Nabi Construction & Engineering Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2001 to Oct 2026
- Last 24 months
- 22 permits filed
401 permits since 2000: 336 completed, 11 in progress, 24 never finaled, 30 expired or cancelled.
Of the 24 never-finaled permits, 2 are 3 to 5 years old, 6 are 5 to 10 years old, 16 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
6 deck permits: 4 completed, 1 in progress, 1 expired or cancelled. Typically 17 days from filing to permit and 102 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 27, 2026 | In progress issued Jun 2026 | 250 El Camino Del Mar | 1) demo (e) stairs & storage and build (n) stair & storage between grid lines b & d. 2) demo (e) stair and build (n) stair & deck between grid lines f & g. to comply with nov 202314852.Details
1) demo (e) stairs & storage and build (n) stair & storage between grid lines b & d. 2) demo (e) stair and build (n) stair & deck between grid lines f & g. to comply with nov 202314852. | $35,000 |
| Feb 24, 2026 | Completed final sign-off Jul 2026 | 1729 Polk St | g/f: demo (e) portion of 1/f courtyard and replace with new floor. remove portion of (e) concrete topping and replace with new topping as shown on plan. deck is for residential use only.Details
g/f: demo (e) portion of 1/f courtyard and replace with new floor. remove portion of (e) concrete topping and replace with new topping as shown on plan. deck is for residential use only. | $15,000 |
| Sep 17, 2024 | Expired or cancelled expired Mar 2026 | 160 Noe St | revision to pa 202406245066 minor reconfiguration of bathroms, closets kitchens 160 & 162. add rear deck and associated firewall. replace rear windows @ dining with door. structural upgrades to rear volumeDetails
revision to pa 202406245066 minor reconfiguration of bathroms, closets kitchens 160 & 162. add rear deck and associated firewall. replace rear windows @ dining with door. structural upgrades to rear volume | $44,000 |
| Mar 28, 2024 | Completed final sign-off Jul 2024 | 595 Diamond St | new deck over existing garage roofDetails
new deck over existing garage roof | $25,000 |
| Dec 6, 2006 | Completed final sign-off Jan 2007 | 501 03rd St | show deck framing on sheets sr1.1, revision on dwg a2.1 shows low height wall as cabinet wall. rev 200607146644Details
show deck framing on sheets sr1.1, revision on dwg a2.1 shows low height wall as cabinet wall. rev 200607146644 | |
| Jan 14, 2004 | Completed final sign-off Dec 2004 | 2055 Bryant St | interior remodel & addition of exterior deck & 2nd floor.Details
interior remodel & addition of exterior deck & 2nd floor. | $250,000 |