Meneses Construction (Ck Id)
- Based in
- San Carlos
- On San Francisco permits
- Dec 2001 to Jan 2025
- Last 24 months
- 3 permits filed
136 permits since 2000: 99 completed, 1 in progress, 16 never finaled, 20 expired or cancelled.
Of the 16 never-finaled permits, 3 are 3 to 5 years old, 2 are 5 to 10 years old, 11 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 2 completed, 2 never finaled. Typically 0 days from filing to permit and 289 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 9, 2023 | Never finaled filed Aug 2023, never issued | 3072 24th St | to comply with his nov #202302371 dated 4/6/2023, item #2, provide hand rails @ rear stairsDetails
to comply with his nov #202302371 dated 4/6/2023, item #2, provide hand rails @ rear stairs | $2,500 |
| Nov 3, 2022 | Never finaled issued Nov 2022, no final | 1055 Ingerson Av | replace (10) windows, replace / repair siding (in kind) at sides and rear, less than 50% repair of stairs in-kind: (3) front steps and (3) steps back of house. to address complaint 202298080Details
replace (10) windows, replace / repair siding (in kind) at sides and rear, less than 50% repair of stairs in-kind: (3) front steps and (3) steps back of house. to address complaint 202298080 | $9,000 |
| Apr 16, 2021 | Completed final sign-off Apr 2021 | 57 Oakwood St | unit #5g: repair dry rot, same kind for 6 steps out 14 steps and caement 12x12 landing; repair less tahn 50% of stair.Details
unit #5g: repair dry rot, same kind for 6 steps out 14 steps and caement 12x12 landing; repair less tahn 50% of stair. | $9,200 |
| Jan 29, 2020 | Completed final sign-off Sep 2021 | 591 Spruce St | residential remodel. remodel kitchen, bathrooms, and staircase on 2nd floor. relocate bathroom on ground floor. seismic strengtheningDetails
residential remodel. remodel kitchen, bathrooms, and staircase on 2nd floor. relocate bathroom on ground floor. seismic strengthening | $130,000 |