Michael C Hargrove Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Feb 2023
- Last 24 months
- 0 permits filed
102 permits since 2000: 84 completed, 10 never finaled, 8 expired or cancelled.
Of the 10 never-finaled permits, 3 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
10 deck permits: 8 completed, 1 never finaled, 1 expired or cancelled. Typically 146 days from filing to permit and 164 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 13, 2018 | Completed final sign-off Jul 2020 | 3600 Scott St | horizontal extension of (e) rear deck @ 2nd floor. **maher n/a**Details
horizontal extension of (e) rear deck @ 2nd floor. **maher n/a** | $2,000 |
| Oct 20, 2017 | Completed final sign-off Nov 2017 | 3544 Scott St | repair dry rot damaged guardrail sand decking at 3rd level of (e) rear 3 story deck structure, approx 30% of(e) struture.(n) wf membrane, with 1x6 1pc decking over 2xpt sleeper.Details
repair dry rot damaged guardrail sand decking at 3rd level of (e) rear 3 story deck structure, approx 30% of(e) struture.(n) wf membrane, with 1x6 1pc decking over 2xpt sleeper. | $2,500 |
| Oct 4, 2017 | Completed final sign-off May 2019 | 917 Alvarado St | rear addition @ 1st floor. two bedrooms, playroom, bathroom & laundry room. remove & replace (e) interior stair between 1st and 2nd floor. upgrade (e) bathroom and toilet @ 2nd floor with new fixture & finishes. deck addition with new exterior stair to rear yard.Details
rear addition @ 1st floor. two bedrooms, playroom, bathroom & laundry room. remove & replace (e) interior stair between 1st and 2nd floor. upgrade (e) bathroom and toilet @ 2nd floor with new fixture & finishes. deck addition with new exterior stair to rear yard. | $10,000 |
| Dec 6, 2012 | Expired or cancelled expired Feb 2015 | 380 Capp St | (front building) rebuild exterior rear stair. add new rear decks & new roof deck.Details
(front building) rebuild exterior rear stair. add new rear decks & new roof deck. | $8,500 |
| Jun 20, 2012 | Completed final sign-off Apr 2013 | 832 Alvarado St | new infill addition under (e) family room; (n) master bedroom/bath & closet; (n) exterior decks & stair.Details
new infill addition under (e) family room; (n) master bedroom/bath & closet; (n) exterior decks & stair. | $20,000 |
| Nov 7, 2007 | Completed final sign-off Jan 2009 | 267 Duncan St | rear 1 story add. and roof deck and remodel existing habitable room, kitchen, new full bath, bedroom 1st flr. relocate 3 exist windows, demo rear 1 story dining room with deck and part of east facing yard walls. new rear yard deck at gradeDetails
rear 1 story add. and roof deck and remodel existing habitable room, kitchen, new full bath, bedroom 1st flr. relocate 3 exist windows, demo rear 1 story dining room with deck and part of east facing yard walls. new rear yard deck at grade | $45,000 |
| Jul 25, 2005 | Never finaled issued Jul 2005, no final | 1234 08th Av | horizontal addition- construct new deck at 2nd flr level w/new stair down to 1st (basement) ground lDetails
horizontal addition- construct new deck at 2nd flr level w/new stair down to 1st (basement) ground l | $5,000 |
| Mar 16, 2005 | Completed final sign-off Aug 2006 | 549 Laidley St | addition at rear on first and second floors/addition of a deck on 2nd floor & modificationsDetails
addition at rear on first and second floors/addition of a deck on 2nd floor & modifications | $30,000 |
| Jul 16, 2003 | Completed final sign-off Feb 2004 | 577 Belvedere St | add 2 level deck and stair at rear, remove (e) stair at lightwellDetails
add 2 level deck and stair at rear, remove (e) stair at lightwell | $5,000 |
| Dec 18, 2001 | Completed final sign-off Sep 2002 | 229 27th St | new larger deck and tair to replace existing replace kitchen cabinets and appliance new door and winDetails
new larger deck and tair to replace existing replace kitchen cabinets and appliance new door and win | $8,000 |