phase changes to work presently underway per 2009-08-07-4386: modify layout of bathroom on floor 3, deck on floor 2 and roofline. add mudroom (floor 1), omit 1 skylight, re-size 1 flat skylight, re-size & relocate 1 flatskylight (floor 3), delta 8 is the scope of work under this permit.

Open the permit page

$1,500
May 3, 2011Completed
final sign-off Nov 2012
235 Francisco Stinstall new sister joists and beam to strenthen (e) deck.
Details
Permit
201105035230
Status
complete
Filed
May 3, 2011
Permit issued
May 3, 2011
Final sign-off
Nov 20, 2012
Declared cost
$5,000
Address
235 Francisco St

install new sister joists and beam to strenthen (e) deck.

Open the permit page

$5,000
Nov 15, 2010Completed
final sign-off Nov 2011
447 Battery Stnew wine bar with prep kitchen. rebuild exterior deck. hvac under sep permit. sidewalk work under separate permit.
Details
Permit
201011154938
Status
complete
Filed
Nov 15, 2010
Permit issued
Jun 6, 2011
Final sign-off
Nov 29, 2011
Declared cost
$150,000
Address
447 Battery St

new wine bar with prep kitchen. rebuild exterior deck. hvac under sep permit. sidewalk work under separate permit.

Open the permit page

$150,000
Jun 21, 2010Completed
final sign-off Aug 2010
4231 23rd Strepair less than 50% of rear stair at deck ( repalce stringers with pt materials), replace in kind.
Details
Permit
201006214947
Status
complete
Filed
Jun 21, 2010
Permit issued
Jun 21, 2010
Final sign-off
Aug 3, 2010
Declared cost
$2,500
Address
4231 23rd St

repair less than 50% of rear stair at deck ( repalce stringers with pt materials), replace in kind.

Open the permit page

$2,500
Jul 15, 2009Completed
final sign-off Oct 2009
121 Chicago Wyreplace stucco rear wall, replace dry rot members.reattach (e) deck. provide 2 new waterproof outlets. work not visible from street,
Details
Permit
200907152699
Status
complete
Filed
Jul 15, 2009
Permit issued
Jul 28, 2009
Final sign-off
Oct 19, 2009
Declared cost
$18,800
Address
121 Chicago Wy

replace stucco rear wall, replace dry rot members.reattach (e) deck. provide 2 new waterproof outlets. work not visible from street,

Open the permit page

$18,800
Mar 19, 2008Completed
final sign-off Jan 2011
1647 35th Avtwo story horizontal addition into rear yard for (n) office and (n) sitting room on the 1st floor, and (n) office and (n) deck on the 2nd floor. new basement below new horizontal addition.
Details
Permit
200803197466
Status
complete
Filed
Mar 19, 2008
Permit issued
May 19, 2009
Final sign-off
Jan 5, 2011
Declared cost
$180,000
Address
1647 35th Av

two story horizontal addition into rear yard for (n) office and (n) sitting room on the 1st floor, and (n) office and (n) deck on the 2nd floor. new basement below new horizontal addition.

Open the permit page

$180,000
Dec 19, 2001Expired or cancelled
expired Apr 2002
971 Lombard Stremove dry rotted areas of (e) deck replace with new pressure treated lumber less than 50% rear yard
Details
Permit
200112195596
Status
expired
Filed
Dec 19, 2001
Permit issued
Dec 19, 2001
Declared cost
$1,500
Address
971 Lombard St

remove dry rotted areas of (e) deck replace with new pressure treated lumber less than 50% rear yard

Open the permit page

$1,500