Back to kitchen remodel contractors
Meneses Construction (Ck Id)
- Based in
- San Carlos
- On San Francisco permits
- Dec 2001 to Jan 2025
- Last 24 months
- 3 permits filed
136 permits since 2000: 99 completed, 1 in progress, 16 never finaled, 20 expired or cancelled.
Of the 16 never-finaled permits, 3 are 3 to 5 years old, 2 are 5 to 10 years old, 11 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
63 kitchen remodel permits: 46 completed, 5 never finaled, 12 expired or cancelled. Typically 0 days from filing to permit and 116 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 9, 2024 | Completed final sign-off May 2025 | 2865 Jackson St | unit#1 - kitchen and 2 bathroom remodeling. same size and location . make sure everthing is up to code. no removal of walls; no structural wk will be performed. install new recess lights throughout unit and move and upgrade subpanel.Details
unit#1 - kitchen and 2 bathroom remodeling. same size and location . make sure everthing is up to code. no removal of walls; no structural wk will be performed. install new recess lights throughout unit and move and upgrade subpanel. | $98,000 |
| Jul 11, 2023 | Completed final sign-off Mar 2024 | 458 29th St | replace new kitchen and cabinets, new stove, new hood, adnd new kitchen sinkDetails
replace new kitchen and cabinets, new stove, new hood, adnd new kitchen sink | $6,500 |
| Jan 29, 2020 | Completed final sign-off Sep 2021 | 591 Spruce St | residential remodel. remodel kitchen, bathrooms, and staircase on 2nd floor. relocate bathroom on ground floor. seismic strengtheningDetails
residential remodel. remodel kitchen, bathrooms, and staircase on 2nd floor. relocate bathroom on ground floor. seismic strengthening | $130,000 |
| Jan 11, 2019 | Completed final sign-off Mar 2023 | 1230 Polk St | ti demo (e) ramps, platforms & counter. new accesible lift. remodel bar area into kitchen areaDetails
ti demo (e) ramps, platforms & counter. new accesible lift. remodel bar area into kitchen area | $40,000 |
| Aug 15, 2017 | Completed final sign-off Apr 2018 | 86 Iris Av | unit 86 2nd fl: remodel kitchen and 2 baths with new cabinets, fixtures, finsihes, add 10 recessed lights in liv rmDetails
unit 86 2nd fl: remodel kitchen and 2 baths with new cabinets, fixtures, finsihes, add 10 recessed lights in liv rm | $30,000 |
| Aug 7, 2015 | Never finaled issued Mar 2016, no final | 462 Cambridge St | comply w/ nov 201542201,201555582,201517861. legalize 2nd unit on ground floor including 2 bedrooms, a full bath & kitchen, add storage on ground flr, add two windows @ rear, relocate water heater & furnace per ordinance 43-14 unit legalization.Details
comply w/ nov 201542201,201555582,201517861. legalize 2nd unit on ground floor including 2 bedrooms, a full bath & kitchen, add storage on ground flr, add two windows @ rear, relocate water heater & furnace per ordinance 43-14 unit legalization. | $40,000 |
| Feb 10, 2009 | Completed final sign-off Apr 2009 | 2 Lobos St | kitchen remodel. no structural changes.Details
kitchen remodel. no structural changes. | $29,000 |
| Jan 20, 2009 | Completed final sign-off Apr 2009 | 1020 Union St | work @ unit# 10 only. partial kitchen remodel. no structural work will be performed. replace some cabinets, counters.Details
work @ unit# 10 only. partial kitchen remodel. no structural work will be performed. replace some cabinets, counters. | $13,000 |
| Nov 13, 2008 | Completed final sign-off Apr 2009 | 711 Athens St | replace sheetrock on kitchen walls, run 6 new circuits, replace sink, replace countertop.Details
replace sheetrock on kitchen walls, run 6 new circuits, replace sink, replace countertop. | $2,800 |
| Aug 22, 2008 | Completed final sign-off Dec 2008 | 330 Point Lobos Av | kitchen remodel only. no structral work will be performed.Details
kitchen remodel only. no structral work will be performed. | $19,000 |
| Jun 11, 2008 | Completed final sign-off Aug 2008 | 61 Santa Ynez Av | kitchen remodel. no structural work will be performed. install only undercounter lights (flourescent).Details
kitchen remodel. no structural work will be performed. install only undercounter lights (flourescent). | $19,000 |
| Sep 26, 2007 | Expired or cancelled expired Aug 2008 | 442 Joost Av | kitchen remodel. no change in walls.Details
kitchen remodel. no change in walls. | $22,000 |
| Aug 21, 2007 | Completed final sign-off Oct 2007 | 386 Vienna St | kitchen remodel, no structural change. (n) lighting to be flourescent.Details
kitchen remodel, no structural change. (n) lighting to be flourescent. | $20,000 |
| Jul 25, 2007 | Completed final sign-off Sep 2007 | 1690 34th Av | kitchen remodel. no structural will be performed. lighting 50% will be fluorescent.Details
kitchen remodel. no structural will be performed. lighting 50% will be fluorescent. | $20,000 |
| Jul 12, 2007 | Completed final sign-off Oct 2007 | 765 Delano Av | kitchen remodel, no structural work will be performed 50% of lighting shall be florescsentDetails
kitchen remodel, no structural work will be performed 50% of lighting shall be florescsent | $18,000 |
| Jun 20, 2007 | Completed final sign-off Sep 2007 | 416 Molimo Dr | kitchen remodel, no structural work will be performedDetails
kitchen remodel, no structural work will be performed | $18,000 |
| Feb 6, 2007 | Completed final sign-off May 2007 | 500 Ulloa St | kitchen remodel, no structural changes. no new lighting. replace two windows, same openings.Details
kitchen remodel, no structural changes. no new lighting. replace two windows, same openings. | $24,000 |
| Feb 6, 2007 | Completed final sign-off Jul 2007 | 5041 California St | kitchen remodel, no structural changes. no new lighting.Details
kitchen remodel, no structural changes. no new lighting. | $14,000 |
| Nov 29, 2006 | Completed final sign-off Apr 2007 | 2507 Polk St | kitchen remodel. structural work will be performed. wattage of light fixtures to be 50% flourescentDetails
kitchen remodel. structural work will be performed. wattage of light fixtures to be 50% flourescent | $17,000 |
| Jul 25, 2006 | Completed final sign-off Nov 2006 | 431 Dolores St | kitchen remodel and bathroom installation (no structural work will be performed) all plumbing fixtures in same location.Details
kitchen remodel and bathroom installation (no structural work will be performed) all plumbing fixtures in same location. | $34,000 |
| Jul 21, 2006 | Completed final sign-off Oct 2006 | 225 Masonic Av | kitchen remodel. no structural work. replace in kind or better. no walls built moved. 50% lighting to be flourescent.Details
kitchen remodel. no structural work. replace in kind or better. no walls built moved. 50% lighting to be flourescent. | $14,000 |
| May 3, 2006 | Completed final sign-off Jul 2006 | 943 Clayton St | kitchen remodel. no structural changes on 1/f over garage.Details
kitchen remodel. no structural changes on 1/f over garage. | $14,000 |
| May 3, 2006 | Completed final sign-off Nov 2006 | 26 St Marys Av | kitchen remodel: no structural changes (2nd floor)Details
kitchen remodel: no structural changes (2nd floor) | $11,000 |
| Mar 7, 2006 | Completed final sign-off Apr 2006 | 447 Hoffman Av | kitchen remodel, no structural work will be performed.cabinets,counters,minor electrical & plumbingDetails
kitchen remodel, no structural work will be performed.cabinets,counters,minor electrical & plumbing | $16,000 |
| Feb 22, 2006 | Completed final sign-off Dec 2006 | 4012 Judah St | kitchen and bath remodel. no structural work will be performed.Details
kitchen and bath remodel. no structural work will be performed. | $30,000 |
| Jan 31, 2006 | Completed final sign-off May 2006 | 1963 Quesada Av | kitchen remodel. no structural work will be performed. no new lighting. no new walls or windows.Details
kitchen remodel. no structural work will be performed. no new lighting. no new walls or windows. | $14,000 |
| Jan 12, 2006 | Completed final sign-off Mar 2006 | 1795 48th Av | kitchen remodel, no structural work will be performed. no new lighting.Details
kitchen remodel, no structural work will be performed. no new lighting. | $17,000 |
| Oct 31, 2005 | Completed final sign-off Feb 2006 | 134 10th Av | kitchen remodel, some elec work, some plumbing, no structural to be performed. all in kitchen areaDetails
kitchen remodel, some elec work, some plumbing, no structural to be performed. all in kitchen area | $18,000 |
| Oct 20, 2005 | Completed final sign-off Oct 2006 | 410 Gellert Dr | kitchen remodel,some electrical,plumbing,drywall in kitchen.replace window same opening in kitchen.no structural work will be performedDetails
kitchen remodel,some electrical,plumbing,drywall in kitchen.replace window same opening in kitchen.no structural work will be performed | $21,000 |
| Oct 20, 2005 | Completed final sign-off Jan 2006 | 578 Monterey Bl | kitchen remodel no structural work, will be performed, some electrical, some plumbing, change linoleum floor, and drywall in the kitchenDetails
kitchen remodel no structural work, will be performed, some electrical, some plumbing, change linoleum floor, and drywall in the kitchen | $18,000 |
| Sep 29, 2005 | Completed final sign-off Dec 2005 | 2932 Gough St | replace all cabinets in kitchen , replace hardwood floor,sink,faucet,dish,gas into cab,faucet pipes from wall to base,plaster in kitchen w/shtrk,insulate wall/ceiling,refrig water line,6 under cntr ligts,switches,10 recessed lights,3way switch,8 new circuits,all work in kitchen,no strucDetails
replace all cabinets in kitchen , replace hardwood floor,sink,faucet,dish,gas into cab,faucet pipes from wall to base,plaster in kitchen w/shtrk,insulate wall/ceiling,refrig water line,6 under cntr ligts,switches,10 recessed lights,3way switch,8 new circuits,all work in kitchen,no struc | $9,000 |
| Aug 31, 2005 | Expired or cancelled expired Jul 2006 | 42 Vernon St | kitchen remodel,no structural,replace cabinet,countertop,modify plumbing for new sink,install gasDetails
kitchen remodel,no structural,replace cabinet,countertop,modify plumbing for new sink,install gas | $17,000 |
| Aug 31, 2005 | Expired or cancelled expired Jun 2014 | 1335 Union St | #5-kitchen remodel,no structural,replace cabinet,countertop,modify plumbing for new sink,install gasDetails
#5-kitchen remodel,no structural,replace cabinet,countertop,modify plumbing for new sink,install gas | $15,000 |
| Jul 25, 2005 | Completed final sign-off Nov 2005 | 164 06th Av | kitchen remodel, no structural work, replace cabs, sink, faucet, change the flr from vinyl to tile,Details
kitchen remodel, no structural work, replace cabs, sink, faucet, change the flr from vinyl to tile, | $15,000 |
| Jul 20, 2005 | Completed final sign-off Nov 2005 | 422 Russia Av | kitchen remodel. no structural work. replace cabinets,countertop,modify drain,hot/cold valves, runDetails
kitchen remodel. no structural work. replace cabinets,countertop,modify drain,hot/cold valves, run | $17,000 |
| Jul 20, 2005 | Completed final sign-off Sep 2005 | 152 Lombard St | kitchen remodel, no structural, replace cabinets, sink, dishwasher, microwave,Details
kitchen remodel, no structural, replace cabinets, sink, dishwasher, microwave, | $15,000 |
| Jul 6, 2005 | Completed final sign-off Jan 2006 | 1944 11th Av | remodel kitchen interior work, no structural work to be performed.Details
remodel kitchen interior work, no structural work to be performed. | $19,000 |
| Jul 6, 2005 | Completed final sign-off Jan 2006 | 2185 Bush St | kitchen remodel and interior electrical work at unit #310Details
kitchen remodel and interior electrical work at unit #310 | $12,000 |
| Jun 14, 2005 | Completed final sign-off Dec 2005 | 44 Hopkins Av | kitchen remodel (no structural) replace cabinets, countertop, floor, waterline for refrigerator, modDetails
kitchen remodel (no structural) replace cabinets, countertop, floor, waterline for refrigerator, mod | $15,000 |
| Jun 13, 2005 | Expired or cancelled expired Feb 2008 | 65 Ora Wy | kitchen remodel, replace cabinets, counter top. electrical fixtures.Details
kitchen remodel, replace cabinets, counter top. electrical fixtures. | $12,000 |
| Jun 13, 2005 | Never finaled issued Jun 2005, no final | 1325 Divisadero St | kitchen remodel no struc. replace cabinets, countertop, sink, faucet, modify gas line, replace 3Details
kitchen remodel no struc. replace cabinets, countertop, sink, faucet, modify gas line, replace 3 | $9,000 |
| Jun 10, 2005 | Completed final sign-off Oct 2005 | 2621 Sutter St | kitchen remodel no structural. replace cabinets, countertop, run gas line into cabinet,Details
kitchen remodel no structural. replace cabinets, countertop, run gas line into cabinet, | $14,000 |
| May 12, 2005 | Completed final sign-off Oct 2005 | 900 Bush St | kitchen remodel, replace cabs, in unit no. 608 countertop, install 3 undercounter lights, two circuiDetails
kitchen remodel, replace cabs, in unit no. 608 countertop, install 3 undercounter lights, two circui | $11,000 |
| Apr 27, 2005 | Expired or cancelled expired Feb 2006 | 769 Lakeview Av | remodel kitchen, replace cabinets, countertop, replace sink, faucet, modify gas line, modify wiringDetails
remodel kitchen, replace cabinets, countertop, replace sink, faucet, modify gas line, modify wiring | $17,000 |
| Apr 12, 2005 | Completed final sign-off Oct 2005 | 5150 Diamond Heights Bl | kitchen remodel/replace cabinets/counter top/ sink/ floor to tile/lower drain /add 2 new circuitsDetails
kitchen remodel/replace cabinets/counter top/ sink/ floor to tile/lower drain /add 2 new circuits | $11,000 |
| Apr 8, 2005 | Expired or cancelled expired Mar 2006 | 12 Sumner St | remodel kitchen,cabinets,countertops,water line,drains,hot/cold valves,run gasline,undercounter lighDetails
remodel kitchen,cabinets,countertops,water line,drains,hot/cold valves,run gasline,undercounter ligh | $17,000 |
| Mar 3, 2005 | Completed final sign-off Feb 2008 | 83 Pope St | rear addition at second floor level (13.5'x20') and interior remodel. move dining rm and kitchen to 1st floor.Details
rear addition at second floor level (13.5'x20') and interior remodel. move dining rm and kitchen to 1st floor. | $60,000 |
| Feb 24, 2005 | Completed final sign-off Oct 2005 | 12 Sumner St | remodel kitchen-replace cabinets, countertop.plumbing.install 2 undercounter lights,electrical.Details
remodel kitchen-replace cabinets, countertop.plumbing.install 2 undercounter lights,electrical. | $17,000 |
| Feb 24, 2005 | Completed final sign-off Jul 2005 | 1050 North Point St | remodel kitchen-replace cabinets,sink,countertop,linolium fl.new circuit for microwave &move 1 outleDetails
remodel kitchen-replace cabinets,sink,countertop,linolium fl.new circuit for microwave &move 1 outle | $18,000 |
| Jan 25, 2005 | Never finaled issued Jan 2005, no final | 1776 Sacramento St | install new kitchen cabs, add one (1) elec outlet; install gas shut-off valve inside new cabs per coDetails
install new kitchen cabs, add one (1) elec outlet; install gas shut-off valve inside new cabs per co | $7,500 |
| Jan 20, 2005 | Expired or cancelled expired Feb 2022 | 2790 19th Av | remodel kitchen.Details
remodel kitchen. | $28,000 |
| Jan 7, 2005 | Completed final sign-off Mar 2005 | 1316 10th Av | bath replace tub w/shower. sink, toilet, kitchen - countertop, cabs & flooringDetails
bath replace tub w/shower. sink, toilet, kitchen - countertop, cabs & flooring | $45,000 |
| Dec 16, 2004 | Never finaled issued Dec 2004, no final | 39 Rolph St | remodel kitchen,change electrical upto code,move plumbing & gas line.no structural workDetails
remodel kitchen,change electrical upto code,move plumbing & gas line.no structural work | $19,000 |
| Dec 6, 2004 | Completed final sign-off Mar 2005 | 1719 34th Av | kitchen remodel, new circuits for garbage disposal, gfci, dishwasher, refrig, lower drain, move gasDetails
kitchen remodel, new circuits for garbage disposal, gfci, dishwasher, refrig, lower drain, move gas | $19,000 |
| Sep 23, 2004 | Expired or cancelled expired Dec 2009 | 235 Bella Vista Wy | kitchen remodel, lighting.Details
kitchen remodel, lighting. | $26,000 |
| Sep 23, 2004 | Expired or cancelled expired May 2006 | 548 Plymouth Av | remodel kitchen & lighting, electricalDetails
remodel kitchen & lighting, electrical | $24,000 |
| Aug 23, 2004 | Expired or cancelled expired Jan 2006 | 1258 02nd Av | replace cabinets & counter top in kitchen on 2nd fl. no structural changes.Details
replace cabinets & counter top in kitchen on 2nd fl. no structural changes. | $18,000 |
| Aug 12, 2004 | Completed final sign-off Feb 2005 | 4050 Folsom St | kitchen remodel- remove/replace cabs, countertop add two light switches, 8 gfi outlets, 7 new circuiDetails
kitchen remodel- remove/replace cabs, countertop add two light switches, 8 gfi outlets, 7 new circui | $18,000 |
| Aug 11, 2004 | Never finaled issued Aug 2004, no final | 1403 34th Av | remove/replace kitchen cabinets,countertop,install 2 new gfi's,install wiring for ventless hood,Details
remove/replace kitchen cabinets,countertop,install 2 new gfi's,install wiring for ventless hood, | $18,500 |
| Jun 16, 2004 | Expired or cancelled expired Sep 2016 | 252 Rolph St | remove & replace kitchen cabs, remove & install countertop install one under counter flourescent ligDetails
remove & replace kitchen cabs, remove & install countertop install one under counter flourescent lig | $15,000 |
| Jun 16, 2004 | Expired or cancelled expired Apr 2006 | 2075 Sutter St | remove & replace kitchen cabs& countertopDetails
remove & replace kitchen cabs& countertop | $9,000 |
| Nov 20, 2003 | Completed final sign-off Feb 2004 | 2934 Gough St | will be taking off extng kitchen cabinets putting new onewup will move outlets & switches & changingDetails
will be taking off extng kitchen cabinets putting new onewup will move outlets & switches & changing | $18,000 |
| Aug 8, 2003 | Completed final sign-off Dec 2003 | 165 Villa Tr | replace existing kitchen cabs, put all kitchen outlets up to code, sheetrck areas where sheetrck damDetails
replace existing kitchen cabs, put all kitchen outlets up to code, sheetrck areas where sheetrck dam | $12,000 |