172 permits since 2000: 125 completed, 14 in progress, 28 never finaled, 5 expired or cancelled.
Of the 28 never-finaled permits, 7 are 3 to 5 years old, 8 are 5 to 10 years old, 13 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
53 kitchen remodel permits: 40 completed, 4 in progress, 8 never finaled, 1 expired or cancelled. Typically 1 days from filing to permit and 212 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 10, 2026 | In progress issued Sep 2026 | 24 Presidio Av | unit 24: remove kitchen countertop & replace, paint kitchen cabinets, refinish upper floor hardwood floors & stairs, install new can lighting & switches, patch a finish drywall, paint entire unit, no structural work or removing walls.Details
unit 24: remove kitchen countertop & replace, paint kitchen cabinets, refinish upper floor hardwood floors & stairs, install new can lighting & switches, patch a finish drywall, paint entire unit, no structural work or removing walls. | $170,000 |
| Feb 25, 2026 | In progress issued Feb 2026 | 160 05th Av | remove & replace countertop in kitchen, install new hardwood floor at entryway & refinish (e), new paint on both interior level. no structural work.Details
remove & replace countertop in kitchen, install new hardwood floor at entryway & refinish (e), new paint on both interior level. no structural work. | $80,400 |
| Jan 23, 2026 | Completed final sign-off Aug 2026 | 2019 Green St | demo fixtures and finishes in 2 existing bathrooms. install new fixtures and finishes in 2 existing bathrooms. fixtures to be replace to current locations. no structural work. demo kitchen countertops and backsplash and replace . all in kindDetails
demo fixtures and finishes in 2 existing bathrooms. install new fixtures and finishes in 2 existing bathrooms. fixtures to be replace to current locations. no structural work. demo kitchen countertops and backsplash and replace . all in kind | $166,000 |
| Apr 9, 2025 | In progress issued Apr 2025 | 233 Parker Av | to comply with nov# 202428823: do repairs in units 203, 204, 303, 304, & 400 due to fire damage. repairs kitchen and bathrooms in-kind.Details
to comply with nov# 202428823: do repairs in units 203, 204, 303, 304, & 400 due to fire damage. repairs kitchen and bathrooms in-kind. | $250,000 |
| Oct 9, 2024 | Completed final sign-off Aug 2025 | 1466 07th Av | revision to 202206236955. reduced scope at proposed adu. existing kitchen to remain existing mudroom and closet to remain. existing windows to remain. no structural changes.Details
revision to 202206236955. reduced scope at proposed adu. existing kitchen to remain existing mudroom and closet to remain. existing windows to remain. no structural changes. | |
| Sep 25, 2024 | In progress issued Jun 2025 | 70 St Marys Av | ab1114: horizontal addition to add second residential unit at front of lot. remodel of (e) cottage kitchen, add entry room to cottage. raise portions of roof of (e) cottage. new connecting corridor between residential units.Details
ab1114: horizontal addition to add second residential unit at front of lot. remodel of (e) cottage kitchen, add entry room to cottage. raise portions of roof of (e) cottage. new connecting corridor between residential units. | $250,000 |
| Apr 3, 2024 | Completed final sign-off Feb 2025 | 840 Lake St | unit 3 - remodel bathroom, new kitchen countertops, tile backsplash and drawer/door fronts. refinish hardwood floors and paint unit interior. all in kindDetails
unit 3 - remodel bathroom, new kitchen countertops, tile backsplash and drawer/door fronts. refinish hardwood floors and paint unit interior. all in kind | $130,000 |
| Mar 27, 2024 | Completed final sign-off Jan 2025 | 184 Aptos Av | remodel (e) kitchen & pantry area. replace kitchen window & rear facing pantry window with new exterior door w an opening protective device to prevent door from opening. opening to lead onto deck under sep permit 202405061498Details
remodel (e) kitchen & pantry area. replace kitchen window & rear facing pantry window with new exterior door w an opening protective device to prevent door from opening. opening to lead onto deck under sep permit 202405061498 | $100,000 |
| Mar 11, 2024 | Completed final sign-off Apr 2024 | 540 El Camino Del Mar | remove kitchen countertops & install new tops, 2 new kitchen sinks & faucets, refinish hardwood floors on 2nd level, paint kitchen, playroom cabinets, landing and 2 bedrooms. all work in kitchen is replace in like kind.Details
remove kitchen countertops & install new tops, 2 new kitchen sinks & faucets, refinish hardwood floors on 2nd level, paint kitchen, playroom cabinets, landing and 2 bedrooms. all work in kitchen is replace in like kind. | $100,000 |
| Mar 7, 2024 | Completed final sign-off Apr 2026 | 100 Judah St | expansion and remodel of basement: new powder room, gym, storage, mech room & laundry closet. 1 nw window, 1st floor kitchen remodel, demo & rebuild of extg sunrm & utility rooms, new powder room & pantry. 1 nw window. 2nd fl: remodel, 2 nw full bathrooms, 3rd fl remodel: 2 nw full baths & laundryDetails
expansion and remodel of basement: new powder room, gym, storage, mech room & laundry closet. 1 nw window, 1st floor kitchen remodel, demo & rebuild of extg sunrm & utility rooms, new powder room & pantry. 1 nw window. 2nd fl: remodel, 2 nw full bathrooms, 3rd fl remodel: 2 nw full baths & laundry | $450,000 |
| Jan 11, 2024 | Completed final sign-off May 2024 | 2123 33rd Av | in-kind remodeling of 1 kitchen(s) in 1st flDetails
in-kind remodeling of 1 kitchen(s) in 1st fl | $59,600 |
| Dec 21, 2023 | Completed final sign-off Oct 2024 | 257 Brentwood Av | interior remodel at 2nd floor - remodel kitchen, pantry, and powder room. exterior - replace kitchen window (not street facing-rear).Details
interior remodel at 2nd floor - remodel kitchen, pantry, and powder room. exterior - replace kitchen window (not street facing-rear). | $60,000 |
| Feb 3, 2023 | Never finaled issued Feb 2023, no final | 611 02nd Av | repair walls and celing in kitchen area due to leak in roof install new tile back splash refinish kitchen hardwood floor install new under cab lights, paint.Details
repair walls and celing in kitchen area due to leak in roof install new tile back splash refinish kitchen hardwood floor install new under cab lights, paint. | $20,000 |
| Sep 29, 2021 | Never finaled issued Feb 2022, no final | 634 27th Av | interior remodel. 1/f: replace stairs, develop habitable area, new bathroom, half bath, guest bedroom, family room and 2 storage. 2/f: remodel kitchen relocate half bath. 3/f: add new bathroom, upgrade (e) bath, fixtures and finishes. relocate master closet.Details
interior remodel. 1/f: replace stairs, develop habitable area, new bathroom, half bath, guest bedroom, family room and 2 storage. 2/f: remodel kitchen relocate half bath. 3/f: add new bathroom, upgrade (e) bath, fixtures and finishes. relocate master closet. | $425,000 |
| Feb 5, 2021 | Completed final sign-off Jul 2023 | 2361 Bryant St | interior remodels on 2/f & 3/f: remodel kitchens, remove wall between ktichen & living room; remodel bathrooms add 3/4 bathrooms. new skylights.Details
interior remodels on 2/f & 3/f: remodel kitchens, remove wall between ktichen & living room; remodel bathrooms add 3/4 bathrooms. new skylights. | $75,000 |
| Sep 24, 2020 | Completed final sign-off May 2021 | 254 Day St | remodel kitchen, new door in front, countertops & paint. add new light fixtures, new cabinets in the living room, family room, wine room, and gym. add new tile to kitchen backsplash and foyer room. paint interior and exterior of the house.Details
remodel kitchen, new door in front, countertops & paint. add new light fixtures, new cabinets in the living room, family room, wine room, and gym. add new tile to kitchen backsplash and foyer room. paint interior and exterior of the house. | $150,000 |
| Sep 17, 2020 | Completed final sign-off Apr 2021 | 2236 15th St | install new kitchen cabinets, counter tops, hardwood floors, appliances, plumbing fixrures and paint. all work in kind.Details
install new kitchen cabinets, counter tops, hardwood floors, appliances, plumbing fixrures and paint. all work in kind. | $60,000 |
| Sep 17, 2020 | Never finaled issued Sep 2020, no final | 630 27th Av | install new kitchen cabinets, counter tops, hardwood floors, appliances, plumbing fixtures and paint. all work in kind.Details
install new kitchen cabinets, counter tops, hardwood floors, appliances, plumbing fixtures and paint. all work in kind. | $40,000 |
| Jun 19, 2020 | Completed final sign-off May 2023 | 725 Florida St | unit 2 e aka #10 - remodel two existing bathrooms & kitchen like for like. paint entire unit. the downstairs bathroom is approximately 10¿ x 8¿ on the upstairs bathroom is approximately 8¿ 6¿ x 8¿. no plans. must comply with sffc sec 1103.7.6.1 fire alarm under sep permit.Details
unit 2 e aka #10 - remodel two existing bathrooms & kitchen like for like. paint entire unit. the downstairs bathroom is approximately 10¿ x 8¿ on the upstairs bathroom is approximately 8¿ 6¿ x 8¿. no plans. must comply with sffc sec 1103.7.6.1 fire alarm under sep permit. | $300,000 |
| Jan 21, 2020 | Completed final sign-off May 2020 | 538 29th St | kitchen remodel at main floor, infill at family room, at rearDetails
kitchen remodel at main floor, infill at family room, at rear | $45,000 |
| Oct 31, 2019 | Completed final sign-off Oct 2021 | 70 Commonwealth Av | counter tops and appliances. install new kitchen cabinets, counter tops and paint interior of kitchen. install new under cabinet lights. no structural work to be performedDetails
counter tops and appliances. install new kitchen cabinets, counter tops and paint interior of kitchen. install new under cabinet lights. no structural work to be performed | $50,000 |
| Oct 30, 2018 | Completed final sign-off Mar 2019 | 146 02nd Av | install new counter tops, back splash, refinish floors, install washer and dryer and kitchen appliances.Details
install new counter tops, back splash, refinish floors, install washer and dryer and kitchen appliances. | $50,000 |
| Oct 18, 2018 | Completed final sign-off Jan 2020 | 1443 Francisco St | 3rd floor: relocate kitchen, remodel bathroom, and add new bathroom.Details
3rd floor: relocate kitchen, remodel bathroom, and add new bathroom. | $46,000 |
| Sep 11, 2018 | Completed final sign-off May 2019 | 30 Rockaway Av | remodel kitchen on 2nd fl. new cabinets, hardwood floors, plumbing fixtures, tile, countertops, electrical, paint. no structural work. everything in same location. no moving of doors or walls.Details
remodel kitchen on 2nd fl. new cabinets, hardwood floors, plumbing fixtures, tile, countertops, electrical, paint. no structural work. everything in same location. no moving of doors or walls. | $35,000 |
| Aug 11, 2017 | Completed final sign-off Dec 2021 | 1253 Guerrero St | reary yard addition. 2 story tall for remodel kitchen & new deck.Details
reary yard addition. 2 story tall for remodel kitchen & new deck. | $180,000 |
| Jun 27, 2017 | Completed final sign-off Sep 2019 | 1741 16th Av | addition of new unit on 1st floor. no exterior changes based on state law. to complete the unit a kitchen will be added.Details
addition of new unit on 1st floor. no exterior changes based on state law. to complete the unit a kitchen will be added. | $10,000 |
| Jun 14, 2017 | Never finaled issued Jun 2017, no final | 5 Downey St | remodel (e) kitchen, new hardwood floors throughout. new paint throughout, new double marvin doors at exterior of kitchen, change window at kitchen, new finishesDetails
remodel (e) kitchen, new hardwood floors throughout. new paint throughout, new double marvin doors at exterior of kitchen, change window at kitchen, new finishes | $80,000 |
| Mar 8, 2017 | Completed final sign-off Nov 2017 | 210 Magellan Av | remodel master bathroom, 1 new fixture, faucets, cabinets, tile, stone and paint. replace kitchen cabinets and new tile, re-finish 1st floor hardwood floors. new cabinets in dining room. paint interior of house. no structural work.Details
remodel master bathroom, 1 new fixture, faucets, cabinets, tile, stone and paint. replace kitchen cabinets and new tile, re-finish 1st floor hardwood floors. new cabinets in dining room. paint interior of house. no structural work. | $60,000 |
| Feb 24, 2017 | Expired or cancelled expired Mar 2026 | 315 Mississippi St | interior remodel of kitchen & bath in single family home, no new square footage, new windows & french door in remodeled rooms only, structural repair in crawl spaceDetails
interior remodel of kitchen & bath in single family home, no new square footage, new windows & french door in remodeled rooms only, structural repair in crawl space | $75,000 |
| Jan 26, 2017 | Completed final sign-off Oct 2017 | 159 Monterey Bl | remodel (e) kitchen - demo cabinets and floor finish, install new cabinets, countertops, hardwood floor, plumbing fixtures and appliances to same location. tile and paint. no structural to be performed.Details
remodel (e) kitchen - demo cabinets and floor finish, install new cabinets, countertops, hardwood floor, plumbing fixtures and appliances to same location. tile and paint. no structural to be performed. | $35,000 |
| May 25, 2016 | Completed final sign-off Aug 2016 | 2030 03rd St | remove floor tile plumbing fixtures & cabinets in 1 bedroom & replace w/ new. remove & replace peninsula floor tile. reinstall (e) sink, faucet & dishwasher. paint kitchen & bathroom & install new cabinet hardware work in unit #12 only. light, hood to remain. n/a for maher.Details
remove floor tile plumbing fixtures & cabinets in 1 bedroom & replace w/ new. remove & replace peninsula floor tile. reinstall (e) sink, faucet & dishwasher. paint kitchen & bathroom & install new cabinet hardware work in unit #12 only. light, hood to remain. n/a for maher. | $40,000 |
| Nov 3, 2015 | Completed final sign-off Jan 2017 | 370 Lexington St | remodel kitchen on 1st fl and bedroom/bath on 2nd fl. add access stair to garage. replace window sashes.Details
remodel kitchen on 1st fl and bedroom/bath on 2nd fl. add access stair to garage. replace window sashes. | $60,000 |
| Oct 7, 2015 | Never finaled issued Oct 2015, no final | 737 03rd St | t.i. for an (e) restaurant. work includes replace/re-arrange kitchen equipment/sinks. to comply with health code, re-arrange seating area to comply with accessibility requirements in response to nov 201570861. maher naDetails
t.i. for an (e) restaurant. work includes replace/re-arrange kitchen equipment/sinks. to comply with health code, re-arrange seating area to comply with accessibility requirements in response to nov 201570861. maher na | $15,000 |
| Jul 2, 2015 | Completed final sign-off Feb 2016 | 323 Quintara St | interior remodel / renovation including remval of selected partition walls, new kitchen cabinets & fixtrues, no exterior work.Details
interior remodel / renovation including remval of selected partition walls, new kitchen cabinets & fixtrues, no exterior work. | $10,000 |
| Jun 10, 2015 | Completed final sign-off Mar 2016 | 460 Ellsworth St | interior remodel/renovation including removal of selected partition walls, remodel/enlarge bathroom, at 1st floor level, remodel enlarge bedroom at 1st floor level. new kitchen cabinets and fixtures. no exterior work.Details
interior remodel/renovation including removal of selected partition walls, remodel/enlarge bathroom, at 1st floor level, remodel enlarge bedroom at 1st floor level. new kitchen cabinets and fixtures. no exterior work. | $60,000 |
| Sep 2, 2014 | Completed final sign-off Nov 2015 | 151 Duncan St | interior remodel unit 151a; remodel kitchen on 1st floor & new furnace. comply with complaint no. 201039651 item #2.Details
interior remodel unit 151a; remodel kitchen on 1st floor & new furnace. comply with complaint no. 201039651 item #2. | $50,000 |
| Jul 1, 2014 | Never finaled issued Jul 2014, no final | 30 Santa Rita Av | remodel kitchen, bathrooms and deck. fill in recess at rear 1st flr. replace window & door on west facade and install french door on north facadeDetails
remodel kitchen, bathrooms and deck. fill in recess at rear 1st flr. replace window & door on west facade and install french door on north facade | $50,000 |
| Jun 16, 2014 | Completed final sign-off Aug 2014 | 190 Seacliff Av | install new cabinet doors and drawer front, crown molding and paint walls ceiling and trim, new hardware for doors & drawers, work to be performed in the kitchen only.Details
install new cabinet doors and drawer front, crown molding and paint walls ceiling and trim, new hardware for doors & drawers, work to be performed in the kitchen only. | $25,000 |
| Mar 17, 2014 | Completed final sign-off Aug 2014 | 17 West Clay St | remodel kitchen & add new deck & stair less than 30 " on grade off kitchen.Details
remodel kitchen & add new deck & stair less than 30 " on grade off kitchen. | $20,000 |
| Mar 6, 2014 | Completed final sign-off Aug 2014 | 1684 09th Av | add 4 skylights and remove partition wall in kitchen and dining room. kitchen remodel under seperate permit #201402289559Details
add 4 skylights and remove partition wall in kitchen and dining room. kitchen remodel under seperate permit #201402289559 | $3,000 |
| Feb 28, 2014 | Completed final sign-off Aug 2014 | 1684 09th Av | remodel existing kitchen, new tile, stone countertops, ktichen cabinets, drywall, wood floor, and paint and new appliances. no change of wall, door and windowDetails
remodel existing kitchen, new tile, stone countertops, ktichen cabinets, drywall, wood floor, and paint and new appliances. no change of wall, door and window | $30,000 |
| Sep 19, 2013 | Completed final sign-off Jun 2014 | 930 Anza St | interior remodel of (e) kitchen, dining room, living room. remove 3 windows & 1 door. add 2 windows & 1 door. plywood strengthening work under this permit.Details
interior remodel of (e) kitchen, dining room, living room. remove 3 windows & 1 door. add 2 windows & 1 door. plywood strengthening work under this permit. | $45,000 |
| Jul 17, 2013 | Completed final sign-off Nov 2013 | 2201 Sacramento St | kitchen remodel: demo (e) cabinets, countertops, floor coverings, install new cabinets, countertops, floor coverings. upgrade electrical and plumbing and paint. no structural work.Details
kitchen remodel: demo (e) cabinets, countertops, floor coverings, install new cabinets, countertops, floor coverings. upgrade electrical and plumbing and paint. no structural work. | $20,000 |
| Jun 7, 2013 | Completed final sign-off Aug 2013 | 3743 Fillmore St | demo (e) bathroom & kitchen down to studs & remodel bathroom, new cabinets, countertops, plumbing, electrical, tile work, trim & paint.Details
demo (e) bathroom & kitchen down to studs & remodel bathroom, new cabinets, countertops, plumbing, electrical, tile work, trim & paint. | $50,000 |
| Apr 3, 2013 | Completed final sign-off Aug 2013 | 1834 11th Av | reconfigure & remodel kitchen. remove (e) skylight and replace with 2 (n) skylights in kitchen, not visible from street.Details
reconfigure & remodel kitchen. remove (e) skylight and replace with 2 (n) skylights in kitchen, not visible from street. | $20,000 |
| Jan 15, 2013 | Completed final sign-off May 2013 | 950 Monterey Bl | reconfigure & remodel baths, add one new bath, remodel kitchen, rebuild (e) interior stair, replace wood windows, not visible from street. new skylight on flat roof.Details
reconfigure & remodel baths, add one new bath, remodel kitchen, rebuild (e) interior stair, replace wood windows, not visible from street. new skylight on flat roof. | $75,000 |
| Jan 9, 2013 | Completed final sign-off Jun 2015 | 1640 Fulton St | demolish non-complying rear addition & replace w/(n)terraced addition consisting of family rm, kitchen, master suite & playrm. raise rear portion of roof to legalize 4th fl & add(n)connecting stair. add(n)bath @ 4th fl. (n)roof decks, exterior rear stair & green roof. update foundation. fully sprinkDetails
demolish non-complying rear addition & replace w/(n)terraced addition consisting of family rm, kitchen, master suite & playrm. raise rear portion of roof to legalize 4th fl & add(n)connecting stair. add(n)bath @ 4th fl. (n)roof decks, exterior rear stair & green roof. update foundation. fully sprink | $100,000 |
| Oct 5, 2012 | Never finaled issued Jan 2014, no final | 205 Frederick St | new limited restaurant use accessory to market in (e) deli location. install new odor abatement system at (e) kitchen exhaust system. new counter.Details
new limited restaurant use accessory to market in (e) deli location. install new odor abatement system at (e) kitchen exhaust system. new counter. | $350 |
| Oct 4, 2012 | Completed final sign-off Jan 2013 | 1760 Greenwich St | remodel kitchen: new cabients, countertops, add cans to ceilings, refinish hardwood floors, paint entire unit, replace tiles in bathroom.Details
remodel kitchen: new cabients, countertops, add cans to ceilings, refinish hardwood floors, paint entire unit, replace tiles in bathroom. | $35,000 |
| Apr 11, 2012 | Never finaled issued Apr 2012, no final | 141 Hampshire St | install new tile in 3 bathrooms, new countertop in kitchen, replace existing hardwood floors on 2nd level and refinish on 1/f. install new baseboard, new book case, paint all new work, no structural work.Details
install new tile in 3 bathrooms, new countertop in kitchen, replace existing hardwood floors on 2nd level and refinish on 1/f. install new baseboard, new book case, paint all new work, no structural work. | $60,000 |
| Nov 1, 2011 | Completed final sign-off Oct 2012 | 131 San Aleso Av | remodel (e) kitchen and adjacent bath & stair areas to include new kitchen, laundry and power room. add new exterior door landing and stair to grade. remodel master bath.Details
remodel (e) kitchen and adjacent bath & stair areas to include new kitchen, laundry and power room. add new exterior door landing and stair to grade. remodel master bath. | $80,000 |
| May 9, 2011 | Completed final sign-off Aug 2011 | 152 Lombard St | remodel 2 baths, 1 kitchen. new tile in baths, 2 counters in kitchen trim package, plumbing fixt, hardwood floors, paint interior walls and trim, new wall light sconces. wall trim and baseboard. no change in wall and opening layout. comply with cfc 150 k lighting req.Details
remodel 2 baths, 1 kitchen. new tile in baths, 2 counters in kitchen trim package, plumbing fixt, hardwood floors, paint interior walls and trim, new wall light sconces. wall trim and baseboard. no change in wall and opening layout. comply with cfc 150 k lighting req. | $60,000 |
| Jun 28, 2010 | Completed final sign-off Jan 2011 | 135 Caselli Av | demo existing kitchen cabinets & counter top replace with new cabinets, & counter top patch floor tile, patch sheetrock add elec wall outlets and under cabinet lights, no other work ; at least 50% highe efficacy lighting (by wattage)Details
demo existing kitchen cabinets & counter top replace with new cabinets, & counter top patch floor tile, patch sheetrock add elec wall outlets and under cabinet lights, no other work ; at least 50% highe efficacy lighting (by wattage) | $6,300 |