Block 7531, lot 123
65 Ora Wy
- City’s use
- Single Family Residential
- Built
- 1975
- Stories
- 1
- Units
- 1
- Rooms
- 1 bedroom, 1 bathroom
- Building
- 684 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
14 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 30, 2025 | In progress issued Sep 2025 | 65 Ora Wy | Fidelity Roof Company | re roofing: no hot works.Details
re roofing: no hot works. | $62,968 |
| Jun 17, 2016 | Completed final sign-off Sep 2016 | 65 Ora Wy | Sequoia Construction Services Inc | reroofingDetails
reroofing | $30,000 |
| Feb 4, 2014 | Completed final sign-off Jul 2014 | 65 Ora Wy | Hong Lee Construction Co | remodel one kitchen and one bathroom. replace in kind.Details
remodel one kitchen and one bathroom. replace in kind. | $18,000 |
| May 4, 2012 | Completed final sign-off Oct 2012 | 65 Ora Wy | Siemens Industry, Inc. | additoin of a fire alarm system with 58 alarm initiating devices, 20 indicating devices,a graphic annunciator, 48 exisitng mini-horns & 1 existing strobe will be connected onto the new system, work to be done for 'common area'the fire alarm system is for both bldg 65 & bldg 75.Details
additoin of a fire alarm system with 58 alarm initiating devices, 20 indicating devices,a graphic annunciator, 48 exisitng mini-horns & 1 existing strobe will be connected onto the new system, work to be done for 'common area'the fire alarm system is for both bldg 65 & bldg 75. | $45,000 |
| Aug 13, 2008 | Completed final sign-off Nov 2008 | 65 Ora Wy | Community Reconstruction Solutions | remove and replace bedroom & living room windows (total 4)Details
remove and replace bedroom & living room windows (total 4) | $3,000 |
| Mar 4, 2008 | Completed final sign-off Aug 2008 | 65 Ora Wy | Bay City Boiler & Engineering Co. Inc. | renew pa# 200702013073 & 200610306378Details
renew pa# 200702013073 & 200610306378 | |
| Jan 7, 2008 | Completed final sign-off Feb 2008 | 65 Ora Wy | Community Reconstruction Solutions | work on comment area under lot #123 to lot #146. remove and replace wall shingles at north side elevation side in kind. no structural work.Details
work on comment area under lot #123 to lot #146. remove and replace wall shingles at north side elevation side in kind. no structural work. | $10,000 |
| Feb 1, 2007 | Expired or cancelled expired Oct 2007 | 65 Ora Wy | Bay City Boiler & Engineering Co. Inc. | revision to approved pa# 200610306378-modify platform supporting water heater.Details
revision to approved pa# 200610306378-modify platform supporting water heater. | $500 |
| Oct 30, 2006 | Expired or cancelled expired Oct 2007 | 65 Ora Wy | Bay City Boiler & Engineering Co. Inc. | modify (e) boiler support playform per structural emgineer drawings. comply with nov# 200670167.Details
modify (e) boiler support playform per structural emgineer drawings. comply with nov# 200670167. | $2,500 |
| Jun 13, 2005 | Expired or cancelled expired Feb 2008 | 65 Ora Wy | Meneses Construction (Ck Id) | kitchen remodel, replace cabinets, counter top. electrical fixtures.Details
kitchen remodel, replace cabinets, counter top. electrical fixtures. | $12,000 |
| Feb 24, 2003 | Expired or cancelled expired Jan 2008 | 65 Ora Wy | Mullins General Construction & Fine Pain | replace dry rot damaged trim & siding on exterior of bldg.area is approx 500 sq ft & all work is toDetails
replace dry rot damaged trim & siding on exterior of bldg.area is approx 500 sq ft & all work is to | $9,500 |
| Feb 18, 2003 | Completed final sign-off Aug 2003 | 65 Ora Wy | J M S Construction | carports 11, 12 replace wood carports with aluminumDetails
carports 11, 12 replace wood carports with aluminum | $50,000 |
| Jun 12, 2002 | Completed final sign-off Sep 2002 | 65 Ora Wy | fill core holes in concrete slab w/ fire retardant insulation per n.o.v.#200228971.Details
fill core holes in concrete slab w/ fire retardant insulation per n.o.v.#200228971. | $500 | |
| Feb 27, 2001 | Completed final sign-off Apr 2001 | 65 Ora Wy | Mullins General Construction & Fine Pain | remove dry rot damaged trim & siding from north common area hallway (3 flr) replace framing membersDetails
remove dry rot damaged trim & siding from north common area hallway (3 flr) replace framing members | $15,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bay City Boiler & Engineering Co. Inc. (3), Community Reconstruction Solutions (2), Mullins General Construction & Fine Pain (2), Fidelity Roof Company, Hong Lee Construction Co, J M S Construction, Meneses Construction (Ck Id), Sequoia Construction Services Inc, Siemens Industry, Inc.
- Architects
- H J Brunnier Assoc H J Brunnier Associates
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.