Block 1353, lot 025
76 06th Ave
- City’s use
- Single Family Residential
- Built
- 1905
- Stories
- 3
- Units
- 1
- Rooms
- 4 bedrooms, 3 bathrooms
- Building
- 2,364 sq ft
- Lot
- 3,072 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 25, 2016 | Never finaled issued Aug 2016, no final | 76 06th Av | street spaceDetails
street space | ||
| Nov 13, 2015 | Never finaled issued Nov 2015, no final | 76 06th Av | street space permitDetails
street space permit | ||
| Aug 11, 2015 | Never finaled issued Aug 2015, no final | 76 06th Av | Schmitt Heating Co Inc | replace existing ductwork in attic and dropped ceiling with new flexible ducting.Details
replace existing ductwork in attic and dropped ceiling with new flexible ducting. | $16,310 |
| Jul 17, 2015 | Never finaled issued Apr 2016, no final | 76 06th Av | Narrowback Construction Co. | horizontal (rear) addition @ 1st,2nd,3rd flrs. one (n) bathroom @ 3rd flr. some (n) framing, elec, plumbing, as per plan. n/a for maher ordinance.Details
horizontal (rear) addition @ 1st,2nd,3rd flrs. one (n) bathroom @ 3rd flr. some (n) framing, elec, plumbing, as per plan. n/a for maher ordinance. | $93,000 |
| May 18, 2015 | Never finaled issued May 2015, no final | 76 06th Av | street spaceDetails
street space | ||
| Apr 22, 2015 | Completed final sign-off Sep 2016 | 76 06th Av | Narrowback Construction Co. | revision to pa # 2015 0323 1562; new concrete slab at garage, foundation improvements, new opening at 2nd flr wall. maher - not req'dDetails
revision to pa # 2015 0323 1562; new concrete slab at garage, foundation improvements, new opening at 2nd flr wall. maher - not req'd | $80,000 |
| Mar 23, 2015 | Completed final sign-off Sep 2016 | 76 06th Av | Narrowback Construction Co. | 1st flr: add new interior stair from (garage lvl)to 2nd flr,excavate for 7'-6"head ht at new heated spaces at 1st flr;2nd flr:remodel kitchen,replace 2 broken brick fireplaces w/decorative gas appliance,infill 2 windows @(e)lightwell.3rd flr: add new egress window,remodel bath 2 and 3 to laundry rmDetails
1st flr: add new interior stair from (garage lvl)to 2nd flr,excavate for 7'-6"head ht at new heated spaces at 1st flr;2nd flr:remodel kitchen,replace 2 broken brick fireplaces w/decorative gas appliance,infill 2 windows @(e)lightwell.3rd flr: add new egress window,remodel bath 2 and 3 to laundry rm | $150,000 |
| Nov 17, 2014 | Completed final sign-off Sep 2016 | 76 06th Av | Narrowback Construction Co. | remove three (3) brick chimneys & fireplaces. n/a ordinance #155-13. infill void.Details
remove three (3) brick chimneys & fireplaces. n/a ordinance #155-13. infill void. | $2,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Narrowback Construction Co. (4), Schmitt Heating Co Inc
- Architects
- James Dixon (3), Andrew Rogers
- Authorized agent-otherss
- Jennifer Butler
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.