Back to kitchen remodel contractors
Michael C Hargrove Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Feb 2023
- Last 24 months
- 0 permits filed
102 permits since 2000: 84 completed, 10 never finaled, 8 expired or cancelled.
Of the 10 never-finaled permits, 3 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
32 kitchen remodel permits: 30 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 172 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 28, 2023 | Completed final sign-off May 2023 | 421 Congo St | interior kitchen remodel @ main lvl & removal of obselete masonry flu enclosure @ lower lvl, main lvl & termination above roof.Details
interior kitchen remodel @ main lvl & removal of obselete masonry flu enclosure @ lower lvl, main lvl & termination above roof. | $45,000 |
| Feb 5, 2020 | Completed final sign-off Sep 2021 | 306 Salinas Av | replace finishes (cabinets, countertops) in kitchen. replace finishes in 2 bathrooms, new tile, fixtures. no structural work.Details
replace finishes (cabinets, countertops) in kitchen. replace finishes in 2 bathrooms, new tile, fixtures. no structural work. | $40,000 |
| May 11, 2018 | Completed final sign-off Oct 2018 | 3435 Clay St | replace finishes and fixtures in kitchen & bathDetails
replace finishes and fixtures in kitchen & bath | $45,000 |
| Mar 10, 2016 | Completed final sign-off Aug 2018 | 3600 Scott St | interior remodel:north lightwell infill and studio apartment @1st flr; open kitchen,living rm & dining south lightwell infill & family room @2nd flr; reconfigure master bedrm & bathrm on 3rd flr, (n) 6 front facade +(n) 6 side & back marvin wood widnows, new sprinkler system throughout.Details
interior remodel:north lightwell infill and studio apartment @1st flr; open kitchen,living rm & dining south lightwell infill & family room @2nd flr; reconfigure master bedrm & bathrm on 3rd flr, (n) 6 front facade +(n) 6 side & back marvin wood widnows, new sprinkler system throughout. | $80,000 |
| Apr 17, 2015 | Completed final sign-off Nov 2015 | 4529 19th St | remodel (e) kitchen & nook area. all work interior except for one window at rear wall. (n) exhaust hood duct at rear wall.Details
remodel (e) kitchen & nook area. all work interior except for one window at rear wall. (n) exhaust hood duct at rear wall. | $28,000 |
| Jan 8, 2015 | Completed final sign-off Aug 2016 | 508 Hill St | rear addition 1st fl: (family rm).2nd fl(bedrm). relocate powder rm; kitchen remodel. relocate washer dryer to 2nf fl. remodel bathroms. rebuild damaged front stair.Details
rear addition 1st fl: (family rm).2nd fl(bedrm). relocate powder rm; kitchen remodel. relocate washer dryer to 2nf fl. remodel bathroms. rebuild damaged front stair. | $10,000 |
| Nov 25, 2014 | Never finaled issued Dec 2014, no final | 261 Joost Av | interior remodel at 1st floor. kitchen and bedroom 1. infill addition 12 sf at bedroom 1. hvac at basement. window replacement, window replacementDetails
interior remodel at 1st floor. kitchen and bedroom 1. infill addition 12 sf at bedroom 1. hvac at basement. window replacement, window replacement | $12,000 |
| Aug 1, 2014 | Completed final sign-off Jan 2015 | 1234 08th Av | remodel bathrooms (convert (e) bath & closet to 2 bathrooms), create washer/dryer closet @ 3/f, install one skylites in each bathroom @ 3rd floor. remove door & install window in opening, install new kitchen countertops @ 2nd floor.Details
remodel bathrooms (convert (e) bath & closet to 2 bathrooms), create washer/dryer closet @ 3/f, install one skylites in each bathroom @ 3rd floor. remove door & install window in opening, install new kitchen countertops @ 2nd floor. | $53,000 |
| Jun 23, 2014 | Completed final sign-off Apr 2018 | 3544 Scott St | unit# 3544. remodel kitchen & bath. new finishes & fixtures. add new full bathroom, new stairs to new roof deck. replace 4 windows & 1 (e) door with new. garage: move 2 small walls in storage area. ** maher: compliance with ordinance no# 155-13 not required **Details
unit# 3544. remodel kitchen & bath. new finishes & fixtures. add new full bathroom, new stairs to new roof deck. replace 4 windows & 1 (e) door with new. garage: move 2 small walls in storage area. ** maher: compliance with ordinance no# 155-13 not required ** | $90,000 |
| Oct 31, 2013 | Completed final sign-off Apr 2014 | 3282 Jackson St | remove & replace cabinets, finishes in kitchen & laundry, new sheetrock on walls & ceiling. lay new oak flooring in kitchen & dining roomDetails
remove & replace cabinets, finishes in kitchen & laundry, new sheetrock on walls & ceiling. lay new oak flooring in kitchen & dining room | $42,000 |
| Mar 12, 2013 | Completed final sign-off Apr 2014 | 3875 21st St | 42.5 sq ft addition at 1st fl rear, includes reconfiguring rear rooms @ 1st fl. remodel kitchen & powder room. replace windows @ 2nd fl.Details
42.5 sq ft addition at 1st fl rear, includes reconfiguring rear rooms @ 1st fl. remodel kitchen & powder room. replace windows @ 2nd fl. | $140,000 |
| Oct 12, 2012 | Completed final sign-off Mar 2016 | 380 Capp St | move cottage to rear n-w corner of lot, upgrade structure & foundation. remodel kitchen, bathroom, interior finishes; upgrade electrical, plumbing, mechanical. (n) window, skylight, (n) entry porch, (n) roof dormer @ entry.Details
move cottage to rear n-w corner of lot, upgrade structure & foundation. remodel kitchen, bathroom, interior finishes; upgrade electrical, plumbing, mechanical. (n) window, skylight, (n) entry porch, (n) roof dormer @ entry. | $15,000 |
| Sep 7, 2012 | Completed final sign-off Mar 2016 | 380 Capp St | replace kitchen cabinets approx. 8 feet long at wall & bases, sink. no lighting work, no tiling work & no wall relocation.Details
replace kitchen cabinets approx. 8 feet long at wall & bases, sink. no lighting work, no tiling work & no wall relocation. | $2,500 |
| Mar 6, 2012 | Completed final sign-off Dec 2012 | 382 Capp St | remodel kitchen, utility room and bath. infill at light well for powder room. seismic upgrade at 1st floor. new closet at entry. upgrade electrical, new forced air heat. new windows.Details
remodel kitchen, utility room and bath. infill at light well for powder room. seismic upgrade at 1st floor. new closet at entry. upgrade electrical, new forced air heat. new windows. | $35,000 |
| Jan 18, 2012 | Completed final sign-off Mar 2016 | 380 Capp St | create open plan, dining rm & kitchen on 2nd fl. remodel bath & powder rm. new 6'-10" addit'n on 3rd fl for new master bath & roof access. remodel master bedrm & closet. new roof decks & exterior stair on 2nd fl roof.Details
create open plan, dining rm & kitchen on 2nd fl. remodel bath & powder rm. new 6'-10" addit'n on 3rd fl for new master bath & roof access. remodel master bedrm & closet. new roof decks & exterior stair on 2nd fl roof. | $60,000 |
| May 6, 2011 | Completed final sign-off Jul 2011 | 400 Congo St | replafce 1 kitchen cabinets, counter tops & fixtures & finishes. remove 1 bathroom tub & construct new shower, replace finishes in bathroom. lighting to comply with cec 150(k). no change to walls & windowsDetails
replafce 1 kitchen cabinets, counter tops & fixtures & finishes. remove 1 bathroom tub & construct new shower, replace finishes in bathroom. lighting to comply with cec 150(k). no change to walls & windows | $26,000 |
| Mar 5, 2010 | Completed final sign-off Jul 2010 | 78 Anderson St | remove non bearing partition walls @ living/family room. reconfigure kitchen and bath. replace windows @ entry and great room and increase sizeDetails
remove non bearing partition walls @ living/family room. reconfigure kitchen and bath. replace windows @ entry and great room and increase size | $25,000 |
| Sep 25, 2009 | Completed final sign-off Oct 2009 | 244 Murray St | replace 5 vinyl windows, same kind same size, not visible from street, insulate breakfast room walls & new sheetrock. no structural change. replace kitchen & breakfast room floor coveringDetails
replace 5 vinyl windows, same kind same size, not visible from street, insulate breakfast room walls & new sheetrock. no structural change. replace kitchen & breakfast room floor covering | $4,000 |
| Aug 24, 2009 | Completed final sign-off Feb 2010 | 251 Duncan St | remove existing cabinets and counters. enlarge existing wall opening from 5-12'. replace existing window with new sliding door, new kitchen cabinets, appliances, lighting.repair and replace finishesDetails
remove existing cabinets and counters. enlarge existing wall opening from 5-12'. replace existing window with new sliding door, new kitchen cabinets, appliances, lighting.repair and replace finishes | $50,000 |
| Jun 5, 2009 | Completed final sign-off Sep 2009 | 650 Dartmouth St | replace kitchen cabinets, add outlets, move sink, close up sink window, new installation and sheet rock in kitchen and dining roomDetails
replace kitchen cabinets, add outlets, move sink, close up sink window, new installation and sheet rock in kitchen and dining room | $30,000 |
| Dec 5, 2007 | Completed final sign-off Sep 2008 | 265 Vasquez Av | remove bearing wall and install beam; new kitchen finishes, cabinets on 2nd floor. 2 bath remodels, new fixtures, tile & lightingDetails
remove bearing wall and install beam; new kitchen finishes, cabinets on 2nd floor. 2 bath remodels, new fixtures, tile & lighting | $70,000 |
| Nov 7, 2007 | Completed final sign-off Jan 2009 | 267 Duncan St | rear 1 story add. and roof deck and remodel existing habitable room, kitchen, new full bath, bedroom 1st flr. relocate 3 exist windows, demo rear 1 story dining room with deck and part of east facing yard walls. new rear yard deck at gradeDetails
rear 1 story add. and roof deck and remodel existing habitable room, kitchen, new full bath, bedroom 1st flr. relocate 3 exist windows, demo rear 1 story dining room with deck and part of east facing yard walls. new rear yard deck at grade | $45,000 |
| Mar 7, 2007 | Completed final sign-off Jul 2007 | 2611 25th Av | replace kitchen bbinets, install new appliances, replace fixtures & tile in bathroom, move toilet repair dry rot at front window app.3-4 sq yds of stucco repair. replace in kind. lighting to comply w/t-24 energy codes.Details
replace kitchen bbinets, install new appliances, replace fixtures & tile in bathroom, move toilet repair dry rot at front window app.3-4 sq yds of stucco repair. replace in kind. lighting to comply w/t-24 energy codes. | $30,000 |
| Jun 29, 2006 | Completed final sign-off Aug 2006 | 2258 15th St | fire repair at kitchen, replace 2 studs & sheetrock.Details
fire repair at kitchen, replace 2 studs & sheetrock. | $1,500 |
| Jul 14, 2005 | Completed final sign-off Mar 2006 | 3545 19th St | remodel kitchen & bath, widen window at hallwayDetails
remodel kitchen & bath, widen window at hallway | $16,000 |
| Dec 23, 2004 | Completed final sign-off Apr 2005 | 184 Gates St | remodel/update kitchen/bath, same location and sizeDetails
remodel/update kitchen/bath, same location and size | $50,000 |
| Dec 30, 2002 | Completed final sign-off Sep 2003 | 318 Salinas Av | replace surfaces, cabinets, fixture + appiliances on 2nd flr in bath + kitchen. replace existing winDetails
replace surfaces, cabinets, fixture + appiliances on 2nd flr in bath + kitchen. replace existing win | $23,000 |
| Jun 12, 2002 | Completed final sign-off Sep 2002 | 262 Ralston St | remodel (e) kitchen & new cabinets, new floor coveringDetails
remodel (e) kitchen & new cabinets, new floor covering | $22,000 |
| Dec 18, 2001 | Completed final sign-off Sep 2002 | 229 27th St | new larger deck and tair to replace existing replace kitchen cabinets and appliance new door and winDetails
new larger deck and tair to replace existing replace kitchen cabinets and appliance new door and win | $8,000 |
| Nov 8, 2001 | Completed final sign-off Apr 2002 | 338 Sanchez St | remodel kitchen, new windowDetails
remodel kitchen, new window | $25,000 |
| Dec 18, 2000 | Completed final sign-off May 2001 | 831 Ashbury St | kitchen & bathroom remodelDetails
kitchen & bathroom remodel | $18,000 |
| Mar 8, 2000 | Expired or cancelled expired Jul 2000 | 4318 23rd St | kitchen remodel renewal ofDetails
kitchen remodel renewal of |