Michael C Hargrove Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Feb 2023
- Last 24 months
- 0 permits filed
102 permits since 2000: 84 completed, 10 never finaled, 8 expired or cancelled.
Of the 10 never-finaled permits, 3 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
6 roof deck permits: 3 completed, 2 never finaled, 1 expired or cancelled. Typically 169 days from filing to permit and 878 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 29, 2017 | Never finaled issued Jun 2017, no final | 3600 Scott St | revision to pa #201601288204 - raise glass rail at roof deck to 72". n/a maher ordinance. remove (e) ceiling over master bedroom.Details
revision to pa #201601288204 - raise glass rail at roof deck to 72". n/a maher ordinance. remove (e) ceiling over master bedroom. | |
| Jan 28, 2016 | Never finaled issued Aug 2016, no final | 3600 Scott St | add elevator, 3rd flr addition to (e) 3rd flr (enlarging (e) bedrooms). (n) roof deck and stair/elevator penthouse. fire sprinkler throughout. n/a for maher ordinance no.155-13.Details
add elevator, 3rd flr addition to (e) 3rd flr (enlarging (e) bedrooms). (n) roof deck and stair/elevator penthouse. fire sprinkler throughout. n/a for maher ordinance no.155-13. | $50,000 |
| Jun 23, 2014 | Completed final sign-off Apr 2018 | 3544 Scott St | unit# 3544. remodel kitchen & bath. new finishes & fixtures. add new full bathroom, new stairs to new roof deck. replace 4 windows & 1 (e) door with new. garage: move 2 small walls in storage area. ** maher: compliance with ordinance no# 155-13 not required **Details
unit# 3544. remodel kitchen & bath. new finishes & fixtures. add new full bathroom, new stairs to new roof deck. replace 4 windows & 1 (e) door with new. garage: move 2 small walls in storage area. ** maher: compliance with ordinance no# 155-13 not required ** | $90,000 |
| Dec 6, 2012 | Expired or cancelled expired Feb 2015 | 380 Capp St | (front building) rebuild exterior rear stair. add new rear decks & new roof deck.Details
(front building) rebuild exterior rear stair. add new rear decks & new roof deck. | $8,500 |
| Jan 18, 2012 | Completed final sign-off Mar 2016 | 380 Capp St | create open plan, dining rm & kitchen on 2nd fl. remodel bath & powder rm. new 6'-10" addit'n on 3rd fl for new master bath & roof access. remodel master bedrm & closet. new roof decks & exterior stair on 2nd fl roof.Details
create open plan, dining rm & kitchen on 2nd fl. remodel bath & powder rm. new 6'-10" addit'n on 3rd fl for new master bath & roof access. remodel master bedrm & closet. new roof decks & exterior stair on 2nd fl roof. | $60,000 |
| Nov 7, 2007 | Completed final sign-off Jan 2009 | 267 Duncan St | rear 1 story add. and roof deck and remodel existing habitable room, kitchen, new full bath, bedroom 1st flr. relocate 3 exist windows, demo rear 1 story dining room with deck and part of east facing yard walls. new rear yard deck at gradeDetails
rear 1 story add. and roof deck and remodel existing habitable room, kitchen, new full bath, bedroom 1st flr. relocate 3 exist windows, demo rear 1 story dining room with deck and part of east facing yard walls. new rear yard deck at grade | $45,000 |