Back to bathroom remodel contractors
Nabi Construction & Engineering Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2001 to Oct 2026
- Last 24 months
- 22 permits filed
401 permits since 2000: 336 completed, 11 in progress, 24 never finaled, 30 expired or cancelled.
Of the 24 never-finaled permits, 2 are 3 to 5 years old, 6 are 5 to 10 years old, 16 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
20 bathroom remodel permits: 16 completed, 1 in progress, 1 never finaled, 2 expired or cancelled. Typically 8 days from filing to permit and 273 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 25, 2025 | Completed final sign-off Oct 2026 | 2065 Ofarrell St | interior remodel: remodel existing kitchen and baths, add bath at each unit. open wall @ kitchen.Details
interior remodel: remodel existing kitchen and baths, add bath at each unit. open wall @ kitchen. | $464,000 |
| Jan 28, 2025 | Completed final sign-off Aug 2025 | 1396 Pacific Av | revision 202411205887 (bathroom remodel) to include additional bathroom remodel kitchen and add closet to bedroomDetails
revision 202411205887 (bathroom remodel) to include additional bathroom remodel kitchen and add closet to bedroom | $70,000 |
| Dec 23, 2024 | In progress issued Jan 2025 | 4172 23rd St | remodel sfd: convert first story storage area to habitable bedroom, bath & laundry closet with (n) stair. remove bath @ 2nd story, add powder room. add bathroom @ top fl & remodel (e) bath. replace aluminum windows at front facadeDetails
remodel sfd: convert first story storage area to habitable bedroom, bath & laundry closet with (n) stair. remove bath @ 2nd story, add powder room. add bathroom @ top fl & remodel (e) bath. replace aluminum windows at front facade | $328,000 |
| Jun 24, 2024 | Completed final sign-off May 2026 | 160 Noe St | remodel kitchen and bath at unit 160. reconfigure closets and interior partitions, open wall between kitchen and living area. remodel kitchen and bath at unit 162. reconfigure closets and interior partitions, open wall between kitchen and living areaDetails
remodel kitchen and bath at unit 160. reconfigure closets and interior partitions, open wall between kitchen and living area. remodel kitchen and bath at unit 162. reconfigure closets and interior partitions, open wall between kitchen and living area | $433,000 |
| Oct 23, 2018 | Completed final sign-off Mar 2020 | 160 10th St | ti for first floor and add new mezzaine- 1) revision to app#201806141910. 2)resized accessible bathroom. 3)add new 249 sq ft mezzanine. n/a for maher -sprinklers separate permit.Details
ti for first floor and add new mezzaine- 1) revision to app#201806141910. 2)resized accessible bathroom. 3)add new 249 sq ft mezzanine. n/a for maher -sprinklers separate permit. | $20,000 |
| Jun 14, 2018 | Completed final sign-off Mar 2020 | 160 10th St | 1) revision to app#201803234524. 2)provide new gas meter room. 3)replace extg roll up door at south wall. 4)relocate accessible bathroom.Details
1) revision to app#201803234524. 2)provide new gas meter room. 3)replace extg roll up door at south wall. 4)relocate accessible bathroom. | $5,000 |
| May 25, 2017 | Completed final sign-off Sep 2025 | 725 Grove St | per adu ordinance# 162-16. addition of 2 units on ground floor. reference pa# 2017/05/25/7616 for soft story. 1 bedroom & 1 bath each.Details
per adu ordinance# 162-16. addition of 2 units on ground floor. reference pa# 2017/05/25/7616 for soft story. 1 bedroom & 1 bath each. | $60,000 |
| Sep 8, 2016 | Completed final sign-off Nov 2016 | 3030 17th St | revision to pa #201511203230 - relocation of bathrooms & doors at 1st floor. removal of bathrooms from 2nd floor. provide partition walls for office, conference & utility rooms @ 2nd floor. 3 new canopy @ entry door @ east wall. n/a maher ordinanceDetails
revision to pa #201511203230 - relocation of bathrooms & doors at 1st floor. removal of bathrooms from 2nd floor. provide partition walls for office, conference & utility rooms @ 2nd floor. 3 new canopy @ entry door @ east wall. n/a maher ordinance | |
| Jul 2, 2015 | Completed final sign-off Feb 2017 | 3030 17th St | revision to app#2014-0812-3667: additional interior unit 555 sq ft added to 2nd floors, relocation of fire corridor and access doors, resize roll up doors, eliminate balconies, add 2 bathrooms, add 2 staircase, add 7 sets of windows.Details
revision to app#2014-0812-3667: additional interior unit 555 sq ft added to 2nd floors, relocation of fire corridor and access doors, resize roll up doors, eliminate balconies, add 2 bathrooms, add 2 staircase, add 7 sets of windows. | $75,000 |
| Feb 20, 2015 | Expired or cancelled cancelled Jan 2020 | 888 14th St | legalize (e) 1 units at basement per ordinance no# 43-14. 1 bedroom & 1 bathroom. electrical, plumbing, mechanical & fire sprinkler under separate permit.Details
legalize (e) 1 units at basement per ordinance no# 43-14. 1 bedroom & 1 bathroom. electrical, plumbing, mechanical & fire sprinkler under separate permit. | $75,000 |
| Oct 11, 2013 | Completed final sign-off Jun 2014 | 1405 Minnesota St | revision to app#201309126664. relocate bathroom fixtures at 1st floor.Details
revision to app#201309126664. relocate bathroom fixtures at 1st floor. | |
| Sep 12, 2013 | Completed final sign-off Jun 2014 | 1405 Minnesota St | revision to app#201303111946. add 4 bathrooms and space planning.Details
revision to app#201303111946. add 4 bathrooms and space planning. | $45,000 |
| Mar 5, 2012 | Expired or cancelled withdrawn Dec 2012 | 1405 Minnesota St | revision to appl #2011.07.18.0418 - keep (e) two spaces (not divide to 4 spaces), provide (n) ada restrooms at #1411 & upgrade (e) ada bath. comply w/physical inspcetion report cc-7005, dated 11/1/11.Details
revision to appl #2011.07.18.0418 - keep (e) two spaces (not divide to 4 spaces), provide (n) ada restrooms at #1411 & upgrade (e) ada bath. comply w/physical inspcetion report cc-7005, dated 11/1/11. | |
| Oct 11, 2011 | Never finaled issued Oct 2011, no final | 3450 03rd St | revision to pa #201107089763. combining shower room & bathroom & change door's locations.Details
revision to pa #201107089763. combining shower room & bathroom & change door's locations. | |
| Feb 3, 2010 | Completed final sign-off Nov 2011 | 501 03rd St | (n) partition walls for office @ 3rd. flr. (n) gypsum board ceiling. (n) h/c men's & women's bathrooms.Details
(n) partition walls for office @ 3rd. flr. (n) gypsum board ceiling. (n) h/c men's & women's bathrooms. | $80,000 |
| May 29, 2008 | Completed final sign-off Jul 2008 | 340 Division St | convert (e) non-accessible bathroom to accessible bathroom. change (e) entrance non-accessible door to accessible door, replace (e) water heater with new tank less water heaterDetails
convert (e) non-accessible bathroom to accessible bathroom. change (e) entrance non-accessible door to accessible door, replace (e) water heater with new tank less water heater | $15,000 |
| Jul 14, 2006 | Completed final sign-off Jan 2007 | 501 03rd St | roof strenthening. new guardrail at roof deck. low height and full height walls at 2nd floor & new ada bathroom at 2nd floor.revision to 200507228409 for roof strengthening & 200312122257 for 2nd floor work.Details
roof strenthening. new guardrail at roof deck. low height and full height walls at 2nd floor & new ada bathroom at 2nd floor.revision to 200507228409 for roof strengthening & 200312122257 for 2nd floor work. | $21,000 |
| Apr 4, 2006 | Completed final sign-off Jul 2006 | 2152 Union St | floor infill at 2nd floor. (n) ada bathroom at 3rd floor. floor infill supported by (n) steel frame & pad foundation.Details
floor infill at 2nd floor. (n) ada bathroom at 3rd floor. floor infill supported by (n) steel frame & pad foundation. | $18,000 |
| Oct 15, 2002 | Completed final sign-off Feb 2003 | 2480 Mission St | new accessible storefront and accessible bathrooms at 1st,2nd,3rd floorsDetails
new accessible storefront and accessible bathrooms at 1st,2nd,3rd floors | $48,000 |
| Nov 29, 2001 | Completed final sign-off Mar 2002 | 1100 Polk St | filling hardship for ramp to accessible bathroom on one store-rev to app 200101251689Details
filling hardship for ramp to accessible bathroom on one store-rev to app 200101251689 | $100 |