Back to kitchen remodel contractors
N M S Brosnan Construction
- Based in
- Milbrae
- On San Francisco permits
- Feb 2001 to Aug 2026
- Last 24 months
- 3 permits filed
52 permits since 2000: 36 completed, 4 in progress, 8 never finaled, 4 expired or cancelled.
Of the 8 never-finaled permits, 3 are 3 to 5 years old, 3 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 6 completed, 2 in progress, 2 never finaled. Typically 14 days from filing to permit and 245 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 28, 2026 | In progress issued Sep 2026 | 1959 47th Av | ground fl: add a bedroom, (2) half bath, kitchenette. add a closet to the washer dryerDetails
ground fl: add a bedroom, (2) half bath, kitchenette. add a closet to the washer dryer | $80,000 |
| Nov 5, 2025 | Completed final sign-off Jun 2026 | 2566 39th Av | revision to permit 202008121633 and 202008121637. add new skylight. change mech system and scheme changes. kitchen and bath remodel.Details
revision to permit 202008121633 and 202008121637. add new skylight. change mech system and scheme changes. kitchen and bath remodel. | $12,000 |
| Jul 1, 2021 | Never finaled issued Jul 2021, no final | 53 Christopher Dr | 2nd floor: kitchen and bathroom remodeling, merge extg 2 bathroom to one bedroom, add 5 skylight, replace extg windows in kind. replace window to sliding door faceing rear yard increase extg 2nd floor ceiling height. ground floor: add a new utility room at the ground floor.Details
2nd floor: kitchen and bathroom remodeling, merge extg 2 bathroom to one bedroom, add 5 skylight, replace extg windows in kind. replace window to sliding door faceing rear yard increase extg 2nd floor ceiling height. ground floor: add a new utility room at the ground floor. | $80,000 |
| Aug 12, 2020 | In progress issued Jan 2025 | 2566 39th Av | legalize existing unauthorized dwelling unit- adu per ordinance 162-16. new two story rear yard addition. 1st floor: new kitchen, bedroom, livingroom, & laundry room. remodel existing bathroom. 2nd floor: addition & alterations proposed under bpa# 202008121633.Details
legalize existing unauthorized dwelling unit- adu per ordinance 162-16. new two story rear yard addition. 1st floor: new kitchen, bedroom, livingroom, & laundry room. remodel existing bathroom. 2nd floor: addition & alterations proposed under bpa# 202008121633. | $83,398 |
| Oct 23, 2019 | Never finaled issued Oct 2019, no final | 2526 27th Av | add half bath at uppder level; kitchen remodel, open wall between kitchen & dining. add beam & footingsDetails
add half bath at uppder level; kitchen remodel, open wall between kitchen & dining. add beam & footings | $25,000 |
| Jan 9, 2018 | Completed final sign-off Apr 2023 | 2667 15th Av | remodel the entire ground floor garage & area behind the garage. replacement of the (e) foundation & slab-on-grade (necessitaded by soil erosion due to a burst of city water line & flooding in 2011). remodel (e) kitchen, breakfast & bathroom on main level. addition of masterbedrm to 3rd flDetails
remodel the entire ground floor garage & area behind the garage. replacement of the (e) foundation & slab-on-grade (necessitaded by soil erosion due to a burst of city water line & flooding in 2011). remodel (e) kitchen, breakfast & bathroom on main level. addition of masterbedrm to 3rd fl | $100,000 |
| Mar 9, 2016 | Completed final sign-off Jul 2018 | 2679 15th Av | remove all wall, ceiling, and floor covering down to frame, no structural or framing alterations to be made. all plumbing, electrical, & hvac work by others. insulation and drywall to be done to title 24 requirements. interior remodel, kitchen & 3 bathrooms.Details
remove all wall, ceiling, and floor covering down to frame, no structural or framing alterations to be made. all plumbing, electrical, & hvac work by others. insulation and drywall to be done to title 24 requirements. interior remodel, kitchen & 3 bathrooms. | $275,000 |
| Oct 24, 2012 | Completed final sign-off Jan 2013 | 1471 27th Av | open hall at kitchen to dining bigger. add plywood to closet hall at foyer. replace bath toilet & fixture and replace tile.Details
open hall at kitchen to dining bigger. add plywood to closet hall at foyer. replace bath toilet & fixture and replace tile. | $4,500 |
| Nov 12, 2009 | Completed final sign-off May 2010 | 2647 Lombard St | remodel existing kitchen and bath on lower level of unit. add new powerder room by enclosing existing lightwell. not visible from the street. new skylights. all work on lower level of upper unitDetails
remodel existing kitchen and bath on lower level of unit. add new powerder room by enclosing existing lightwell. not visible from the street. new skylights. all work on lower level of upper unit | $40,000 |
| Jun 24, 2003 | Completed final sign-off Apr 2004 | 2272 Bay St | remodel existing kitchen w/ new cabinets,flooring, appliances. no structural.remodel exist bath withDetails
remodel existing kitchen w/ new cabinets,flooring, appliances. no structural.remodel exist bath with | $75,000 |