Block 4071, lot 028
715 De Haro St
- City’s use
- Multi-Family Residential
- Built
- 1965
- Stories
- 2
- Units
- 2
- Rooms
- 3 bathrooms
- Building
- 2,333 sq ft
- Lot
- 2,495 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 31, 2025 | Completed final sign-off May 2025 | 715 De Haro St | Gadi Construction Inc | revision to permit 202405091771. the deck and stairs handrail has been modified, a prefabricated steel handrail is proposed. see details 5/sd-1 and 6/sd-1 for changes.Details
revision to permit 202405091771. the deck and stairs handrail has been modified, a prefabricated steel handrail is proposed. see details 5/sd-1 and 6/sd-1 for changes. | |
| Dec 30, 2024 | Completed final sign-off Jan 2025 | 717 De Haro St | Elm Roofing Contractors Inc Dba Element | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $15,637 |
| Nov 5, 2024 | Completed final sign-off May 2025 | 715 De Haro St | Gadi Construction Inc | to comply w/ physical inspection report condo conversion 8588: legalize window replacement for entire dwelling. 717 de haro - 2 windows front facing aluminum. 715 de haro - 3 windows north facing/3east facing. all aluminum. cc #8588. - page 2 (bid & his) item #9 onlyDetails
to comply w/ physical inspection report condo conversion 8588: legalize window replacement for entire dwelling. 717 de haro - 2 windows front facing aluminum. 715 de haro - 3 windows north facing/3east facing. all aluminum. cc #8588. - page 2 (bid & his) item #9 only | $5,000 |
| Aug 15, 2024 | Completed final sign-off Aug 2024 | 715 De Haro St | Delta Electric | replace existing wireflex ductwork in garage with 26g hard pipeDetails
replace existing wireflex ductwork in garage with 26g hard pipe | $3,000 |
| May 9, 2024 | Completed final sign-off May 2025 | 715 De Haro St | Gadi Construction Inc | extend deck 6' to comply with physical inspector report condo conversion 8588Details
extend deck 6' to comply with physical inspector report condo conversion 8588 | $20,000 |
| Dec 21, 2023 | In progress issued Dec 2023 | 717 De Haro St | Gadi Construction Inc | to comply with physical inspection report. #cc8588. condon conversion.Details
to comply with physical inspection report. #cc8588. condon conversion. | $2,000 |
| Mar 28, 2023 | Completed final sign-off Aug 2023 | 715 De Haro St | Gadi Construction Inc | convert (1) bathrooms into (2) bathrooms. reconfigure non-bearing wall & add (n) wall & doorway for (n) bedwoom on 1st fl. install (n) vanity & shower. (n) bathroom layout w/ addition of (n) free standing tub. walk in closet in bedroom 1 to expand & relocate door for bedroomDetails
convert (1) bathrooms into (2) bathrooms. reconfigure non-bearing wall & add (n) wall & doorway for (n) bedwoom on 1st fl. install (n) vanity & shower. (n) bathroom layout w/ addition of (n) free standing tub. walk in closet in bedroom 1 to expand & relocate door for bedroom | $48,000 |
| Nov 16, 2021 | Completed final sign-off Nov 2022 | 715 De Haro St | Untitled Labs Inc Dba Made Renovation | bathroom remodel:50 sq ft remodel on ground fl in kind. no structural no changes to walls or openings, all lighting to comply wityh cec 150.0(k)(n) tub/shower,vanity,toilet,fixtures & finishes.Details
bathroom remodel:50 sq ft remodel on ground fl in kind. no structural no changes to walls or openings, all lighting to comply wityh cec 150.0(k)(n) tub/shower,vanity,toilet,fixtures & finishes. | $14,500 |
| Feb 2, 2009 | Completed final sign-off Jan 2010 | 717 De Haro St | Narrowback Construction Co. | interior remodel (no change or any work to exterior) to the (e) top floor residence. renovate (e) master bedroom & (e) master bath, convert one (e) bedroom into new master dressing room. renovate (e) study/bedroom. renovate (e) entry hall. install 3 new beams due to the removal of walls.Details
interior remodel (no change or any work to exterior) to the (e) top floor residence. renovate (e) master bedroom & (e) master bath, convert one (e) bedroom into new master dressing room. renovate (e) study/bedroom. renovate (e) entry hall. install 3 new beams due to the removal of walls. | $60,000 |
| Dec 4, 2007 | Expired or cancelled withdrawn Oct 2008 | 715 De Haro St | vertical addition to top (4th floor) to exist dwelling (615 s.f. of master bedroom suite w/bath and 200 sf of roof deck, continuation of 3rd floor stairway up to new floor addition.Details
vertical addition to top (4th floor) to exist dwelling (615 s.f. of master bedroom suite w/bath and 200 sf of roof deck, continuation of 3rd floor stairway up to new floor addition. | $150,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.