Back to bathroom remodel contractors
Michael C Hargrove Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Feb 2023
- Last 24 months
- 0 permits filed
102 permits since 2000: 84 completed, 10 never finaled, 8 expired or cancelled.
Of the 10 never-finaled permits, 3 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
34 bathroom remodel permits: 31 completed, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 162 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 5, 2020 | Completed final sign-off Nov 2020 | 333 Hill St | complete remodel of bathroom on the second story of 2-story unit of a 2-unit condo building. changing the orientation of the door to the bedroom and removing a closet in the hallway.Details
complete remodel of bathroom on the second story of 2-story unit of a 2-unit condo building. changing the orientation of the door to the bedroom and removing a closet in the hallway. | $37,908 |
| Feb 5, 2020 | Completed final sign-off May 2020 | 228 San Jose Av | new finishes in bath due to water damageDetails
new finishes in bath due to water damage | $15,000 |
| Feb 5, 2020 | Completed final sign-off Sep 2021 | 306 Salinas Av | replace finishes (cabinets, countertops) in kitchen. replace finishes in 2 bathrooms, new tile, fixtures. no structural work.Details
replace finishes (cabinets, countertops) in kitchen. replace finishes in 2 bathrooms, new tile, fixtures. no structural work. | $40,000 |
| Jan 16, 2020 | Never finaled issued Feb 2020, no final | 3282 Jackson St | remedial repair: leveling of floors, replacement of wood flooring, replacement of windows, painting, replacement of wood trim, replacement of exterior siding, foundation substrate support, bathroom-replacement of floor and shower tile, stone countertop and bathroom fixtures.Details
remedial repair: leveling of floors, replacement of wood flooring, replacement of windows, painting, replacement of wood trim, replacement of exterior siding, foundation substrate support, bathroom-replacement of floor and shower tile, stone countertop and bathroom fixtures. | $365,000 |
| May 11, 2018 | Completed final sign-off Oct 2018 | 3435 Clay St | replace finishes and fixtures in kitchen & bathDetails
replace finishes and fixtures in kitchen & bath | $45,000 |
| Oct 4, 2017 | Completed final sign-off May 2019 | 917 Alvarado St | rear addition @ 1st floor. two bedrooms, playroom, bathroom & laundry room. remove & replace (e) interior stair between 1st and 2nd floor. upgrade (e) bathroom and toilet @ 2nd floor with new fixture & finishes. deck addition with new exterior stair to rear yard.Details
rear addition @ 1st floor. two bedrooms, playroom, bathroom & laundry room. remove & replace (e) interior stair between 1st and 2nd floor. upgrade (e) bathroom and toilet @ 2nd floor with new fixture & finishes. deck addition with new exterior stair to rear yard. | $10,000 |
| Sep 30, 2014 | Completed final sign-off Mar 2015 | 267 Duncan St | remodel of 2 bathrooms on 2nd floor of family home. relocation of 1 bath,toilet and put in new shower in extg bathrooms. remove 2 small non bearing walls.Details
remodel of 2 bathrooms on 2nd floor of family home. relocation of 1 bath,toilet and put in new shower in extg bathrooms. remove 2 small non bearing walls. | $10,000 |
| Aug 1, 2014 | Completed final sign-off Jan 2015 | 1234 08th Av | remodel bathrooms (convert (e) bath & closet to 2 bathrooms), create washer/dryer closet @ 3/f, install one skylites in each bathroom @ 3rd floor. remove door & install window in opening, install new kitchen countertops @ 2nd floor.Details
remodel bathrooms (convert (e) bath & closet to 2 bathrooms), create washer/dryer closet @ 3/f, install one skylites in each bathroom @ 3rd floor. remove door & install window in opening, install new kitchen countertops @ 2nd floor. | $53,000 |
| Jun 23, 2014 | Completed final sign-off Apr 2018 | 3544 Scott St | unit# 3544. remodel kitchen & bath. new finishes & fixtures. add new full bathroom, new stairs to new roof deck. replace 4 windows & 1 (e) door with new. garage: move 2 small walls in storage area. ** maher: compliance with ordinance no# 155-13 not required **Details
unit# 3544. remodel kitchen & bath. new finishes & fixtures. add new full bathroom, new stairs to new roof deck. replace 4 windows & 1 (e) door with new. garage: move 2 small walls in storage area. ** maher: compliance with ordinance no# 155-13 not required ** | $90,000 |
| Jun 11, 2014 | Completed final sign-off Dec 2014 | 1 Crestmont Dr | remodel 1st fl bath, new fixts & finishes. replace plastic shower w/ tiled unit. reduce size of bedroom closet. install cabinetry on opposite side. replace bath pocket door. repair wall & ceiling surfaces in family room on 1st fl.Details
remodel 1st fl bath, new fixts & finishes. replace plastic shower w/ tiled unit. reduce size of bedroom closet. install cabinetry on opposite side. replace bath pocket door. repair wall & ceiling surfaces in family room on 1st fl. | $18,000 |
| May 21, 2014 | Completed final sign-off Mar 2016 | 1406 Sanchez St | convert lower level storage into bedroom & bath. modify driveway and garage entrance. reconfigure rear yeard stair. (n) interior stair. remodel bath, bedroom & closet @ 2nd floor. sidewalk permit under separate permit.Details
convert lower level storage into bedroom & bath. modify driveway and garage entrance. reconfigure rear yeard stair. (n) interior stair. remodel bath, bedroom & closet @ 2nd floor. sidewalk permit under separate permit. | $50,000 |
| Oct 12, 2012 | Completed final sign-off Mar 2016 | 380 Capp St | move cottage to rear n-w corner of lot, upgrade structure & foundation. remodel kitchen, bathroom, interior finishes; upgrade electrical, plumbing, mechanical. (n) window, skylight, (n) entry porch, (n) roof dormer @ entry.Details
move cottage to rear n-w corner of lot, upgrade structure & foundation. remodel kitchen, bathroom, interior finishes; upgrade electrical, plumbing, mechanical. (n) window, skylight, (n) entry porch, (n) roof dormer @ entry. | $15,000 |
| Jun 20, 2012 | Completed final sign-off Apr 2013 | 832 Alvarado St | new infill addition under (e) family room; (n) master bedroom/bath & closet; (n) exterior decks & stair.Details
new infill addition under (e) family room; (n) master bedroom/bath & closet; (n) exterior decks & stair. | $20,000 |
| Mar 6, 2012 | Completed final sign-off Dec 2012 | 382 Capp St | remodel kitchen, utility room and bath. infill at light well for powder room. seismic upgrade at 1st floor. new closet at entry. upgrade electrical, new forced air heat. new windows.Details
remodel kitchen, utility room and bath. infill at light well for powder room. seismic upgrade at 1st floor. new closet at entry. upgrade electrical, new forced air heat. new windows. | $35,000 |
| Jan 18, 2012 | Completed final sign-off Mar 2016 | 380 Capp St | create open plan, dining rm & kitchen on 2nd fl. remodel bath & powder rm. new 6'-10" addit'n on 3rd fl for new master bath & roof access. remodel master bedrm & closet. new roof decks & exterior stair on 2nd fl roof.Details
create open plan, dining rm & kitchen on 2nd fl. remodel bath & powder rm. new 6'-10" addit'n on 3rd fl for new master bath & roof access. remodel master bedrm & closet. new roof decks & exterior stair on 2nd fl roof. | $60,000 |
| May 6, 2011 | Completed final sign-off Jul 2011 | 400 Congo St | replafce 1 kitchen cabinets, counter tops & fixtures & finishes. remove 1 bathroom tub & construct new shower, replace finishes in bathroom. lighting to comply with cec 150(k). no change to walls & windowsDetails
replafce 1 kitchen cabinets, counter tops & fixtures & finishes. remove 1 bathroom tub & construct new shower, replace finishes in bathroom. lighting to comply with cec 150(k). no change to walls & windows | $26,000 |
| Sep 23, 2010 | Completed final sign-off May 2011 | 140 Santa Monica Wy | expand existing basement utility room to create additional bedroom, full bath, and utility area. remove wall at stair down, adjust grade at side yard and pave. new beam and post added to garage.Details
expand existing basement utility room to create additional bedroom, full bath, and utility area. remove wall at stair down, adjust grade at side yard and pave. new beam and post added to garage. | $50,000 |
| Sep 2, 2010 | Completed final sign-off Oct 2010 | 444 Myra Wy | replace fixtures & finishes in bathroom. move non bearing partitions to enlarge bathroom & closetDetails
replace fixtures & finishes in bathroom. move non bearing partitions to enlarge bathroom & closet | $12,000 |
| Mar 5, 2010 | Completed final sign-off Jul 2010 | 78 Anderson St | remove non bearing partition walls @ living/family room. reconfigure kitchen and bath. replace windows @ entry and great room and increase sizeDetails
remove non bearing partition walls @ living/family room. reconfigure kitchen and bath. replace windows @ entry and great room and increase size | $25,000 |
| Dec 5, 2007 | Completed final sign-off Sep 2008 | 265 Vasquez Av | remove bearing wall and install beam; new kitchen finishes, cabinets on 2nd floor. 2 bath remodels, new fixtures, tile & lightingDetails
remove bearing wall and install beam; new kitchen finishes, cabinets on 2nd floor. 2 bath remodels, new fixtures, tile & lighting | $70,000 |
| Nov 7, 2007 | Completed final sign-off Jan 2009 | 267 Duncan St | rear 1 story add. and roof deck and remodel existing habitable room, kitchen, new full bath, bedroom 1st flr. relocate 3 exist windows, demo rear 1 story dining room with deck and part of east facing yard walls. new rear yard deck at gradeDetails
rear 1 story add. and roof deck and remodel existing habitable room, kitchen, new full bath, bedroom 1st flr. relocate 3 exist windows, demo rear 1 story dining room with deck and part of east facing yard walls. new rear yard deck at grade | $45,000 |
| Mar 7, 2007 | Completed final sign-off Jul 2007 | 2611 25th Av | replace kitchen bbinets, install new appliances, replace fixtures & tile in bathroom, move toilet repair dry rot at front window app.3-4 sq yds of stucco repair. replace in kind. lighting to comply w/t-24 energy codes.Details
replace kitchen bbinets, install new appliances, replace fixtures & tile in bathroom, move toilet repair dry rot at front window app.3-4 sq yds of stucco repair. replace in kind. lighting to comply w/t-24 energy codes. | $30,000 |
| Jun 6, 2006 | Completed final sign-off Sep 2006 | 109 Beaumont Av | remove fixtures & finishe in 2 bathrooms & install new fixtures, tile, & sheet rock.Details
remove fixtures & finishe in 2 bathrooms & install new fixtures, tile, & sheet rock. | $10,000 |
| Jul 14, 2005 | Completed final sign-off Mar 2006 | 3545 19th St | remodel kitchen & bath, widen window at hallwayDetails
remodel kitchen & bath, widen window at hallway | $16,000 |
| Apr 21, 2005 | Completed final sign-off Jul 2005 | 368 Corbett Av | remodel bath:new fixtures,surface,move door to hallway.open back of closet to bathroom.infillDetails
remodel bath:new fixtures,surface,move door to hallway.open back of closet to bathroom.infill | $20,000 |
| Dec 23, 2004 | Completed final sign-off Apr 2005 | 184 Gates St | remodel/update kitchen/bath, same location and sizeDetails
remodel/update kitchen/bath, same location and size | $50,000 |
| Oct 28, 2004 | Expired or cancelled expired May 2006 | 3282 Jackson St | install 1 skylight each in each bathroom. 2 skylights total.Details
install 1 skylight each in each bathroom. 2 skylights total. | $2,000 |
| Oct 14, 2004 | Expired or cancelled expired May 2006 | 3282 Jackson St | bathroom remodels. remove non bearing walls. provide new plumbing fixtures. electrical to be designDetails
bathroom remodels. remove non bearing walls. provide new plumbing fixtures. electrical to be design | $19,000 |
| Dec 30, 2002 | Completed final sign-off Sep 2003 | 318 Salinas Av | replace surfaces, cabinets, fixture + appiliances on 2nd flr in bath + kitchen. replace existing winDetails
replace surfaces, cabinets, fixture + appiliances on 2nd flr in bath + kitchen. replace existing win | $23,000 |
| Jul 8, 2002 | Completed final sign-off Sep 2002 | 325 Elizabeth St | remodel (e)bath,enlarge into launry rm, partition walls onlyDetails
remodel (e)bath,enlarge into launry rm, partition walls only | $12,000 |
| Jun 4, 2002 | Completed final sign-off Sep 2002 | 125 Los Palmos Dr | remodel existing bathroomsDetails
remodel existing bathrooms | $12,500 |
| Feb 22, 2002 | Completed final sign-off May 2002 | 172 32nd Av | remodel bathroom, remove tub, replace w/shower, new floor covering, remove bathrm door entry fm bedrDetails
remodel bathroom, remove tub, replace w/shower, new floor covering, remove bathrm door entry fm bedr | $18,000 |
| Dec 18, 2000 | Completed final sign-off May 2001 | 831 Ashbury St | kitchen & bathroom remodelDetails
kitchen & bathroom remodel | $18,000 |
| Sep 29, 2000 | Completed final sign-off Aug 2001 | 2 Joy St | bathroom addition-horizontal additionDetails
bathroom addition-horizontal addition | $40,000 |