Back to bathroom remodel contractors
Meneses Construction (Ck Id)
- Based in
- San Carlos
- On San Francisco permits
- Dec 2001 to Jan 2025
- Last 24 months
- 3 permits filed
136 permits since 2000: 99 completed, 1 in progress, 16 never finaled, 20 expired or cancelled.
Of the 16 never-finaled permits, 3 are 3 to 5 years old, 2 are 5 to 10 years old, 11 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
17 bathroom remodel permits: 14 completed, 1 in progress, 2 never finaled. Typically 0 days from filing to permit and 142 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 9, 2024 | Completed final sign-off May 2025 | 2865 Jackson St | unit#1 - kitchen and 2 bathroom remodeling. same size and location . make sure everthing is up to code. no removal of walls; no structural wk will be performed. install new recess lights throughout unit and move and upgrade subpanel.Details
unit#1 - kitchen and 2 bathroom remodeling. same size and location . make sure everthing is up to code. no removal of walls; no structural wk will be performed. install new recess lights throughout unit and move and upgrade subpanel. | $98,000 |
| Oct 26, 2023 | In progress filed Oct 2023, not yet issued | 458 29th St | first floor bedroom bathroom sink replacement and vanity. 2nd flr batroom sink replacement and wall lights. 2 gfci outlets. intall about 4 pieces of drywall at ceiling.Details
first floor bedroom bathroom sink replacement and vanity. 2nd flr batroom sink replacement and wall lights. 2 gfci outlets. intall about 4 pieces of drywall at ceiling. | $300 |
| Jan 29, 2020 | Completed final sign-off Sep 2021 | 591 Spruce St | residential remodel. remodel kitchen, bathrooms, and staircase on 2nd floor. relocate bathroom on ground floor. seismic strengtheningDetails
residential remodel. remodel kitchen, bathrooms, and staircase on 2nd floor. relocate bathroom on ground floor. seismic strengthening | $130,000 |
| Jan 23, 2019 | Completed final sign-off Dec 2019 | 255 Arleta Av | ground floor alteration. relocate extg bathroom and enlarge extg garage.Details
ground floor alteration. relocate extg bathroom and enlarge extg garage. | $10,000 |
| Jan 30, 2018 | Never finaled issued Jan 2018, no final | 2060 Sutter St | #306: bathroom remodel - replace tub, install new pressure valve, tile shower walls andtwo recess lights above tub and new switch. no structural work iwll be performed.Details
#306: bathroom remodel - replace tub, install new pressure valve, tile shower walls andtwo recess lights above tub and new switch. no structural work iwll be performed. | $5,600 |
| Aug 15, 2017 | Completed final sign-off Apr 2018 | 86 Iris Av | unit 86 2nd fl: remodel kitchen and 2 baths with new cabinets, fixtures, finsihes, add 10 recessed lights in liv rmDetails
unit 86 2nd fl: remodel kitchen and 2 baths with new cabinets, fixtures, finsihes, add 10 recessed lights in liv rm | $30,000 |
| Sep 21, 2016 | Completed final sign-off Mar 2018 | 1635 Plymouth Av | legalize utility room and bathroom on 1st floor level. to comply with nov #201630671Details
legalize utility room and bathroom on 1st floor level. to comply with nov #201630671 | $25,000 |
| Aug 7, 2015 | Never finaled issued Mar 2016, no final | 462 Cambridge St | comply w/ nov 201542201,201555582,201517861. legalize 2nd unit on ground floor including 2 bedrooms, a full bath & kitchen, add storage on ground flr, add two windows @ rear, relocate water heater & furnace per ordinance 43-14 unit legalization.Details
comply w/ nov 201542201,201555582,201517861. legalize 2nd unit on ground floor including 2 bedrooms, a full bath & kitchen, add storage on ground flr, add two windows @ rear, relocate water heater & furnace per ordinance 43-14 unit legalization. | $40,000 |
| Jun 9, 2009 | Completed final sign-off Aug 2009 | 550 Sweeny St | bathroom remodel only-no structural changesDetails
bathroom remodel only-no structural changes | $18,000 |
| Jan 4, 2008 | Completed final sign-off May 2008 | 666 Post St | 1 bathroom remodel. no structural work will be performed.Details
1 bathroom remodel. no structural work will be performed. | $18,000 |
| Oct 18, 2007 | Completed final sign-off Jan 2008 | 1690 34th Av | bathroom remodel. no structural changes. lighting change will comply with t-24.Details
bathroom remodel. no structural changes. lighting change will comply with t-24. | $22,000 |
| Jul 25, 2006 | Completed final sign-off Nov 2006 | 431 Dolores St | kitchen remodel and bathroom installation (no structural work will be performed) all plumbing fixtures in same location.Details
kitchen remodel and bathroom installation (no structural work will be performed) all plumbing fixtures in same location. | $34,000 |
| Feb 22, 2006 | Completed final sign-off Dec 2006 | 4012 Judah St | kitchen and bath remodel. no structural work will be performed.Details
kitchen and bath remodel. no structural work will be performed. | $30,000 |
| Nov 17, 2005 | Completed final sign-off Feb 2006 | 226 Lake Merced Hill No Bl | bath remodel and relocation of washer and dryer. no structural work will be performed.Details
bath remodel and relocation of washer and dryer. no structural work will be performed. | $11,000 |
| Aug 31, 2005 | Completed final sign-off Jan 2006 | 1944 11th Av | bath remodel, no structural, modify plumbing for shower, tub, vanity drain same location andDetails
bath remodel, no structural, modify plumbing for shower, tub, vanity drain same location and | $18,000 |
| Jan 7, 2005 | Completed final sign-off Mar 2005 | 1316 10th Av | bath replace tub w/shower. sink, toilet, kitchen - countertop, cabs & flooringDetails
bath replace tub w/shower. sink, toilet, kitchen - countertop, cabs & flooring | $45,000 |
| May 6, 2004 | Completed final sign-off May 2004 | 2522 Quint St | change window and replace tile in bathroom windows not visible from streetDetails
change window and replace tile in bathroom windows not visible from street | $3,000 |